- ML20247P326 + (ML20247P326)
- 05000395/LER-1989-004, :on 890302,component Cooling Water Pump Started as Result of Improper Maint Activity,Resulting in ESF Actuation.Caused by Personnel Error.Communication Re Properly Scheduling Maint Established + (ML20247P327)
- ML20247P330 + (ML20247P330)
- IR 05000424/1989022 + (ML20247P331)
- IR 05000289/1987016 + (ML20247P334)
- ML20247P335 + (ML20247P335)
- ML20247P339 + (ML20247P339)
- ML20247P340 + (ML20247P340)
- ML20247P341 + (ML20247P341)
- ML20247P343 + (ML20247P343)
- PNO-IV-98-021, on 980520,loss of Offsite Power Occurred as Result of Fault on Transformer T1A-3,161 Kv to 4 Kv Transformer Which Supplies Power to One of Two Vital Electrical Buses.Special Followup Initiated on 980521 + (ML20247P351)
- ML20247P353 + (ML20247P353)
- ML20247P354 + (ML20247P354)
- 05000155/LER-1989-008-01, :on 890822,reactor Pressure Increased Rapidly Causing Reactor Trip on High Neutron Flux.Caused by Rapid Closure of Turbine Admission Valves Due to Gross Leakage. Control Rods Inserted & Cooling Maintained + (ML20247P355)
- IR 05000289/1987019 + (ML20247P356)
- ML20247P357 + (ML20247P357)
- IR 05000295/1998005 + (ML20247P359)
- ML20247P360 + (ML20247P360)
- IR 05000293/1989090 + (ML20247P361)
- IR 05000382/1988030 + (ML20247P367)
- IR 05000289/1988007 + (ML20247P369)
- 05000317/LER-1988-014, :on 881029,while Performing Surveillance Test Procedure to reverse-flow Test Check valves,MS-103 Leaked By.Caused by Excessive Cycling Due to leak-by of MS-102. Check Valve MS-103 Replaced W/Identical Valve + (ML20247P370)
- 05000304/LER-1985-022-01, :on 851015,fuel Handling Accident Radiation Monitor Exceeded High Alarm Setpoint of 300 Mrem/H Due to High Exposure Rate from Upper Internals,Resulting in Closure of Containment Purge Valves.Procedure Revised.W/Undated Ltr + (ML20247P371)
- ML20247P372 + (ML20247P372)
- PNO-IV-98-021A, on 980526,update to Loss of Offsite Power Made.Components Have Been Replaced & Sys Functioning Properly.Correction Should Be Made to Info in Original Pn. Nonvital Buses 1A1 & 1A2 Continuously Energized + (ML20247P373)
- IR 05000289/1988030 + (ML20247P374)
- 05000267/LER-1989-017, :on 890818,wide Range Nuclear Channels III & V Upscaled & Tripped in Response to Induced Electrical Noise. Attempt to Locate Section of Cable Into Which Noise Being Induced Unsuccessful + (ML20247P376)
- 05000423/LER-1998-016-01, Forwards LER 98-016-01,determined Reportable at Millstone Unit 3 on 980223,per 10CFR50.73(a)(2)(vii).Commitments Made within Ltr,Encl + (ML20247P377)
- ML20247P379 + (ML20247P379)
- 05000317/LER-1989-015, :on 890822,determined That Calculations Used to Determine That Dousing Sys for Containment Iodine Filters Not Required to Be Environmentally,In Error.Justification for Continued Operation Will Be Established + (ML20247P384)
- ML20247P385 + (ML20247P385)
- 05000395/LER-1989-015, :on 890825,pressurizer Safety Valve Body Inlet a Temp Increased to Greater than 450 F & Plant Shutdown Initiated.Licensee Continuing to Evaluate Cause.Manual Reactor Trip Initiated + (ML20247P387)
- 05000423/LER-1998-016, :on 980223,potential Air/Gas Intrusion in Chemical & Volume Control Sys Was Noted.Caused by Inadequate Initial Design.No Cause for Corrective Actions Because Both Flow Paths Were Operable + (ML20247P389)
- 05000029/LER-1989-003, :on 890209,chemistry Analysis of Steam Generator 2 Blowdown Effluent Indicated Abnormal Results. Caused by Personnel Error.Personnel Will Be Trained Re Regulatory Requirements & Procedures Revised + (ML20247P392)
- IR 05000413/1989009 + (ML20247P398)
- 05000413/LER-1989-019, :on 890628,unplanned Automatic Alignment of Nuclear Svc Water Sys to Standby Nuclear Svc Water Pond Occurred.Caused by Defective Procedure Due to Erroneous Circuit Isolation.Calibr Procedures Revised + (ML20247P399)
- 05000328/LER-1989-011-03, :on 890823,discovered That Tech Spec Surveillance Requirement to Source Check Radioactive Gaseous Effluent Monitors on Condenser Vacuum Pump Exhaust Not Fully Met.Root Cause Being Investigated + (ML20247P401)
- ML20247P402 + (ML20247P402)
- 05000423/LER-1998-002, Informs of Revised Completion Date to Complete Commitment Contained in LER 98-002-00, Verification of ECCS Piping Full of Water Per TS 4.5.2.b.1 Not Being Met. New Commitment Made by Util,Encl + (ML20247P404)
- ML20247P405 + (ML20247P405)
- NL-89-468, Submits Justification for Absence of Functional Testing Requirement in Proposed Tech Spec 4.14(f) Re Snubber Svc Life Monitoring,Per 890517 Request + (ML20247P406)
- NOC-AE-000179, Documents Change of Schedule for Written Portion of Licensed Operator Exams to Be Conducted at Stp.Operational Portion of Exam Will Still Be Taken During Wk of 980601 & Written Portion Will Be Given on 980630 + (ML20247P407)
- ML20247P410 + (ML20247P410)
- JPN-98-019, Informs of Revs to ISI Program Relief Requests for Second ten-year Interval Closeout & Summary Rept,Submitted 970715. Replacement Pages,Reflecting Changes,Encl + (ML20247P411)
- IR 05000369/1989030 + (ML20247P415)
- ML20247P417 + (ML20247P417)
- ML20247P418 + (ML20247P418)
- U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable + (ML20247P420)
- ML20247P423 + (ML20247P423)
- IR 05000397/1998002 + (ML20247P424)
- ML20247P426 + (ML20247P426)