,,,, IN0 LANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 September 27, 1983 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316
Dear Mr. Keppler:
This is to confirm a report made by our Assistant Plant Manager, Mr.
B.A.
Svensson, to Mr.
E.R.
Swanson, Senior Resident Inspector at the Donald C. Cook Nuclear Plant at 1850 hours0.0214 days <br />0.514 hours <br />0.00306 weeks <br />7.03925e-4 months <br /> on September 26, 1983.
At this time Mr. Swanson was advised that the CO 2 System for the Unit 2 Diesel Generator Room was left in an isolated condition for approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> with no personnel in the Diesel Room.
Upon discovery, this system was immediately returned to an operable status.
As required by Technical Specification 6.9.1.12, a followup report will be submitted within 14 days.
Sincerely, W.G Plant Manager ibab cc:
John E. Dolan M.P. Alexich R.F. Kroeger H. Brugger E.R. Swanson/N.E. DuBry, RO:III R.C. Callen, MPSC G. Charnoff, Esq.
J.M. Hennigan R.O. Bruggee, EPRI INPO PNSRC
\\
D' J.F.
Stietzel Ch. $
9 E.L. Townley Dir., IE (40 copies)
Dir., MIPC (4 copies) 8310120193 830927 gD gDRADOCK05000g ggy;2
......-