Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 52788 +
- 05000410/LER-2001-004 +
- 05000335/LER-2004-004, Re Dual Unit Loss of Offsite Power During Hurricane Jeanne +
- 05000249/LER-2001-003 +
- IR 05000324/2018001 +
- ML20012C529 +
- ML20011E697 +
- ML19269C675 +
- ML19263D722 +
- ML19305D309 +
- ML20078K260 +
- ML20116K233 +
- ML20129F549 +
- ML20195B275 +
- ML20237E620 +
- ML20236V897 +
- ML11334A050 +
- ML20129F418 +
- ST-HL-AE-3929, Supplement to Special Rept:On 910710,spraying Lube Oil Leak Discovered at Cylinder 7R & Engine Manually Secured.Caused by Break in Exhaust rocker-to-inlet Rocker Crossover Lube Oil Line.Design of Lube Oil Line Changed +
- ST-HL-AE-3834, Special Rept:On 910710,spraying Lube Oil Leak Identified at Cylinder 7R & Standby Diesel Generator Declared Inoperable. Caused by Break in Exhaust Rocker to Inlet Rocker Crossover Lube Oil Line.Wall Thickness Tubing Replaced +
- 05000382/LER-1986-008, :on 860504 & 10,emergency Feedwater Actuation Signals Occurred.Caused by Failure of Reactor Operator to Remove Bypass on Hi Steam Generator 2 Delta P Bistable for Channel A.Surveillance Procedure Revised +
- ML20205C308 +
- 05000352/LER-1988-015, :on 880418,emergency Diesel Generator auto-started Due to Unplanned Test Start Signal.Caused by Personnel Error.Training Memo Issued to All Field Engineers Requiring Completion of Stated Form +
- 05000353/LER-1996-004-02, :on 960514,reactor Scram Resulted from Main Generator Lockout Due to Actuation of Voltz/Hertz Relay. Caused by Inadequate Design Change Package.Relay 359/381A Drawing Corrected & Relays Inspected +
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed +
- 05000331/LER-1992-005, :on 920408,primary Containment Isolation Sys Group III Isolation Occurred,Resulting in Initiation of Standby Gas Treatment Sys A.Cause Unknown.Isolation Reset +
- 05000261/LER-1977-003, :on 770131,during Normal Operation,Boric Acid Transfer Pump B Tripped Due to High Pump Motor Temp Cutout. Caused by Improper Setting of Motor Temp Cutout.Motor Temp Cutout Reset.New Stator Installed +
- 05000325/LER-1994-012-01, :on 940922,declared HPCI Inoperable Due to Failure of Lube Oil Cooling Water Supply Valve Control Power Fuse.Caused by Inadequate self-checking & Job Scope Walkdown.Disciplined Involved Workers +
- 05000498/LER-1994-018, :on 941102,required 0.125 Inches Water Gauge Could Not Be Demonstrated on Trains of CR Envelope HVAC Due to Less than Adequate Surveillance Test Procedure.Electrical Auxiliary Bldg HVAC Airflows Adjusted +
- 05000498/LER-1994-018-01, :on 941102,failure to Fully Meet Requirements of TS Re CR Envelope HVAC Sys Boundary.Caused by Less than Adequate Surveillance Test Procedure.Development of Detailed Testing Method Initiated +
- ML20033G362 +
- PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058) +
- 05000445/LER-2012-002, For Comanche Peak, Regarding Failure of Safety Related Breaker Control Devices Due to a Common Cause +
- ML062710041 +
- ML14184B070 +
- 05000461/LER-1987-047, :on 870814,inservice Insp Surveillance Not Performed as Required by Tech Spec 4.0.5.Caused by Personnel Error.Rhr Pump Room Cooling Coil Shutdown Svc Water Outlet Valves Tested & Procedure Revised Temporarily +
- ML20129J050 +
- 05000325/LER-1994-012, :on 940922,HPCI Declared Inoperable Due to Failure of Lube Oil CW Supply Valve Control Power Fuse. Workers Disciplined Re Importance of Maintaining Questioning Attitude & When Uncertain Not to Proceed +