Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000266/LER-1989-003, :on 890601,injection of High Artificial High Radiation Signal Failed to Close Containment Isolation Valve.Defective Solenoid Valve Controlling Air to Isolation Valve Air Operator Replaced + (ML20246B087)
- ML20246B090 + (ML20246B090)
- ML20246B091 + (ML20246B091)
- NRC-89-0097, Forwards Fermi 2 Power Plant Remote Sensing & Vegetation Ground Truth Program 1988 Final Rept. No Environ Protection Plan Noncompliances Occurred During Period.Terrestrial Monitoring Performed on Area Around Plant + (ML20246B098)
- ML20246B100 + (ML20246B100)
- ML20246B102 + (ML20246B102)
- ML20246B104 + (ML20246B104)
- IR 05000250/1989033 + (ML20246B108)
- ML20246B110 + (ML20246B110)
- ML20246B111 + (ML20246B111)
- ML20246B112 + (ML20246B112)
- ML20246B113 + (ML20246B113)
- ML20246B116 + (ML20246B116)
- PY-CEI-NRR-1049, Responds to Notice of Violation & Proposed Imposition of Civil Penalty Dtd 890711.Corrective Actions:All Limitorque Terminal Blocks Not Marathon 300 Replaced.Penalty in Amount of $37,500 Paid + (ML20246B118)
- ML20246B120 + (ML20246B120)
- ML20246B125 + (ML20246B125)
- ML20246B129 + (ML20246B129)
- ML20246B132 + (ML20246B132)
- ML20246B133 + (ML20246B133)
- ML20246B136 + (ML20246B136)
- ML20246B137 + (ML20246B137)
- 05000313/LER-1989-023, :on 890605,determined That Power Range Nuclear Instrumentation Calibr Required by Tech Specs Had Not Been Performed within Specified Frequency.Caused by Lack of Procedural Guidance.Procedure Revised + (ML20246B139)
- 05000341/LER-1989-014, :on 890603 & 18,discovered That Both Channels Bypass/Unbypass Functions Were Slightly Above Limits Allowed in Tech Specs.Caused by Emphasis on Checking Bypass Function of Bistable.Channels Properly Calibrated + (ML20246B142)
- ML20246B144 + (ML20246B144)
- IR 05000413/1989015 + (ML20246B147)
- ML20246B148 + (ML20246B148)
- ML20246B151 + (ML20246B151)
- ML20246B155 + (ML20246B155)
- ML20246B159 + (ML20246B159)
- ML20246B167 + (ML20246B167)
- 0CAN048909, Application for Amends to Licenses DPR-51 & NPF-6,reflecting Planned Organizational Changes Which Util Will Begin Transitioning Into on 890501,w/goal of Completing Reorganization by 890601.Fee Paid + (ML20246B169)
- ML20246B172 + (ML20246B172)
- IR 05000302/1987017 + (ML20246B178)
- ML20246B180 + (ML20246B180)
- ML20246B181 + (ML20246B181)
- ML20246B185 + (ML20246B185)
- ML20246B186 + (ML20246B186)
- W3P89-1538, Monthly Operating Rept for Jul 1989 for Waterford 3 + (ML20246B187)
- ML20246B188 + (ML20246B188)
- AECM-89-0127, Special Rept 89-006/0:on 890603,smoke Detector NSP65N627H in Fire Zone 2-04 of Auxiliary Bldg Continuously Alarmed & Failed to Reset.Caused by Steam Leakage in RWCU Sys Recirculation Pump B Room.Leakage Repaired + (ML20246B194)
- ML20246B196 + (ML20246B196)
- ML20246B199 + (ML20246B199)
- ML20246B200 + (ML20246B200)
- ML20246B202 + (ML20246B202)
- ML20246B203 + (ML20246B203)
- 05000458/LER-1989-012, :on 890325,ESF Isolation Occurred for RWCU Main Steamline Drains & RHR Shutdown Cooling Sys.Caused by Loss of Power to Div II Isolation Logic When Breaker Opened. Breaker Reclosed + (ML20246B208)
- AECM-89-0153, Monthly Operating Rept for Jul 1989 for Grand Gulf Nuclear Station Unit 1 + (ML20246B211)
- ML20246B212 + (ML20246B212)
- 05000293/LER-1989-023, :on 890718,manually Initiated Reactor Protection Sys Scram Signal & Reactor Scram Occurred, Resulting in turbine-generator Trip & Transfer of Electrical Loads.Procedure Re Air Ejector Revised + (ML20246B214)
- 05000423/LER-1989-017, :on 890718,motor-operated Isolation Valve for Containment Recirculation Spray Header Inoperable for 27 H. on 890717,dual Position Indication Observed in Control Board.Caused by Inadequate Guidance + (ML20246B219)
- ML20246B221 + (ML20246B221)