Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245L709 + (ML20245L709)
- ML20245L710 + (ML20245L710)
- ML20245L713 + (ML20245L713)
- NL-89-593, Forwards Plant Closure Organizational Charts & Administrative Procedure RSAP-0101,per 890802 Request + (ML20245L719)
- ML20245L720 + (ML20245L720)
- ML20245L721 + (ML20245L721)
- ML20245L725 + (ML20245L725)
- ML20245L728 + (ML20245L728)
- ML20245L729 + (ML20245L729)
- ML20245L733 + (ML20245L733)
- ML20245L734 + (ML20245L734)
- ML20245L737 + (ML20245L737)
- ML20245L738 + (ML20245L738)
- 05000382/LER-1989-010, :on 890520,determined That Low Recirculation Flow Not Included in Pump Operability Which Resulted in Noncompliance W/Tech Spec 4.0.5.Caused by Miscommunication. Procedures Revised + (ML20245L739)
- ML20245L740 + (ML20245L740)
- ML20245L747 + (ML20245L747)
- ML20245L748 + (ML20245L748)
- ML20245L749 + (ML20245L749)
- ML20245L751 + (ML20245L751)
- ML20245L753 + (ML20245L753)
- ML20245L754 + (ML20245L754)
- ML20245L755 + (ML20245L755)
- 05000260/LER-1989-016-01, :on 890530,determined That 480 Volt Shutdown Board 2A Not Maintained in Seismically Qualified Configuration.Caused by Personnel Error.Conduct of Operations Instruction Revised + (ML20245L757)
- ST-HL-AE-3205, Forwards Vols 1 & 2 of Amended Preservice Insp Summary Rept for Class 1 & Class 2 Pressure Retaining Components... Re Completion of Exams Required by ASME Section XI Code for Welds in Class 1 & 2 Components & Augmented Insp Program + (ML20245L759)
- ML20245L761 + (ML20245L761)
- ML20245L765 + (ML20245L765)
- ML20245L771 + (ML20245L771)
- ML20245L772 + (ML20245L772)
- ML20245L785 + (ML20245L785)
- TXX-8943, Absplemental Deficiency Rept CP-88-09 Re Overloading & Absence of Backup Protection Devices for Electrical Penetrations.Initially Reported on 880111.Purpose of Supplemental Rept to Revise Corrective Action Schedule + (ML20245L787)
- ML20245L790 + (ML20245L790)
- ML20245L791 + (ML20245L791)
- ST-HL-AE-3201, Forwards Amended Preservice Insp Summary Rept for Class 1, Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station,Unit 2 + (ML20245L793)
- ML20245L796 + (ML20245L796)
- 05000260/LER-1989-002-01, :on 890120,determined That Existing Support Design for Automatic Depressurization Sys Air Accumulator Pressure Switches Not Seismically Qualified.Design Practices Has Changed Since Const of Plant + (ML20245L798)
- ML20245L801 + (ML20245L801)
- ML20245L802 + (ML20245L802)
- 05000374/LER-1989-010-02, :on 890715,HPCS Sys Inoperable Due to Voltage Oscillations on Div III Battery Charger.Possibly Caused by Problems W/High Voltage Shutdown Relay.Chart Recorder Connected to Monitor Coil Voltage + (ML20245L804)
- ML20245L806 + (ML20245L806)
- ML20245L809 + (ML20245L809)
- ML20245L811 + (ML20245L811)
- ML20245L816 + (ML20245L816)
- RBG-31174, Application for Amend to License NPF-47,revising License Condition 2.C.14,Attachment 5 Re Emergency Response Capabilities,Requiring Implementation of Reg Guide 1.97 Mods to Neutron Monitoring Sys + (ML20245L817)
- ML20245L819 + (ML20245L819)
- ML20245L821 + (ML20245L821)
- ML20245L822 + (ML20245L822)
- ML20246A000 + (ML20246A000)
- ML20246A003 + (ML20246A003)
- ML20246A006 + (ML20246A006)
- ML20246A009 + (ML20246A009)
- ML20246A010 + (ML20246A010)