MONTHYEARGNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00040, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 20182018-08-20020 August 2018 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 2018 2023-06-06
[Table view] |
Text
Entergy Operations, Inc.
7003 Bald Hill Road P.O. Box 756 Port Gibson, MS 39150 Tel 601 437 6694 Michael A. Krupa Director Nuclear Safety Assurance GNRO-2008/00063 September 17, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
UFSAR Update for Grand Gulf Nuclear Station for September 2008 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29
Dear Sir or Madam:
Pursuant to 10CFR50.71(e) and in accordance with 10CFR50.4, Entergy Operations, Inc. hereby submits only one CD-ROM copy of the current Updated Final Safety Analysis Report (UFSAR). The UFSAR CD-ROM (electronic copy) is a complete copy of our 10CFR50 Appendix B (Section VI Document Control)
Controlled Copy of the UFSAR and includes recent revisions. A file is included on the CD-ROM called "prindex.pdf" which is a page revision index. The page revision index identifies the current pages of the FSAR following page replacement. The page revision index has the changed pages highlighted in BLUE and BOLDED and is included as-an aid for NRC reviewers.
GGNS now submits UFSAR updates on a more frequent basis than that required by 10CFR50.71(e). This change has been made to improve the timeliness of information- provided to the NRC and to take advantage of recent changes made by the NRC in the area of electronic transmittat-of information. Attachment 1 provides a detailed explanation of the CD-ROM technical details.
This UFSAR update includes the designation of certain information as historical and the removal of certain redundant information pursuant to the guidance of NEI-98-03 Rev. 1 as endorsed by the NRC in Regulatory Guide 1.181. These changes are described in Attachment 2.
A4o53 kuc-tN.
GNRO-2008/00063 Page 2 I hereby certify, to the best of my knowledge, information, and belief, that the information provided in the attached UFSAR meets the requirements of IOCFR50.71 (e) to update the UFSAR to reflect all changes to a maximum of six months prior to the date of this submittal.
This letter does not contain any commitments.
Should you have any questions, please contact Dennis Coulter by email at dcoulte@,enter-qy.com or by phone at 601-437-6595.
Sincerely, Michael A. Krupa Director, NSA GGNS MAK:DMC:dmc Attachments
- 1. GGNS UFSAR CD-ROM Technical Details
- 2. FSAR-only Changes enclosure: One CD-ROM copy of the Complete 10CFR50 Appendix B Controlled Copy Updated Final Safety Analysis Report
GNRO-2008/00063 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U. S. Nuclear Regulatory Commission ATTN: Mr. Elmo E Collins (w/2)
Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 U. S. Nuclear Regulatory Commission ATTN: Mr. Jack N. Donohew, NRRPDORL (w/2)
ATTN: ADDRESSEE ONLY ATTN: U. S. Postal Delivery Address Only Mail Stop OWFN/8 G14 Washington, DC 20555-0001
Attachment 1 to GNRO-2008/00063 Page 1 of 2 GGNS UFSAR'CD-ROM TECHNICAL DETAILS UFSAR CD-ROM TECHNICAL DETAILS The UFSAR CD-ROM can be accessed directly from the CD-ROM or can be loaded on local area network for multi-user access. The following information is provided explaining the content of the CD-ROM:
" The file format chosen is PDF.
" The software used to view the UFSAR is located in the root directory of the CD-ROM and is ADOBE ACROBAT READER 5.0.5 or 4.05. The names of the files are "rp505enu.exe" or "rs405eng.exe" and is a self-executing file. When executed it will load a copy of ADOBE ACROBAT READER 5.0.5 or 4.0.5 on your hard drive. This Will allow you to keyword search the entire UFSAR and view/print all PDF files on the CD-ROM. More information concerning free use of the supplied software is located at:
http://www.adobe.com/products/acrobat/readermain. html.
- Once the reader is loaded, use the reader software to open the "START. PDF" file located on the CD-ROM. After the file is loaded, a picture of the Grand Gulf Nuclear Station site will be seen. Selecting the red box identified as Table of Contents on the opening screen will load the UFSAR Table of Contents. Each chapter can be accessed by selecting the highlighted box around the chapter name. If you wish to text Til search the entire UFSAR, select this icon:
" The CD-ROM UFSAR file structure is set-up to replicate the HARDCOPY books of the UFSAR, which includes tabbing and numbering of chapter and subchapters. Each subchapter is complete and includes all text, figures, and tables. This includes 8.5xl 1" and 11 x1 7" sheets normally found in the HARDCOPY books.
" The UFSAR on the CD-ROM is setup such that it can be easily placed on a local area network by copying the entire "UFSARIMA" directory onto the network drive. Once on the network, ADOBE ACROBAT READER should be used to self load the file named "bltoc.pdf' file or "start.pdf" file.
Attachment 1 to GNRO-2008/00063 Page 2 of 2 0 The UFSAR CD-ROM file structure is as follows:
IA : )N:LRS.D0C5ICSFSARIMA -G jI;0 TA.--
ltl{
Et)-'
~1JPrDATAMLARSO0N PL6NTS QAPMOLD-SUPERSCEDED 4.30"99 L]{j OLr UFSARIMA 0 C0 CLJ FSARINDX o0chl,02 6k Fie Folder FieFolder Fie Fod,,
Folder 7/27/2004 3A 3/2003 3:56AM 929 PM 3:59PM 7/27/2004 4:01 PM
! *] SECURITYSTUFF ýCj 00,J(k4h.004 File 7/27V2004
(ý-CO TECHNICALSPECIFCATIONAMENDMEN9SER f El ThisoldoisOnfir. 0056-apt05 FieFolder 7/27/20044:02PM
-TRMTAM Fie Foer 7/28/2054 6:54AM Ch-0 TAMESOMS a$eerition C3-009hWO9 PSatemtoview Fie rklder 7/29/20046:5 AM h TESOMS MuDocment ,01chAl1 File Folde* 7/M2004 6:57AM
- IS M Ne* Pk 012chAN12 Fie Folde, 7/28/2004 6:59AM (b- TIMGEMyCoort 13hatl3 ie Folder 7128/2004 7035AM C
CJ0140aptt4oTSMISC Fie Folder 7/28/2004 7:00AM I C.
9015chal15 FileFoke, 7/28/2004 7:03AM I--'-010015ho01
' C] 0 FPieFolder 7/28/2004 7:04AM 0 -0] 002chapt 0 2 CJOT1ohapl16 FPieFolder 7/28/2004 7:06AM h-'-l 003chWO3 PC iehpt, Fil Folder 7/28/2004 7:10AM 0-l 004¢hapt04 003chW03 Fie Folder 7/28/2004 7:16AM (i C] 005chp0 I C] 017chA1 7 Fie Folder 7/29/2004 8:27AM Ii I = -,P4o*.O 6,5301K Appication 6/25o200127oPM Iti-c] wlt&hooi5s ISTAR0.pdl 22KB AdbeA-IbOalo. 13411=25310.56A14 l/]0 060010 [kapO t poeo.pdil 554KB Adobe Acrobat Doc... 12/4/2W6312:1 0 PM 0 ]-C010chapl0 I 2 ] FSARI1OXIo.K 82eKB Te*oooro, 7/29/2M6410.53 AM S011 apFSAINOXpd I KB AcrobatCataloglndex 7/29/241M053AM 0411. 012chad12 blot.pcU 339 K8 AdobeAcrobaltoe... /3-/20044:02 PM 5
I if2IOl"bo~s l I E .. 017cha pt17 t I -Cj loho~l I I)II-C3 FSARINDX I -(ý UFSARTES 1i1- UFSARTSOOCMMISC 40C W&Sl~osboeStaeleroento I S-C:I rp-md
ýC-J MECH Cý-MGMT 26,bad5, 'i*ik."se:. p 6176B) 7.MB .e 1721 L
'Each chapter can be directly accessed by using the reader software. This is advantageous if comparisons of different chapters are necessary.
Attachment 2 to GNRO-2008/00063 Page 1 FSAR-ONLY CHANGES (NEI-98-03)
NEI-98-03 FSAR CHANGES FSAR 98-03 Type of Change I Justification for Change Page/Table/ Description of Change Figure (Licensing Document Change Number)
N/A None in September 2008 Update N/A