J Woodard Southern Nuclear Executive Vice President Operating Comp:ny,Inc.
40 inverness Center Parkway Post Office Box 1295 Birmingharn Alabama 35201 Tet 205 992.5086 k
SOUTHERN L COMPANY aune 3, 1998 Energyso sern yournrid~
Docket Nos. 50.424 LCV-1212 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT VALVE INSERVICE TEST PROGRAM REVISIONS j
13y letter dated May 29,1997, Southern Nuclear Operating Company (SNC) submitted the second ten-year interval updates for the Pump and Valve Inservice Test Program for Vogtle Electric Generating Plant, Units 1 and 2. As indicated in the above referenced letter, implementation of the program has been phased-in over the pa;t year and full program implementation was completed by May 31,1998. During program procedure development the following program revisions were deemed necessrsy.
Twenty-four relief valves that provide overpressure protection for the Nuclear Service Cooling Water System were added to the valve test program s The test frequency for testing the Nuclear Service Cooling Water slow fill line check valves was revised from quarterly to refueling (Reference ROJ-32),
I The test method to verify closure for check valve 1/21208U6189 was changed from e
non-intrusive to measurement of pressure differential (Reference ROJ-22), and The test method to verify closure for check valve 1/2'1204U6013 was revised to allow valve disassembly and inspection as an alternative to non-intrusive testing (Reference l((
ROJ-6).
X
. :., W '
We consider the above revisions to be in compliance with the ASME OM Code and
' NUREG-1482 guidelines. As a result, NRC action is not considered necessary. Please find attached the affected page revisions for insertic n into your copy of the VEGP 2nd Ten-Year Interval Valve Inservice Test Program.
9906100166 900603 i PDR ADOCK 05000424 p
PDRi
(.
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ = _
U. S. Nuclear Regulatory Commission LCV-1212 Page Two.
- Should there be any questions in thi:: regard, please contact this office.
Sincerely,
.A
. D. Woodard JDW/KLO/kig -
Enclosure:
.- A&cted Page Revisions for the 2nd Ten-Year Interval Valve Inservice Test Program xc: Southern Nuclear Operating Comnany Mr. J. B. Beasley, Jr.
Mr. W. L. Burmeister Mr. M. Sheibani SNC Document Management U. S. Nuclear Regniatory Commincion Mr. L. A. Reyes, Regional Administrator Mr. D. H. Ja&, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle j