Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000482/LER-2010-002, Regarding Turbine Trip Function of Reactor Trip P-4 Interlock Defeated During Entry Into and in Mode 3 +
- ML16225A577 +
- IR 05000336/2002012 +
- ML041130434 +
- CNS-16-015, Technical Specification Bases Changes +
- ML14203A290 +
- PLA-2756, Forwards Postulated Pipe Rupture Calculations M-MSS-010 & M-MSS-006,per NRC 861112 Telcon Request +
- ML18037A299 +
- ML17054B169 +
- ML16021A501 +
- ML15356A365 +
- CNS-15-098, Technical Specification Bases Changes +
- ML14290A304 +
- ML093140803 +
- ML100550501 +
- ML12356A448 +
- ML12340A518 +
- CP-201201129, License Amendment Request (LAR) 12-005, Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation and 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation +
- ML12251A359 +
- ML11171A059 +
- ML120030235 +
- L-2012-177, Supplemental Response to NRC Mechanical and Civil Engineering Branch (Emcb) Regarding Extended Power Uprate License Amendment Request +
- ML12080A216 +
- L-2012-059, Response to NRC Mechanical and Civil Engineering Branch (Emcb) Request for Additional Information Regarding Extended Power Uprate License Amendment Request +
- ML11363A038 +
- ML110550846 +
- ML11311A162 +
- L-2011-361, Response to NRC Mechanical and Civil Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request +
- ML102571779 +
- NL-11-0280, License Amendment Request for Steam Generator Water Level High-High Setpoint Change +
- ML17037C491 +
- ML17037B376 +
- ML18025A576 +
- NL-17-0534, Joseph M. Farley Nuclear Plant, Technical Specifications Bases +
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Bases for Improved Technical Specifications +
- NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 +
- ML13100A264 +
- RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Table of Contents Through Table 2.5-35 +
- ML102580279 +
- ML102371205 +
- ML101940374 +
- ML101940373 +
- ML100410116 +
- NRC 2009-0123, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint +
- PLA-6561, Amendment Request No. 296 to Unit 1 and Amendment Request No. 266 to Unit 2 Re Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1-1 and Editorial Change to TS 3.10.8.F, Response to RAI +
- ML092120022 +
- ML091280276 +
- RS-08-161, Braidwood, Units 1 and 2 - Technical Specification Bases +
- GNRO-2008/00063, UFSAR Update for Grand Gulf, Unit 1, Nuclear Station for September 2008 +
- ML082620083 +