Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 43985 +
- ENS 45390 +
- ML17318A675 +
- ML17318A627 +
- ML17318A436 +
- ML17317B203 +
- ML17317A813 +
- 05000280/LER-1990-001-03, :on 900314,emergency Svc Water Pumps Declared Inoperable Due to Emergency Shutdown Device Being in Tripped Condition.Caused by Procedural & Training Deficiencies. Procedures Changed & Training Enhanced +
- ML18143B509 +
- ML19343B972 +
- ML20028D531 +
- ML19325D193 +
- ML19317D492 +
- ML19319C223 +
- ML20039G065 +
- IR 05000244/2004004 +
- ULNRC-04898, Request for NRC Regional Enforcement Discretion +
- ML032660027 +
- 05000311/LER-1982-057, Forwards LER 82-057/03L-0.Detailed Event Analysis Encl +
- ML20069K106 +
- ML20086K586 +
- ML20083L369 +
- ML20080Q108 +
- ML20101C347 +
- ML20097D158 +
- ML20107B445 +
- ML20101D905 +
- ML20108F188 +
- ML20072C423 +
- ML20137V082 +
- ML20128N261 +
- ML20153C476 +
- ML20207C293 +
- IR 05000315/1987006 +
- ML20212E280 +
- ML20248B596 +
- ML20236N989 +
- NRC-89-0026, Special Rept:On 890127,active Seismic Monitor Playback Unit Taken Out of Svc for Routine Channel Calibr,Resulting in Seismic Monitoring Sys Being Inoperable for 30 Days.Caused by Failure of Unit Drive Motor.New Sys Being Evaluated +
- ML20235J596 +
- NL-89-315, Monthly Operating Rept for Feb 1989 for Rancho Seco Nuclear Generating Station +
- 3F0397-01, LER 97-S01-00:on 970130,maint Activities in Circulating Water Sys Resulted in Protected Area Breach.Caused by Failure to Identify Security Function of Plant.Armed Security Was Established +
- ST-HL-AE-3128, Special Rept:On 890523,24 & 0608,diesel Generator 13 Tripped During Testing Procedures.First Failure Caused by Increased Resistance Across Contacts of Unit Parallel Mode & Second & Third Failures by Inadequate Air Flow.Contacts Cleaned +
- IR 05000341/1987024 +
- U-601991, Ro:On 920522,discovered That External Vessel Surface Was Hot & Chart Recorder Indicated Absorber Bed Temp Greater than 300F.Fire Brigade Was Activated.Sampling Process Established to Monitor Purge Exhaust Composition +
- BVY-96-001, Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station +
- 1CAN098305, Monthly Operating Rept for Aug 1983 +
- ML23328A016 +
- 05000219/LER-1989-011, :on 890422,equipment Operator Failed to Properly Align Seal Water Makeup Supply.Caused by Oversight by Operator.Procedures in Hand Requirement Shall Apply to Evolution +
- 05000373/LER-1989-022, :on 890810,RCIC Received Div I & Div II Isolation on RCIC High Steam Line Flow.Caused by Spurious High Steam Flow Signal.Rcic Sys Piping Integrity Verified & Isolation Logic Reset +
- 05000374/LER-1989-003, :on 890128,shutdown Cooling Inboard Suction Isolation Valve Closed,Causing Train to Shutdown & ESF to Actuate.Caused by Technician Inattention to Detail. Guidelines Re Partial Surveillance Issued +