Monthly Operating Rept for Nov 1984
ML20101D905
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 11/30/1984
From: Brons J, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP-LK-3962, NUDOCS 8412260072
Download: ML20101D905 (8)


Text

. _ . -

i

.e , ,

OPERATLNG DATA REPORT DOCKET NO. 50-236 DATE 12/1/84 COMPLETED BY L. h11v TELEPHONE '914) 739-8200 OPERATING STATUS '

bOI'5

l. Unit Name: Indian Point No. 3 Nuclear Power Plant
2. Reporting Period: November 1984
3. Licensed Thermal Power (MWt): 3025
4. Nameplate Rating (Gross MWe): 1013
5. Design Electrical Rating (Net MWe): '965
6. Maximum Dependable Capacity (Gross MWe): 1000
7. Maximum Dependable Capacity (Net .MWe): 965
8. If Changes Occur in Capacity Ratingi(Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr..to.Date Cumulative ,

11. Hours in Reporting Period 720 8040 72.361.0
12. Number Of Hours Reactor Was Critical 86.55 6197.73 40,622.23
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On.Line 77.17 5961.94 39,103.94
15. Unit Reserse Shutdown Hours 0 o n
16. Gross Thermal Energy Generated (MWH) 93305.37 17,050.551.46 103.476.106.46
17. Gross Electrical Energy Generated (MWH) 28,710 5.547.49s 11 ot a nu n
18. Net Electrical Energy Generated (MWH)

"' 5,339,038 30,583.216.0

19. Unit Service Factor 10.7 74.2 54 n
20. Unit Availability Factor 10.7 74.2 54.0 3.7 68.8 46.1*
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 3.7 68.8 43.8 23, Unit Forced Outage Rate 0.0 12.7 99 1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
  • Weighted Average Cycle 4/5 Refueling Outage (Est. June 1985) 25 If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units In Test Status IPrior to Commercial Operation): Forecast ' Achiesed i INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION 8412260072 841130 PDR ADOCK 05000286 g l R-PDR - _ - . _ - . _ _ . . - . . . _ _

b

. . AVERAGE DAILY UNIT POWER LEVEL

' DOCKET NO. 50-286 Indian Point

, UNIT No. 3 12-1-84 DATE COMPLETED BY L* K*llY TELEPHONE (914) 739-8200 November 1984 3 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) iMWe Net)

I ^ l7 0 2

0 18 3 n 39 0 4 0 20 0 0 5 21 6 0 0 22 7

0 0 23 g o 24 0 9 0 25 0 0 0 10 26 l1 0 27 1 12 0 322 28 0 335 13 39 0 422 14 30 0 _

15 3l 16 INSTRUCTIONS On this format. list the average daily unit power leselin MWe Net for each day in the reporting anonth. Compute to the nearest whole megawatt.

(9177)

L

9 i

? .

I DOCKE1?lO. 50-286 UNil SilUTDOWNS /.ND POWER REDUCUONS UNIT NAME Tmmn r>n i n

  • um3

! DATE 19 /1/na Con 4PLETED BY r_ _ em, 3 ,f REPORT MONUf November TELEPHONE '314-730-8200 l .. i

== f e r.

= u. :t c

. .2 E E f E ~:4 Licensee E, ., Cause & Correceive No. Date g gg g ,c g 5 Event ay {*3 a- o Actiem so I b c55 5 ~

INmwt # NO h' Psesent Recussence -

2 (5 cg u l d 12 841013 S 642.83 B 1 84-014-00 IIJ IITEXCII F Unit renoved from service for Mid Cycle Stean Generator Insocction.

t During a nanual shutdown the unit emerienced a reactor trip signal, causing the shutdown and control rod

. banks to be inserted automatically.

The reactor was subcritical in the Ilot shutdown condition at the time the trip signal was generated. The trip l signal was caused bv a blown fuse on ,

( the intermediate range. Refer to LER 84-014-00.

l l

1 2 3 4 F: Finced Reases: Mellmd: I stubis F-:.0,1:nctions S: Scheduled A-Equipment Failure (Explain) I-Manual los Piepas.ition of Data B-Maintenance of Test 2-Manual Scram. I niiy Sheets 1.n I.scemec C Refueling 3 Automatic Scrani. B sen Repini e i i 101 ile iNtlRI~G-D Regulatory Restriction 44hher iExplam) 01611 E-Operator Training & License lixamination F-Adneinistrative 5 G4)perational Esros (Explain) I shihis II S.nne Sonice 19/77) II-Other (Explain)

.c - -- - . -

?

i MONTHLY MAINTENANCE CATECORY I REPORT ,

November 1984 MONTH-WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5081 11/05/84 #31 Steam Generator Body-bonnet leak Replaced body to bonnet Blowdown Valve BD-1-31 gasket. -

5421 11/05/84 #36 Service Water Trips on thermal overload Adjusted thermal overload.

Zurn Strainer 4942 11/08/84 Motor Control Center Breaker reset pushbutton Replaced reset pushbutton.

  1. 36A Breaker inoperative MOV-76 4905 11/15/584

~

Safety Injection Valves Valve stem packing leaks Repacked valves.

851A and 851B 5022 11/18/84 Pressurizer Level Root Valve stem packing leaks Repacked valves.

Stop Valves 531, 532, 533, 534, 537, 538 260D 5146 11/27/84 Containment Recirculation Valve always open Repaired air regulator.

Fan Cooler Unit #32 Drain Valve Solenoid Valve SOV-1264 5430 11/27/84 Containment Recirculation Motor cooler leaks Repaired leaking tubes.

Fan Cooler Unit #35 Motor Cooler 5446 11/27/784 Containment Recirculation Motor cooler leaks Repaired leaking tubes.

Fan Cooler Unit #32 Motor Cooler

MONTHLY I & C CATEGORY I REPORT Nov-her 1984 Month W.R. # DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 3436 11/2/84 " Independent Electrical Over- Potentiometer responds Cleaned Potentiometer.

speed Protection" Frequency erraticly.

Set Potentiometer Channel 2 3098 11/7/84 Boric Acid Flow Transmitter High loop resistance.. Shorted resistor with jumper Fr 110 at computer terminal and cali-brated.

3493 11/10/84 Loop #3 RTD Manifold Flow Flew indicator reads high. Replaced flow indicator and Indicator FIC-431 calibrated.

3520 11/17/84 Pressurizer Relief Line High Alarm inoperative. Replaced temperature controller !

Temperature Alarm TC-463 .;

and calibrated.

3432 11/18/84 31 Hydrogen Recombiner Block Valve open indication Replaced light socket and ad-Valve BV-6 light defective. justed micro switch.

3494 11/18/84 Cross Failed Fuel Detector Gauge inoperative. Replaced gauge.

Sample. Reactor Coolant Sys-tem Pressure Gauge 3448 11/20/84 Incore Thermocouples A7, P13, Thermocouples inoperative. Repaired thermocouples.

L2, N2, H13, P5, R5

__ __ _- _,_ - - . _ - ~ . - - - - . -

v MONTHLY I & C CATEGORY I REPORT

-November 1984 -

Month.

W.R. # DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 3484 11/20/84 Rod Position Indication P-A Relay Chattering. Replaced bistable and calibrated.

Bypass Bistable Bank "D" 3545 11/21/84 PORV Acoustic Monitor Channel Monitor inoperative. Replaced transducer and cable.

  1. 3 3492 11/21/84 Pressurizer Spray Valves Valve PCV-455A inopera- Replaced current / pressure transducer PCV-455A and PCV-455B tive. on both valves. Calibrated both units.

- 3556 11/23/84 Volume Control Tank Level Indicated level will Calibrated level transmitter.

Indicator LI-112 not go beyond 90%.

~

3355 11/27/84 Iodine Monitor-ChannelA Nixie tube indicators Repaired broken' connector.

are blurred.

9 N

p-m i

s- . .

+ \- . s Summary of Operating Experience November'1984 Indian Point 3 was returned to service after a 45 day Mid Cycle Steam Generator Inspection Outage.

The unit was synchronized to the bus on November 27th at 1850 hours0.0214 days <br />0.514 hours <br />0.00306 weeks <br />7.03925e-4 months <br />.

Indian Point 3 ran for a total ~of 77.17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> producing a gross generation of 28,710 MWe for this reporting period.

V T

i l

J e

I 7 g L_.

insIIen Point 3 Neoleer Power Plant

. . P. f. Box 215

  • Buchanan, NewN10511 914 739.8200
  1. > NewWrkPbwer 4# Authority December 11, 1984 IP-LK-3962 Docket No. 50-286 License No. DPR-64 Directo',r Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of November, 1984.

Very truly yours, s.

om . Brons esident Manager LK/bam Enclosures (12 Copies) cc: Dr. Thomas E. Murley, Regional Administrator Region i U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 C. A. McNeill, WP0 J. P. Bayne, WP0 S. V. Fuller, NY0 W. R. Yario, NY0 INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 t