Limerick Consrating Ctatlon PECO ENERGY TeJ".Is """"""

Sanatoga PA 19464 0920 l

t t

T.S.6.9.1.6 i

February 13, 1995 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 j

U.

S. Nuclear Regulatory Commission f

Attn:

Document Control Desk l

Washington, DC 20555 L

Subject:

Limerick Generating Station Monthly Operating Report For Units 1 and 2 i

Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of January 1995 forwarded pursuant to Technical Specification 6.9.1.6.

Very truly yours, f

i Qlb es A. Muntz Director - Site Engineering l

l' drh Enclosures cc:

T. T. Martin, Administrator, Region I, USNRC (w/ enclosures) f N.

S. Perry, USNRC Senior Resident Inspector LGS (w/ enclosures)

D.

R. Helwig, Vice President, Limerick Generating Station 9502170054 950131 PDR ADOCK 05000352

/'

'h5 R

PDR

F 4

Docket No. 50-352 Attachment to Monthly Operating Report for January 1995 Limerick Generating Station 7

Unit 1 January 1 through January 31, 1995 I.

Narrative Summarv of Operatino Experiences Unit 1 began the month of January at a nominal 100% of rated thermal power (RTP).

6 On January 2, 1995, at 0004 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, power reduction began in preparation to rework the 1B reactor recirculation punp seal.

Power was reduced to 21.2% RTP.

During the powar reduction the seal stabilized and cavity pressure returncd to normal.

The situation was reviewed and it was determined that the recirculation pump seal would not be reworked at this time.

Power was returned to 100% RTP on January 3, t

1995, at 2235 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.504175e-4 months <br />.

On January 15, 1995, at 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br />, power was reduced to 90%

RTP for main turbine valve testing.

Power was restored to 100% RTP at 1434 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.45637e-4 months <br />.

I On January 22, 1995, at 0412 hours0.00477 days <br />0.114 hours <br />6.812169e-4 weeks <br />1.56766e-4 months <br />, power was reduced to 70%

RTP for a control rod pattern adjustment and scram time testing.

Power was restored to 100% RTP at 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br />.

On January 23, 1995, at 1254 hours0.0145 days <br />0.348 hours <br />0.00207 weeks <br />4.77147e-4 months <br />, power was reduced to 80%

RTP for troubleshooting of a control valve pressure switch.

Power was restored to 100% RTP at 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />.

On January 30, 1995, at 0748 hours0.00866 days <br />0.208 hours <br />0.00124 weeks <br />2.84614e-4 months <br />, the 1A Recirculation Pump motor generator set tripped when a contract worker bumped into the MG set cabinet.

Power was stabilized at 35%

RTP.

The recirculation MG set was restarted at 1116 hours0.0129 days <br />0.31 hours <br />0.00185 weeks <br />4.24638e-4 months <br /> and power ascension began at 1242 hours0.0144 days <br />0.345 hours <br />0.00205 weeks <br />4.72581e-4 months <br />.

Power was restored to 100% RTP at 1037 hours0.012 days <br />0.288 hours <br />0.00171 weeks <br />3.945785e-4 months <br /> on January 31, 1995.

Unit 1 ended this operating period at 100% of RTP.

II.

Challences to Main Steam Safety Relief Valves i

There were no challenges to the Main Steam Safety Relief Valves during the month of January.

i

t

'~..

,f QUERAGE DAILV UNIT POWEQ LEVEL 4

j DOCKET NO. 50 - 352 1

UNIT LIMERICK UNIT 1 l

DATE FEBRUARY 13 1995 COMPANY PkCO ENERGY r,6N5NY STEVEN J.

KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3763 MONTH JANUARY 1995

=--.--.---

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-NET)

(MWE-NET) 1 1064 17 1061 r

2 446 18 1068 t

3 928 19 1065 t

4 4

1065 20 1057 5

1068

'21 1061 6

1064 22 922 7

1064 23 1021 8

1064 24 1066 9

1068 25 1066 10 1068 26 1065

)

11 1064 27 1059 12 1069 28 1065 13 1061 29 1066 14 1053 30 712 15 1034 31 1039 1

16 1058 I

_ _ _ _ _. _ _. ~. _. _,. _ _ _ _ _ _ _,. _,, _. _ _ _. _, _ _ _ _.... _ _...., _.. _ _ _, _.,... _.. _.... _..., _..... _,,.. _.. -

OPERATING DATA ttEPORT DOCKET NO. 50 - 352 DATE FEBRUARY 13, 1995 COMPLETED BY PECO ENERGY COMPANY STEVEN J.

KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 713-3763 OPERATING STATUS 6

__=--

_==

l l

1. UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WERE 3 LOAD DROPS

- = - -.. _.

2.

REPORTING PERIOD:

JANUARY. 1995 GREATER THAN 20% THIS MONTH.

_ = -. - - -

3. LICENSED THERMAL POWER (MwT):

3293 RECIRC PUMP MAINTENANCE.

4 NAMEPLATE RATING (GROSS MwE):

1138 CONTROL ROD PATTERN ADJUSTMENT

5. DESIGN ELECTRICAL RATING (NET k):

1055 AND M/G SET TRIP.

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092

7. MAXIMUM DEPENDABLE CAPACITY (NET MwE):

105h 8.

IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7 SINCE LAST REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):

i

10. REASONS FOR RESTRICTIONS. IF ANY:

I THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 744 78.888
12. NUM8ER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 64.852.3 1

=--- _

= - -

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

.-=

--.=.-

14 HOURS GENERATOR ON-LINE 744.0 744.0 63.769.5 a

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

__=

= - _

16. GROSS THERMAL ENERGY GENERATED (MWH) 2.353.272 2.353.272 196.669.810 17 GROSS ELECTRICAL ENERGV GENERATED (MWH) 78h 2bb 785.2bO 63.969.480

=

-. =

18. NET ELECTRICAL ENERGY GENERATED (MwH) 759.134 759,134 61.403.140 PAGE 1 OF 2

OPERQTING DQTQ CEPORV (CONTINUED)

DOCKET NO. 50 - 352

=_.-- _

t DATE FEBRUARY 13 1995 THIS MONTH VR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 100.0 80.8
20. UNCT AVAILABILITY FACTOR 100.0 00 0 8b 8
21. UNIT CAPACITY FACTOR (USING MDC NET) 96.7 96.7 73.8
22. UNIT CAPACITY FACTOR (USING DER NET) 96.7 96.7 73.8 l
23. UNIT FORCED OUTAGE RATE O.0 0.0 4.2 l

24 SHUTDOWNS SCHEDULED OVFR NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF LACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

FORECAST ACHIEVED i

j INITIAL CRITICALITV 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 4

PAGE 2 OF 2 4

--na-.

m

~a

..----~w w--. -, + -.-+

-.ea tr e-e~

C UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO. 50 - 352 UNIT NAME LIMERICM UNIT 1

..=

- =-_

DATE FEBRUARY 13 1995 REPORT MONTH JANUARY. 1995 COMPLETED BY PkCb kNkRGECOMPANY

= - - - -

-- =--

STEVEN J. KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) T18-3763 l

METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TVPElDURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO MO.

DATE (1)l (HOURS)

(2)

REACTOR (3)

REPORT s (4)

(5)

PREVENT RECURRENCE

_ - _ - - =--

43 950102 5

000.0 8

4 N/A CB PUMPXX REACTOR POWER WAS REDUCED TO 21.1% DUE TO RECIRC PUMP MAINTENANCE.

43 950115 S

000.0 B

4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 90% FOR MAIN TURBINE VALVE TESTING.

47 950122 5

000.0 8

4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 70% DUE TO CONTROL RCD PATTERN ADJUSTMENTS.

43 950123 5

000.0 8

4 N/A CC INSTRU REACTOR POWER WAS REDUCED TO 80% DUE TO A CONTROL VALVE PRESSURE SWITCH.

49 950130 F

000.0 H

4 N/A CB GENERA REACTOR POWER WAS REDUCED TO 35% DUE TO A TRIPPED M/G SET.

(1)

(2)

(3)

(4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTR1CTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE

Docket No. 50-353 Attachment to Monthly Operating Report for January 1995 Limerick Generating Station Unit 2 January 1 through January 31, 1995 I.

Narrative Summary of Operatina Experiences Unit 2 began the month of January at 63.7% of Rated Thermal Power (RTP) in end-of-cycle coastdown.

Power reduction occurred throughout this operating period due to end-of-cycle coastdown.

On January 15, 1995, at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, power was reduced to 30%

RTP for scaffold erection in preparation for refueling activities.

Scaffold erection was completed and power ascension began at 1535 hours0.0178 days <br />0.426 hours <br />0.00254 weeks <br />5.840675e-4 months <br />.

At 1650 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.27825e-4 months <br />, at 37% RTP, the Unit entered single loop operation when the 2B Reactor Recirculation Motor-Generator (MG) set was removed from service in order to work on the 2B MG set ground detection system.

On January 17, 1995, at 0003 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, power was increased to 43.4% RTP.

On January 18, 1995, at 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br />, power was reduced to 35%

RTP due to a 2A reactor recirculation pump runback.

The runback occured while securing the 2A condensate pump from service and a low level signal was recieved.

Level returned to normal and power was stabilized at 35% RTP.

Power was restored to 42% RTP at 0902 hours0.0104 days <br />0.251 hours <br />0.00149 weeks <br />3.43211e-4 months <br /> on January 19, 1995.

On January 26, 1995, at 1631 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.205955e-4 months <br /> power was reduced to 38%

RTP in order to place the 2B Reactor Recirculation MG set in service.

The 2B MG set was returned to service on January 26, 1995.

At 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> power was returned to 55.8% RTP.

On January 27, 1995, at 0112 hours0.0013 days <br />0.0311 hours <br />1.851852e-4 weeks <br />4.2616e-5 months <br />, power reduction was started in preparation for refueling.

At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> the Unit was manually shutdown from 21% RTP and the plant entered Operational Condition 3, Hot Shutdown.

On January 27, 1995, at 1857 hours0.0215 days <br />0.516 hours <br />0.00307 weeks <br />7.065885e-4 months <br /> Operational Condition 4, Cold Shutdown, was entered when the reactor coolant temperature reached 200 degrees F.

On January 28, 1995, at 1315 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />5.003575e-4 months <br />, Operational Condition 5 was entered due to detensioning of the reactor pressure vessel head.

Unit 2 ended this operating period in refueling operations

~..

with the plant in Operational Condition 5, Refueling.

II.

Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of January, j

t i

a t

i i

I I

?

i f

i p

m.r

+

4 AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO. 50 - 353 UNIT LIMERICK UNIT 2 DATE FEBRUARY 13 1995 COMPANY PECO ENERGY COMPANY STEVEN J.

KEL Y REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION I

h TELEPHONE (610) 718-3763 r

MONTH JANUARY 1995 t

i DAY AVERAGE DAlLV POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-NET)

(WWE-NET) 1 622 17 395 2

614 18 369 I

3 614' 19 345

[

4 614 20 369 5

610 21 369 6

601 22 377 7

598 23 369 8

598 24 369 9

593 25 370 f

10 593 26 403 11 584 27 93 12 580 28 0

13 576 29 0

14 567 30 0

l-15 260 31 0

16 297 s

t-l

OPEQQTING DOTO QEPOST

~~'

DOCKE'? MO. 50 - 353 DATE FEBRUARY 13 1995 COMPLETED BY PECO ENERGY COMPANY STEVEN J.

KELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION i

TELEPHONE (610) 718-3763

===-

OPERATING STATUS ERE TWb BAD ORbPS 1 UNIT NAME: LIMERICK UNIT 2 N TES THERE 2.

REPORTING PERIOD:

JANUARY. 1995 GREATER THAN 20% THIS MONTH

3. LICENSED THERMAL POWER (MWT):

3293 DUE TO REFUELING OUTAGE 4 NAMEPLATE RATING (GROSS WWE):

1138 ACTIVITIES AND SHUTDOWN.

5. DESIGN ELECTRICAL RATING (NET E):

1055

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1055

___________=--

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

i

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 744 44.400
12. NUMBER OF HOURS REACTOR WAS CRITICAL 634.0 634.0 39.997.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 634.0 634.0 39.238.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1.025.993 1.025.993 123.255.576
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 324.600 324.600 ab.708.18b
18. NET ELECTRICAL ENERGY GENERATED (MWH) 305.601 305.601 39.207.801 PAGE 1 OF 2 i

9 OPEQQTING DOTO REPOQT (CONTINUED)

DOCCIET NO. 50 - 353 e

_...=- - _

DATE FE8RUARY 13 1995 i

THIS MONTH VR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 85.2 85.2 88.4

-- -=:-_.__

20. UNIT AVAILA81LITY FACTOR 85.2 85.2 88.4

= _ -

_ =.

21. UNIT CAPACITY FACTOR (USING MDC NET) 38.9 38.9 83.T

=_

- _ =

22. UNIT CAPACITY FACTOR (USING DER NET) 38.9 38.9 83.7
23. UNIT FORCED OUTAGE RATE O.0 0.0 3.4 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

REFUELING OUTAGE STARTED ON 1/27/95 AT 10:00

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/b1/90 01/08/90 PAGE 2 OF 2 l

l l

I i

(

I 1

.=

UNIT SHUTDOWMS OND POWEQ REDUCTIONS DOCCIET NO. 50 - 353

_=----

UNIT NAME LIMERICK UNIT 2 DATE FEBRUARY 13 1995 REPORT MONTH JANUARY. 1995 COMPLETED BY PECO ENERGY COMPANY

=-- -

STEVEN J.

MELLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3763 R__.__rrr"---

- =... _ _ _ _ _ _ _ _ _ _ _ _ _ _... - - -=

METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON NO.

DATE (1)

(HOURS)

(2) '

SHUTTING DOWN EVENT CODE CODE ACTION TO REACTOR (3)

REPORT *

(4)

(5)

PREVENT RECURRENCE r

f 31 950115 S

000.0 B

4 N/A CA VESSEL REACTOR POWER WAS REDUCED TO 30% FOR REFUELING OUTAGE PREPARATIONS.

i 32 950118 F

000.0 H

4 N/A CB PUMPXX REACTOR POWER WAS REDUCED TO 35% DUE TO RECIRC PUMP RUNBACK.

i 33 950126 S

000.0 H

4 N/A CB GENERA REACTOR POWER WAS REDUCED TO 38% FOA PLACING THE M/G SET IN SERVICE.

30 950127 5

110.0 C

1 N/A RC FUELXX REACTOR WAS SHUTDOWN FOR REFUELING OUTAGE.

110.0 (1)

(2)

(3)

(4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE me,

,y,.

-..,,, -..mw,

..,, = - - - -.......

--.s


.w.,

v, n < - -.... -

..w,

.,.,.m

-..a.

,,m.

m

.--w~

e-er

- - -r

-