Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 41450 +
- ENS 46874 +
- ML13116A348 +
- ML17326A517 +
- ML17318A565 +
- ML20024A448 +
- 05000260/LER-1995-001, :on 950123,DG Turbocharger Failure Resulted in Noncompliance W/Ts Lco.Instituted Vibration Monitoring Program for EDG Turbochargers +
- ML060190085 +
- ML19343B972 +
- L-06-070, Request for Notice of Enforcement Discretion Loss of Supplemental Leak Collection and Release System Filters +
- BSEP 16-0020, Request for Notice of Enforcement Discretion (Noed), Limiting Condition for Operation (LCO) 3.0.3, Per Technical Specification 3.8.1, AC Sources - Operating +
- ML20028G083 +
- ML19316A582 +
- ML20042A367 +
- ML20039G065 +
- ML20053C217 +
- ML031750617 +
- ML021070429 +
- ML20070R081 +
- ML20087G037 +
- ML20084E195 +
- ML20083L369 +
- ML20082J700 +
- ML20078P409 +
- ML20092E932 +
- ML20117K960 +
- ML20137V630 +
- ML20147F781 +
- ML20140C442 +
- ML20127N210 +
- ML20135H305 +
- 05000219/LER-1982-056, Forwards LER 82-056/01T-0.Detailed Event Analysis Encl +
- ML20154L145 +
- ML20151F734 +
- ML20205T334 +
- ML20244B826 +
- ML20217F370 +
- ML20217E022 +
- IR 05000293/1986029 +
- L-98-576, Forwards Response to Violations Noted Insp Repts 50-266/98-12 & 50-301/98-12.Corrective Actions:Two SRDs Identified to Be Out of Calibr Replaced W/Calibrated SRDs on 980322 +
- NPL-98-0576, Forwards Response to Violations Noted Insp Repts 50-266/98-12 & 50-301/98-12.Corrective Actions:Two SRDs Identified to Be Out of Calibr Replaced W/Calibrated SRDs on 980322 +
- NG-75-1212, Revised AO 50-261/75-11:on 750527,RCS Oxygen Concentration Found to Be 0.16 Ppm,Exceeding Limit.Caused by Inattention to Hydrogen Concentration & Dilution of RCS to Hot Shutdown Boron Concentration.Vol Control Tank Vented +
- 05000293/LER-1989-013, :on 890324,HPCI Sys Became Inoperable During Operability Surveillance Test.Caused by Turbine Steam Supply motor-operated Valve Not Opening Due to Two Loose Screws Causing Damage to Valve Operator Internals +
- 05000461/LER-1989-023, :on 890531,determined That Secondary Containment Integrity Requirements of Tech Spec 3.6.6.1 Not Met Based on Discovery,On 890410,that Air Blowing from Weep Holes of Pull Boxes.Caused by Contractor Error +
- 05000254/LER-1989-005-08, 5:on 890522,RCIC Declared Inoperable Due to Differential Pressure Indicating Switch Failure to Calibr Properly.Caused by Worn Trip Setpoint Locking Mechanism. Switch Replaced & New Switch Calibr +
- 05000344/LER-1987-033, :on 871030,all Main Steam Pressure Transmitters Found to Be 35 to 50 Psig Lower than in Previous Operating Cycles.Cause May Be Due to Combination of Instrument Drift, Inadequate Transmitters & Personnel Error +
- 05000499/LER-1989-004-01, :on 890206,radiation Monitor on Fuel Handling Bldg (Fhb) Exhaust Air Duct Went Into High Alarm & Actuated Fhb HVAC to Filtered Exhaust Mode.Cause Unknown.Actuated & Redundant Monitor Confirmed to Be in Calibr +
- 05000278/LER-1986-019-02, :on 860914,reactor Manually Scrammed Due to High Main Steam Line Radiation.Caused by Resin Injection When Pilter Demineralizer H Placed in Svc.Rwcu Sys Operated to Remove Impurities +
- 05000410/LER-1986-003-01, :on 861108,partial Loss of Secondary Containment Isolation Actuation Instrumentation Occurred. Caused by Personnel Error.Training Mod Recommendation Initiated +
- 05000400/LER-1987-006, :on 870123,charging/safety Injection Pumps 1B-SB & 1C-SAB Declared Inoperable Due to Failed Attempts to Automatically Start Train 1B-SB Chiller.Caused by Chiller Tripping on Overload.Plant Cooldown Initiated +