Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1998-013, Forwards LER 98-013-00,re Event Which Occurred at Millstone Unit 2 on 980526.Commitments Made within Ltr,Encl + (ML20249C490)
- 05000336/LER-1998-013-01, :on 980526,shutdown Cooling Sys Was Over Pressurized by Inadvertent Hpsip Start.Caused by Inadequate Evaluation in Original Plant Design.Appropriate Actions Were Taken to Ensure Sys Complies W/Design & Licensing Basis + (ML20249C492)
- U-603031, Updates Commitments Made in Response to NOV to Insp Rept 50-461/97-19.Station Remains Committed to Revising PM Tasks Prior to Next Scheduled Performance,Assuring That Function & Reliability of Affected Motors Will Not Be Compromised + (ML20249C493)
- B17339, Submits Updated Schedule for License Amend Requests for Millstone Unit 3.Schedule Will Be Updated Quarterly + (ML20249C494)
- ML20249C495 + (ML20249C495)
- 05000457/LER-1997-005-01, :on 971106,violation of TS Due to SI Rvs Lifting & Failing to Reseat.Caused by Sys Design Deficiency. Revised Procedures & Evaluated Setpoint Tolerance + (ML20249C496)
- ML20249C500 + (ML20249C500)
- IR 05000341/1998011 + (ML20249C502)
- ML20249C504 + (ML20249C504)
- ML20249C505 + (ML20249C505)
- 3F0698-16, Provides NRC W/Milestone Schedule for Number of Significant Design & Engineering Activities Occurring at Util CR-3 Nuclear Station.Schedule Provides Target Completion Dates for Various Design & Engineering Activities + (ML20249C507)
- L-98-137, Forwards Rev 52 to St Lucie Plant Physical Security Plan,Per 10CFR50.54(p).Encl Withheld Per 10CFR2.790(a)(3) + (ML20249C508)
- ML20249C509 + (ML20249C509)
- ML20249C510 + (ML20249C510)
- ML20249C512 + (ML20249C512)
- ML20249C513 + (ML20249C513)
- TXX-9816, Requests That Southern Technical Services Co Be Removed from NRC Distribution Lists Effective 980626.Util No Longer Obtains Svcs of Company + (ML20249C514)
- ML20249C516 + (ML20249C516)
- ML20249C518 + (ML20249C518)
- ML20249C519 + (ML20249C519)
- ML20249C520 + (ML20249C520)
- ML20249C521 + (ML20249C521)
- ML20249C522 + (ML20249C522)
- ML20249C523 + (ML20249C523)
- ML20249C524 + (ML20249C524)
- ML20249C525 + (ML20249C525)
- ML20249C528 + (ML20249C528)
- ML20249C529 + (ML20249C529)
- 05000423/LER-1998-031, :on 980519,incomplete Testing of P-4 Interlock Function Was Noted.Caused by Human Error & Inadequate Procedure Development.Revised Procedure, Ssps Refueling Tests + (ML20249C532)
- IR 05000461/1998007 + (ML20249C535)
- DD-98-04, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision (DD-98-04) Expired.Commission Declined Any Review.Decision Became Final on 980626.W/Certificate of Svc.Served on 980629 + (ML20249C537)
- B17240, Provides Update on Status of Docketed PASS Commitment Re Total Dissolved Gas Analysis Accuracy Requirements in Range of 30 to 150 Cc/Kg.Revised Regulatory Commitment Contained in Attachment 1 + (ML20249C538)
- 0CAN069803, Submits Voluntary Response to AL 98-03,providing Estimated Number of Licensing Actions That Will Be Submitted During Remainder of FY98 & in FY99 + (ML20249C539)
- IR 05000352/1998002 + (ML20249C543)
- ML20249C544 + (ML20249C544)
- ML20249C546 + (ML20249C546)
- ML20249C548 + (ML20249C548)
- ML20249C551 + (ML20249C551)
- 05000352/LER-1998-010, :on 980526,identified Two Surveillance Tests Associated W/Rc Recirculation Sys Flow Units A/C & B/D Calibr,Respectively.Caused Attributed to Personnel Error. Units Satisfactorily Tested + (ML20249C552)
- ML20249C554 + (ML20249C554)
- ML20249C555 + (ML20249C555)
- ML20249C556 + (ML20249C556)
- ML20249C557 + (ML20249C557)
- LIC-98-0088, Submits Completion of Actions in Response to GL 96-01, Testing of Safety Related Logic Circuits. Appropriate Procedure Changes Initiated & Approved to Include Items Warranting Addl Testing,Based on Final Review + (ML20249C558)
- ML20249C559 + (ML20249C559)
- LIC-98-0090, Forwards Revs 16 & 17 of Fort Calhoun Station Colr.Rev 16 Revised Refueling Boron Concentration for End of Cycle 17 Through Beginning of Core Reload for Cycle 18.Rev 17 Provided Updated Info to Support Cycle 18 Operation + (ML20249C560)
- ML20249C562 + (ML20249C562)
- ML20249C564 + (ML20249C564)
- ML20249C565 + (ML20249C565)
- ML20249C566 + (ML20249C566)
- IR 05000440/1998012 + (ML20249C567)