Supplements Original Response to NOV 70-7002/97-08 to Include Listed Addl Corrective Actions to Further Reduce Potential for Future Overtime Exceedences.List of Commitments,Encl
ML20249C523
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 06/25/1998
From: Jonathan Brown
UNITED STATES ENRICHMENT CORP. (USEC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
70-7002-97-08, 70-7002-97-8, GDP-98-2029, NUDOCS 9806300247
Download: ML20249C523 (3)


Text

i l

~

1 l

CSEC A Global Enorty company June 25,1998 1

ODP 98-2029 I

United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 l

Portsmouu Gaseous Diffusion Plant (PORTS)

Docket No. 70-7002 Supplemental Response to Notice of Violation (NOV) 70-7002/97008-04 On November 26,1997, USEC submitted a response to the subject NOV (reference USEC letter ODP 97-2035). This violation concerned exceeding Technical Safety Requirement (TSR) overtime limits without prior approval. USEC's response to this violation committed to the following actions:

1.

Senior management appointed a multi-disciplined team to assess the overtime process to improve overtime exceedence compliance.

2.

Further improvements will be made to the overtime canvassing system to enhance the plant's ability to prevent overtime exceedences.

As indicated in the "Date of Full Compliance" section of this NOV response, USEC stated that the above corrective actions would be fully implemented by June 30,1998. These corrective actions

- were completed on schedule and have been effective in reducing the number of TSR violations.

However, additional overtime limit exceedences have occurred during implementation of these j

corrective actions. Thus, USEC is supplementing our original response to NOV 97008-04 to include i

the following additional corrective actions to further reduce the potential for future overtime exceedances:

Organization Managers will define the job classifications within their organizations that -

kl perform safety related work and must adhere to the overtime limits in the TSR. Organization Managers will then ensure that these applicable personnel are included in the overtime canvassing system. These actions will be completed by August 31,1998.

USEC will revise procedure XP2-HR-LR1030, " Limitations on llours of Work," to strengthen the adrninistrative controls for approving overtime work. This action will be completed by November 2,1998.

c.

v-9806300247 990625

'PDR ADOCK 07007002 '

C PDR P.O. Box 800, Port..nouth, OH 45661 l

Telephone 614-897-2255 Fax 614-897-2644 http://www. user.com Offices in Livermore, CA Paducah, KY Portsmouth, OH Washington, DC L___-_________

.o, United States Nuclear Regulatory Commission June 25,1998 Page 2 If you have any questions regarding this submittal, please contact Dave Waters at (740) 897-2710.

The. enclosure lists the commitments contained in this submittal.

Sincerely, h

J. Morris Brown General Manager Po'tsmouth Gascotu Diffusion Plant

Enclosure:

As Stated cc:

NRC Region 11I Office NRC Resident Inspector - PORTS 5

1 r-L _ _ - - _ __--_ - ___ _________

l

?

GDP 98-2029 Page1of1 LIST OF COMMITMENTS 1.

Organization Managers will define the job classifications within their organizations that perform safety related work and must adhere to the overtime limits irdhe TSR. Organization l

Managers will then ensure that these applicable personnel are included in the overtime canvassing system. These act. ions will be completed by August 31,1998.

2.

USEC will revise procedure XP2-IIR-LR1030, " Limitations on Ilours of Work," to strengthen the administrative controls for approving overtime work. Thu action will be completed by November 2,1998.