Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248K464 + (ML20248K464)
- ML20248K465 + (ML20248K465)
- ML20248K479 + (ML20248K479)
- ML20248K481 + (ML20248K481)
- ML20248K483 + (ML20248K483)
- ML20248K484 + (ML20248K484)
- ML20248K486 + (ML20248K486)
- L-98-113, Forwards Annual Financial Repts,Including Certified Financial Statements of Dqe,Firstenergy Corp,Oh Co,Il Co & Toledo Edison Co + (ML20248K499)
- ML20248K501 + (ML20248K501)
- ML20248K505 + (ML20248K505)
- 0CAN038915, Responds to NRC Re Violations & Proposed Imposition of Civil Penalty.Corrective Actions:Guidelines Established for Health Physic Shift Turnover to Include Discussion of Hot Particle Problems + (ML20248K507)
- 05000220/LER-1998-010-01, :on 980430,inadequate Reactor Vessel Level Instruments Were Noted.Caused by Inaccurate Input Parameter. Revised Calculations & Associated Instruments Were Recalibrated + (ML20248K510)
- ML20248K515 + (ML20248K515)
- ML20248K522 + (ML20248K522)
- IR 05000458/1989007 + (ML20248K525)
- ML20248K526 + (ML20248K526)
- ML20248K529 + (ML20248K529)
- ML20248K538 + (ML20248K538)
- ML20248K542 + (ML20248K542)
- ML20248K545 + (ML20248K545)
- ML20248K547 + (ML20248K547)
- ML20248K549 + (ML20248K549)
- ML20248K557 + (ML20248K557)
- ML20248K560 + (ML20248K560)
- ML20248K562 + (ML20248K562)
- IR 05000263/1998005 + (ML20248K565)
- ML20248K569 + (ML20248K569)
- ML20248K573 + (ML20248K573)
- 05000293/LER-1997-015-01, Forwards LER 97-015-01,re SSW Pumps Overload Settings to Low for Single SSW Pump Operation W/Degraded Voltage.Commitments Made within Ltr,Listed + (ML20248K575)
- ML20248K577 + (ML20248K577)
- ML20248K580 + (ML20248K580)
- ML20248K590 + (ML20248K590)
- ML20248K591 + (ML20248K591)
- ML20248K593 + (ML20248K593)
- ML20248K598 + (ML20248K598)
- ML20248K599 + (ML20248K599)
- ML20248K602 + (ML20248K602)
- 05000293/LER-1997-015, :on 971104,SSW Pump Overload Setting Was Too Low for Single SSW Pump Operation W/Degraded Voltage.Caused by Variation in SSW Pump BHP Characteristics.Removed SSW Pumps from Service & Reset OL Relay for Each SSW Pump + (ML20248K604)
- ML20248K619 + (ML20248K619)
- ML20248K625 + (ML20248K625)
- ML20248K630 + (ML20248K630)
- ML20248K633 + (ML20248K633)
- ML20248K637 + (ML20248K637)
- IR 05000312/1998002 + (ML20248K641)
- ML20248K645 + (ML20248K645)
- ML20248K651 + (ML20248K651)
- 05000213/LER-1998-003, :on 980505,compensatory Sampling Frequency Exceeded Time Limit W/Sw Effluent RM Inoperable.Caused by Personnel Error.Individual Was Counseled & Technicians Were Reminded of Sampling within Required Frequency + (ML20248K654)
- ML20248K657 + (ML20248K657)
- ML20248K662 + (ML20248K662)
- ML20248K664 + (ML20248K664)
- VPN-029-98, Forwards 1997 Annual Repts of Portland General Corp,Eugene Water & Electric Board & Pacific Power & Light Co (Pacificorp),Per 10CFR50.71(b).Merger of Enron & Poge Parent Company,Portland General Corp,Was Completed on 970701 + (ML20248K671)