Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
-. .
I . -
NARRATIVE SUMERY OF
!OtmILY OPDMTIllG DGUtIDJCE UNIT 1 NOVDGER 1991 November 1 The Unit remained shutdown in Mcde 5 as repairs continucd on through the "A" and "B" ' liver Water Pugn.
McVerber 4 November 5 At 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> the Unit entered Mode 4.
11ovember 6 At 0703 hours0.00814 days <br />0.195 hours <br />0.00116 weeks <br />2.674915e-4 months <br /> the Unit entered Mode 3. Unit .2atup was discontinued ard shutdown to Mode 5 was excero d at 1325 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.041625e-4 months <br /> for repairs to the "C" Reac+or coulant Pump. ihe Unit entered Mode 4 at 1850 hours0.0214 days <br />0.514 hours <br />0.00306 weeks <br />7.03925e-4 months <br />.
November 7 At 0617 hours0.00714 days <br />0.171 hours <br />0.00102 weeks <br />2.347685e-4 months <br /> the Unit entered Mode 5 for repairs to the "C" lbactor Coolant Ptury.
11ovember 8 The Unit rtmained shutdowr in Mode 5 as repairs continued on though the "C" Reactor Coolant Pump.
November 24 November 25 At 3158 hours0.0366 days <br />0.877 hours <br />0.00522 weeks <br />0.0012 months <br /> the Unit entered Mode 4. At 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> the Unit entered Mode 3.
Novenber 26 The Unit remained in li.do 3 for testilvJ and repairs to the through Turbine Driven Auxiliary Feedwater Pump.
Noverrber 27 November 28 At 1537 hourn the Unit entered Mode 2, ard the reactor was taken critical at 1620 hours0.0188 days <br />0.45 hours <br />0.00268 weeks <br />6.1641e-4 months <br />. At 2047 hours0.0237 days <br />0.569 hours <br />0.00338 weeks <br />7.788835e-4 months <br /> the Main Unit Generator was synchronized to the grid, and the Unit began power ascensica to 100% output.
November 29 The Unit continued power ascension to 100% output.
Naverber 20 The Unit achieved 90% output at 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> while continuity power ascensicx1 to 100% output.
1 9112130193 911.130 PDR ADOCK 05000334 R pDR
- e '
AVERAGE IAILY Ut(IT IGER ILYEL IXX7EI' 110. - 50-334 UtIIT IfVis Unit 1 IMTE 1 9, 6.-1991 00MFIffED BY Jhvid T. Jonm-TE!Fillot1E (412) 393-7612 -
M3tfl11 11ovemt;w1r 1991 IMY AVERAGE IRILY ICWER LEVEL IMY AVERAGE IRILY IURE I.EVEL (W-Alot) (!440-11ct) ,
1 0. 17 0 2- 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0
-6 0 22 0 7 0- 23 0 8 0 24 0 9 0 25 0 10 0 26 0
.11- 0 27 _
0 12 0 28 0 13 0 29 140 14 0 30 475 15 0 31 -
16 0 INSTRUCTIONS 1 On this fornat, ' list the average daily unit pctser level !Ee-Net for each day in the reportirq nonth. Ctzpute to the rc.arest whole megawatt.
=
OPERATING DATA REPORT DOCKET No.: 50-334 REPORT DATE: 12/06/91 COMPLETED BY: DAVID T. JONES TELEPliONE: (412) 393-7612 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: NOVEMBER 1991
- 3. LICENSED THERMAL POWER (MVt): 2652
- 4. NAMEPLATE RATING (Gros ; MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MVa): 835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
- 8. IF CllANGES OCCUR IN CAPACITY RATINGS CINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VillCH RESTRICTED, IF ANY (Not MWo): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONT}i YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD: 720.0 8016.0 136608.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 55.7 4285.2 84579.6
- 13. REACTOR RESERVE SHUTDOWN 110URS: 0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE: 51.2 4142.2 82687.2
- 15. UNIT RESERVE SilUTDOWN HOURS. 0.0 0,0 0.0
- 16. CROSS TilERMAL ENERGY GEN. (MWH): 60240.0 10255749.0 196544196.5
- 17. GROSS ELECT, ENERCY GEN. (MVil): 17776.0 3313644.0 63146373.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 6320.0 3086900.0 58951100.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 7.1 51.7 62.6
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 7,1 51.7 62.6
- 21. UNIT CAPACITY FACTOR (MDC): PCT 1.1 47.5 56.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 1.1 46.1 54.3
- 23. U!IIT FORCED OUTAGE RATE: (PERCENT) 92.9 26.0 16.9
- 24. SilUTDOWNS SCHEDUIED OVER NEXT SIX MONTilS (TYPE,DATE, AND DURATION OF EACll):
- 25. . IF SilU'I ". AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN 'iEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICIT'a N/A N/A COMMERCIAL OPERATION N/A N/A 1
tWU1ATIVE SUltfARY OF POfflHLY OPERATIllG LN1TRIDJCE UNIT 2
!KNIMBD1 1991 November 1 Tho Unit cperated at a ncunimi value of 1001, output, through Novenber 14 Novenbar 15 At 2101 hours the Unit conmenced lmd rxduction to approximtely 83% output to clean Main condencer watertoxes.
November 16 The Unit rumincd at approximtely 83% output as cleaning continued on the Main Condenser watertxaxes.
Novemler 17 At 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> the Unit began escalation to a nomimi value of 100% output.
November 18 At 0150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> the Unit's output was returnod to a nomimi value of 100%.
November 19 The Unit operated at a ncznimi value of 100% output.
thttugh November 25 November 26 At 1143 hours0.0132 days <br />0.318 hours <br />0.00189 weeks <br />4.349115e-4 months <br /> the Unit tripped due to an anomly with an CIC relay in the 7brbim Electrahydraulic Control (UlC) Systa.
November 27 At 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> the Unit entered Mode 2, and the reactor was taken critical at 1448 hours0.0168 days <br />0.402 hours <br />0.00239 weeks <br />5.50964e-4 months <br />. The Unit enterxd Mode 1 at 2050 hours0.0237 days <br />0.569 hours <br />0.00339 weeks <br />7.80025e-4 months <br />.
November 28 At 0332 hours0.00384 days <br />0.0922 hours <br />5.489418e-4 weeks <br />1.26326e-4 months <br /> the Unit was synantonized to the grid, and the Unit bogan power ascension to approximtaly 461L cutput to load follow. At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> the Unit achieved a nomiml value of 46%
output.
November 29 The Unit rannined at approximtely 46% output to load follow.
thro 2gh November 30 g ll' L . . ,
~ -
AVERAGE DAILY UNIT IOiER ILVEL 00ChTT NO. 50-412 UNIT INIG Unit 2 DATE Dec. 6, 1991 COMPlffED BY Dwid T. Jones -
'ILTElliotTE ,_1112d_19.)-7612_
M0ffI11_Ligtember 1991 DAY AVERAGE IAILY IO4R ILVEL IMY AVERAGE DAILY IOYER LEVEL (MWo-Net) (t4fo-Net) 1 810 17 685 2 813 18 - 811 3 816 19 804 4 815 20 801 5 815 21 808 6 810 22 809 7 813 23 807 8 813 _ 24 808 9 812 25 807 l 10 __
E15 26 379 i
l 11 813 27 0 12 810 28 237 13 809 29 124 l
1 14 810 30 329 15 791 31 -
16 668 INSITUCTIONS:
On this format, list the average daily unit power level 141e-Net for each dcj in the reporting month. Oc apute to the nearest whole megawatt.
l t
l l
OPERATING DATA REPORT DOCKET NO.. 50-412 REPORT DATE: 12/06/91 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7612 OfERATING STM1LS
- 1. UNIT NAME: BEAVER VALLEY P0kER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: NOVEMBER 1991
- 3. LICENSED THERHAL POWER (MWt): 2652 4 NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS: g M
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None ___
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULiTIVE ,
- 11. HOURS IN REPORTING PERIOD: 720.0 8016.0 35391.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 692.9 7988.9 30336.2 13 REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE: 680.2 7976.2 30138.0 ,
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENET.JY CEN. (MWH): 1674762.0 20596084.0 73723100.4
- 17. GROSS ELECT. LNERGY GEN. (MWH): 538796.0 6612021.0 23648821.0
- 18. NET ELECTRICAL ENERGY CEN. (MWH): 509060.0 6266P17,0 22310141.0 -
- 19. UNIT SERVICE FACTOR: (PERCENT) 94.5 99.5 85.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 94.5 99.5 85.2
- 21. UNIT CAPACITY FACTOR (MDC): PCT 86.2 95.3 76.1
- 22. UNIT CAPACITY FACTOR (DER): PCT 84.6 93.5 75.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 5.5 0.5 4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
THE UNIT IS SCHEDULED TO R U1DOWN FOR IT'S THIRD REFUELING OUTAGE ON HARCH 13. 1992. THE REFUELING OUTAGE IS SCHEDULED TO 1AST FOR 70 DAYS.
- 25. !F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
i
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A E -_ _ _ . _ _ . . _ . ____ _ _ _ _ _ _ _ _ . _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ ____
UNIT SHUTDOWNS AND POWER REDUCTIONS (120%) Docket No. 50-412
Date December 6. 1991 Compl e t ed B y David T. Jones REPORT M0mTH NOVEMBER 1991 Tenephone (412) 393-7612 Method of Licensee C 3use & Cerrective Duration Shutting Event System Component Action to No. Date Typet (Hours) Reason 2 Down Reactor 3 Report # Code 4 Code $ Prevent Recurrence 12 911115 F 0 8 5 N/A NC MTEXCN Unit's output reduced from 100% to 83% to permit cleaning the ma*.er - ,
boxes of the Unit's Main Condenser.
13 911126 F 39.8 A 3 2 s. MA RELAYX Unit tripped after a malfunction in the Unit's Turbine Electrohydraulic Contrct (EMC) System.
14 911128 S 0 M 5 N/A 24 ZZZZZZ Unit operated at 46% output to load follow.
1 2 3 4 F-forced Reason: Method: Exhibit F-Instructions for S-Scheduled A-Equipment Falture (Explain) 1 -M ar'Ja t Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Cvent Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161). ,
D-Regulatory Restriction 4-Cont'd. f r om Previous Month 4 E-Operator Trair.ing & License Exam 5-R educt i on 5 F-Administrative 9-Other Exhibit N-Same Source.
G-Operational Error (Explain)
H-Other (Explain)