ML20249C521
From kanterella
Jump to navigation
Jump to search
ML20249C521 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 01/13/1998 |
From: | Dubovecky B STEVENSON & ASSOCIATES |
To: | |
Shared Package | |
ML20249C517 | List: |
References | |
96C2913-C20, 96C2913-C20-R, 96C2913-C20-R00, NUDOCS 9806300233 | |
Download: ML20249C521 (244) | |
Similar Documents at Monticello | |
---|---|
Category:ARCHIVE RECORDS
MONTHYEARML20154J2731998-10-0202 October 1998
[Table view]Audit Rept on Implementation of GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants, on 980915-17 ML20206S1181998-05-11011 May 1998 Rev 2 to NSP-21Q-302, Charpy V-Notch (Cvn) Test Data Files for Monticello RPV Plates,Curve Fits of Cvn Data & Calculation of Plant Specific Chemistry Factors ML20216H4021998-04-0707 April 1998 Rev 5 to 98-106, Evaluation for LOCA Aging at 1880 Mwt ML20206S1331998-04-0606 April 1998 Rev 1 to NSP-21Q-304, Pressure Test,Non-Critical Core Operation & Critical Core Operation P-T Curve Development ML20249C5241998-04-0303 April 1998 Rev 2 to Calculation 96C2913-C016, HP & LP Turbine Condenser Anchorage Capacity Evaluations ML20249C5211998-01-13013 January 1998 Rev 0 to Calculation 96C2913-C20, Monticello Unit 1 Limited Analysis for Baseplate Qualification,Computer Analysis & Hand Calculations ML20199G9951997-12-19019 December 1997 Rev 0 to Calculation 97C2999-C-001, T-44 Seismic Displacement Evaluation ML20141B9341997-06-18018 June 1997 Rev 0 to Calculation V75100.NSP97.00501, Determination of Containment Overpressure Required for Adequate NPSH of Low Pressure ECCS Pumps ML20249C5221997-06-10010 June 1997 Rev 0 to Calculation 96C2913-C015, Gang Hangar Support ML20148S6531997-04-0808 April 1997 RHR Room Temp Response to GE Ltrs GLN-97-017 & GLN-97-019, Rev 0 ML20136B5431997-01-0202 January 1997 Low Pressure ECCS Net Positive Suction Head ML20134D2231996-10-17017 October 1996 Press Release III-96-63, Aerial Radiation Measurements Planned for NPPs in Wisconsin & Minnesota ML20199H0471995-11-0808 November 1995 Rev 0 to Calculation C-017, LAR RB-AB-L1 ML20199H0201995-11-0808 November 1995 Rev 0 to Calculation C-017, LAR RB-AB-L1 ML20199H0531995-10-10010 October 1995 Rev 0 to Calculation C-016, Seismic Analysis of Standby DG Day Tank T-45A & B ML20248C2921995-06-0909 June 1995 Rev 0 to Calculation 52091-C-015, Evaluation of Anchorage for Motor Control Centers 43A,43B ML20084C3501995-05-19019 May 1995 Estimation of Cable Spreading Room Equipment Floor Loading ML20248C2951995-03-30030 March 1995 Rev 0 to Calculation 52091-C-025, Anchorage Evaluation of RHR Pumps (P-202 A,B,C & D) & Core Spray Pumps (P-208A & B) ML20248C1671995-03-30030 March 1995 Rev 0 to Calculation 59091-C-006, Monticello Unit 1,Block Wall Walkdown ML20248C2731995-03-30030 March 1995 Rev 0 to Calculation 52091-C-014, Evaluation of Motor Control Center 42A ML20248C2651995-03-21021 March 1995 Rev 0 to Calculation 52091-C-057, Monticello HVAC Duct Screening ML20248C2191995-03-19019 March 1995 Rev 0 to Calculation 52091-C-054, Horizontal Pump Screening ML20248C1291995-03-16016 March 1995 Rev 0 to Calculation 52091-C-009, Monticello Unit 1,Block Wall Rounding Evaluation ML20248C2301995-03-10010 March 1995 Rev 0 to Calculation 52091-C-055, RBCCW Pump Screening ML20248E3361995-03-0303 March 1995 Rev 0 to Calculation 52091-C-028, Anchorage Evaluation of Battery Chargers D52,D53 & D54 ML20248C2131995-03-0303 March 1995 Rev 0 to Calculation 52091-C-019, Monticello Unit 1, Screening Evaluation of Vertical Pumps in Intake Structure ML20248C1971995-01-24024 January 1995 Rev 0 to Calculation 52091-C-022, Monticello Unit 1, Screening Evaluation of Vertical Tanks ML20248C2441995-01-17017 January 1995 Rev 0 to Calculation 52091-C-010, Monticello Unit 1, Electrical Equipment Anchorage Screening Based on Design Basis Evaluation ML20217D8531994-12-21021 December 1994 Rev 0 to 091-19407-C-3, Gothic Verification ML20058N9841993-07-29029 July 1993 Package Consisting of Employee Concerns Programs for Plant ML20073S8521993-04-30030 April 1993 Rev 2 to Calculation 1961-2.2-001, Verification of Toxpuff & Toxevap Lotus 1-2-3 Spreadsheet ML20073S8491993-04-11011 April 1993 Rev 1 to Calculation 1961-2.2-004, MNGP Toxic Chemical Analysis Probability Analysis of Trucking Accidents ML20136B5491993-01-29029 January 1993 Rev 1 to ECCS Analysis for Mnp W/Nukon Insulation Sys ML20140G8021992-07-0101 July 1992 Rev 0 to Control Room & Offsite Dispersion Factors ML20079N3621991-11-11011 November 1991 Responds to NUMARC Survey in Support of NRC License Renewal Rulemaking Covering Util Environ Monitoring & Ecological Studies program,1989 Annual Rept,Water Monitoring Summary, 1987 Annual Rept & Creel Survey 1982 Annual Rept ML20064E4861982-10-14014 October 1982 Slide Presentation for Northern States Power Co - NRC 821014 Meeting ML19305B7641980-02-21021 February 1980 Slide Presentation Entitled, Monticello Feedwater Nozzle Bypass Leakage Temp Monitoring. ML20090M5361974-03-21021 March 1974 Package Consisting of Util Responses to AEC Questions on Facility High Energy Line Breaks Outside of Containment ML20127N9251970-01-16016 January 1970 Press Release Discussing Util Intention to Seek License to Operate Plant.Acrs Rept Encl ML20128A8311969-12-0404 December 1969 Record of Telcon W/Applicant Re Drawings Showing Addl Independence Between Redundant SGTS Schematic Drawings 1998-05-11 Category:OPERATIONS SUPPORT-CALCULATIONS MONTHYEARML20206S1181998-05-11011 May 1998
[Table view]Rev 2 to NSP-21Q-302, Charpy V-Notch (Cvn) Test Data Files for Monticello RPV Plates,Curve Fits of Cvn Data & Calculation of Plant Specific Chemistry Factors ML20216H4021998-04-0707 April 1998 Rev 5 to 98-106, Evaluation for LOCA Aging at 1880 Mwt ML20206S1331998-04-0606 April 1998 Rev 1 to NSP-21Q-304, Pressure Test,Non-Critical Core Operation & Critical Core Operation P-T Curve Development ML20249C5241998-04-0303 April 1998 Rev 2 to Calculation 96C2913-C016, HP & LP Turbine Condenser Anchorage Capacity Evaluations ML20249C5211998-01-13013 January 1998 Rev 0 to Calculation 96C2913-C20, Monticello Unit 1 Limited Analysis for Baseplate Qualification,Computer Analysis & Hand Calculations ML20199G9951997-12-19019 December 1997 Rev 0 to Calculation 97C2999-C-001, T-44 Seismic Displacement Evaluation ML20141B9341997-06-18018 June 1997 Rev 0 to Calculation V75100.NSP97.00501, Determination of Containment Overpressure Required for Adequate NPSH of Low Pressure ECCS Pumps ML20249C5221997-06-10010 June 1997 Rev 0 to Calculation 96C2913-C015, Gang Hangar Support ML20148S6531997-04-0808 April 1997 RHR Room Temp Response to GE Ltrs GLN-97-017 & GLN-97-019, Rev 0 ML20136B5431997-01-0202 January 1997 Low Pressure ECCS Net Positive Suction Head ML20199H0471995-11-0808 November 1995 Rev 0 to Calculation C-017, LAR RB-AB-L1 ML20199H0201995-11-0808 November 1995 Rev 0 to Calculation C-017, LAR RB-AB-L1 ML20199H0531995-10-10010 October 1995 Rev 0 to Calculation C-016, Seismic Analysis of Standby DG Day Tank T-45A & B ML20248C2921995-06-0909 June 1995 Rev 0 to Calculation 52091-C-015, Evaluation of Anchorage for Motor Control Centers 43A,43B ML20084C3501995-05-19019 May 1995 Estimation of Cable Spreading Room Equipment Floor Loading ML20248C1671995-03-30030 March 1995 Rev 0 to Calculation 59091-C-006, Monticello Unit 1,Block Wall Walkdown ML20248C2731995-03-30030 March 1995 Rev 0 to Calculation 52091-C-014, Evaluation of Motor Control Center 42A ML20248C2951995-03-30030 March 1995 Rev 0 to Calculation 52091-C-025, Anchorage Evaluation of RHR Pumps (P-202 A,B,C & D) & Core Spray Pumps (P-208A & B) ML20248C2651995-03-21021 March 1995 Rev 0 to Calculation 52091-C-057, Monticello HVAC Duct Screening ML20248C2191995-03-19019 March 1995 Rev 0 to Calculation 52091-C-054, Horizontal Pump Screening ML20248C1291995-03-16016 March 1995 Rev 0 to Calculation 52091-C-009, Monticello Unit 1,Block Wall Rounding Evaluation ML20248C2301995-03-10010 March 1995 Rev 0 to Calculation 52091-C-055, RBCCW Pump Screening ML20248E3361995-03-0303 March 1995 Rev 0 to Calculation 52091-C-028, Anchorage Evaluation of Battery Chargers D52,D53 & D54 ML20248C2131995-03-0303 March 1995 Rev 0 to Calculation 52091-C-019, Monticello Unit 1, Screening Evaluation of Vertical Pumps in Intake Structure ML20248C1971995-01-24024 January 1995 Rev 0 to Calculation 52091-C-022, Monticello Unit 1, Screening Evaluation of Vertical Tanks ML20248C2441995-01-17017 January 1995 Rev 0 to Calculation 52091-C-010, Monticello Unit 1, Electrical Equipment Anchorage Screening Based on Design Basis Evaluation ML20217D8531994-12-21021 December 1994 Rev 0 to 091-19407-C-3, Gothic Verification ML20073S8521993-04-30030 April 1993 Rev 2 to Calculation 1961-2.2-001, Verification of Toxpuff & Toxevap Lotus 1-2-3 Spreadsheet ML20073S8491993-04-11011 April 1993 Rev 1 to Calculation 1961-2.2-004, MNGP Toxic Chemical Analysis Probability Analysis of Trucking Accidents ML20136B5491993-01-29029 January 1993 Rev 1 to ECCS Analysis for Mnp W/Nukon Insulation Sys ML20140G8021992-07-0101 July 1992 Rev 0 to Control Room & Offsite Dispersion Factors 1998-05-11 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20249C521&oldid=3883478"