ML20249C510
| ML20249C510 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/19/1998 |
| From: | Patrick W CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES |
| To: | Linehan J NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20249C511 | List: |
| References | |
| CON-FIN-D-1035, CON-FIN-J-5164, CON-FIN-J-5186, CON-FIN-J-5190, CON-FIN-J-5206, CON-FIN-J-5210, CON-FIN-J-5226, CON-NRC-02-97-009, CON-NRC-2-97-9, REF-WM-11 HLWR, NUDOCS 9806300204 | |
| Download: ML20249C510 (1) | |
Text
--_
ht
- 4 1
Center for Nuclear Waste Regulatory Analyses l
6220,CUL.EBRA ROAD e P.O. DRAWER 28510
- SAN ANTONIO, TEXAS, U.S.A. 782284510 June 19,1998 (210) 522 5160
- FAX (210) 522 5155 Contract No. NRC-02-97-009 i
Account No. 20-1402-158 U.S. Nuclear Regulatory Commission Attn: Mr. John J. Linehan, Director Office of Nuclear Material Safety and Safeguards Progra:n Management, Policy Development and Analysis Staff Mail Stop 8-A23 Washington, DC 20555
Subject:
CNWRA Program Manager's Periodic Report on Activities of the Center for Nuclear Waste Regulatory Analyses for Period 9-FY98
Dear Mr. Linehan:
The attached " Program Manager's Periodic Report" (PMPR) documents the progress and financial status of the Center for Nuclear Waste Regulatory Analyses (CNWRA) for the period May 9 through June 5,1998. Its contents comply with the requirements of section F.1.5. of the referenced contract. A diskette containing the PMPR in Wordperfect 8 format is also enclosed.
Cost variance analyses are provided for the Division of Waste Management (D1035), Tank Waste Remediation System (J5164), Three Mile Island Unit 2 Independent Spent Fuel Storage Installation (J5186), Dry Transfer System (J5206), Centralized Interim Storage Facility (D1035), Private Fuel Storage Facility (J5226), West Valley Demonstration Project (J5190), and Savannah River Site Aluminum-Based Spent Fuel (J5210) Job Codes (JCs), as well as for composite spending on this contract. All variances are expressed with regard to the current operations l
plans.
During period 9,16 schedule changes were made as reflected in table 2. Eight deliverables were transmitted as indicated in table 3.
Please contact me or Mr. Henry Garcia if you have questions regarding this report.
Sincerely yours, 7
3 g
[
Wesley C. Patrick President HFG/lg I
Enclosures I
cc:
B. Meehan J. Greeves C. Haughney
,5 C. Paperiello M. Federline S. Bahadur b
,L 3
D. DeMarco E. Ten Eyck CNWRA Directors / Element Managers 6
B. Stiltenpole (38)
E. Brach S. Boyanowski (SwRI Contracts)
A h v' W. Kane H. Thompson
}
9806300204 980619 PDR WASTE WPf-11 PDR Washington Office
- Twinbrook Metro Plaza, #210 *12300 Twinbrook Parkway
- Rockville. Maryland 20852-1606 n~n ue Aff muuu10
---