ML20245L816

From kanterella
Jump to navigation Jump to search
Forwards List of Initial Startup Test Procedures Available for NRC Exam,Per FSAR Section 14.2.11 Requirements
ML20245L816
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/18/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-89587, NUDOCS 8908220321
Download: ML20245L816 (4)


Text

_ . _ _ _ ____ _ _, . _ _ _ _ _ _ _ _ _ _ . _ . . _ _ _ _ _ _ _

m m. .: .

3

6- l ,(.1. :

y

+ ~..

M

'EE Log'.# TXX-89587 L J File # 10110

'O .

C- 914.2

'Ref. # 10CFR50.34(b).

August 18, 1989 .

. Wlaient J.Cahal.Jr.

Executive Vsce President U' S. Nuclear Regulatory Commission

. Attn: Document Control Desk Washington' D. C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 3.- ,

DOCKET NOS. 50-445 AND 50-446

. INITIAL STARTUP. TEST PROCEDURES Gentlemen:

Attached is a' list of Initial Startup (ISU) test procedures which are

-available for NRC examination. Thirty-five of the forty ISU test procedures lhave been approved-by-the Station Operation Review Committee (50RC)'with the remaining five'in' draft form. TV Electric expects to have the approved copies of.the remaining draft procedures available for NRC' review within:'

approximately-the'next two weeks.

This notice-.is to fulfill the requirement in the CPSES'FSAR (Section 14.2.11) that the ISU_ test procedures will be available for examination by the NRC.

regional personnel, approximately 60 days prior to scheduled fue1 ~ 1oading date.

'If you have any questions, please contact Mr. Jerry Martin at (817) 897-0208

.or Mr. Steve Ellis at (817) 897-8422. ,

Sincerely, 42-William J. ahill, Jr.

-RSB/vid Attachment 9

c - Mr'. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

Mr. J. H. Wilson, OSP-NRC 0

gue2ggggagggp hOh ,

A

)

j[a, 400 North Olive Street LB 81 Dallas, Texas 75201 1_____o____._.________

s ...

Attachment to TXX-89587 August 18, 1989

Page 1 of-3 ISU PROCEDURE INDEX Procedure Nom Procedure Title.

ISU-001A INITIAL FUEL LOAD SEQUENCE ISU-003A CORE LOADING INSTRUMENTATION AND NEUTRON i SOURCE CHECKS ISU-006A RCS AND SECONDARY COOLANT CHEMISTRY ISU-007A (DRAFT) ISU DAS INSTALLATION AND VERIFICATION ISU-010A POST CORE LOAD PRECRITICAL TEST SEQUENCE ISU-015A REACTOR TRIP SYSTEM TESTS ISU-016A INCORE MOVABLE DETECTOR SYSTEM ALIGNMENT ISU-019A (DRAFT) PROCESS COMPUTER SOFTWARE VERIFICATION ISU-020A STARTUP ADJUSTMENTS OF REACTOR CONTROL SYSTEMS ISU-021A PRESSURIZER SPRAY AND HEATER CAPABILITY ISU-022A (DRAFT) REACTOR COOLANT SYSTEM SYSTEM LEAKAGE RATE TEST ISU-023A REACTOR COOLANT FLOW MEASUREMENT ISU-024A REACTOR COOLANT SYSTEM FLOW COASTDOWN TEST ISU-026A COLD CONTROL R0D DRIVE OPERABILITY TEST ISU-027A h0T CONTROL R0D DRIVE OPERABILITY TEST ISU-101A INITIAL CRITICALITY AND LOW POWER TEST SEQUENCE ISU-202A CALIBRATION OF FEEDWATER AND STEAM FLOW INSTRUMENTATION AT POWER ISU-203A AUTOMATIC REACTOR CONTROL SYSTEM TEST

~

,r: 2 ~;; ' ^

i.

Attachment to.TXX-89587 August.18, 1989

Page 2 of 3.

ISU PROCEDURE INDEX Procedure No, Procedure Title ISU-204A OPERATIONAL ALIGNMENT OF NUCLEAR INSTRUMENTATION ISU-205A DYNAMIC AUTOMATIC STEAM DUMP CONTROL ISU-207A STEAM GENERATOR LEVEL CONTROL TEST ISU-208A RADIATION SURVEY TESTS ISU-210A PROCESS AND' EFFLUENT RADIATION MONITORING PERFORMANCE TEST ISU-211A LOOSE PARTS MONITORING BASELINE DATA ISU-212A (DRAFT) PIPING VIBRATION MONITORING ISU-220A TURBINE GENERATOR INITIAL SYNCHRONIZATION AND OVERSPEED TEST ISU-222A TURBINE GENERATOR TRIP WITH COINCIDENT LOSS OF 0FFSITE POWER l- ISU-223A REMOTE SHUTDOWN CAPABILITY TEST ISU'224A THERMAL POWER MEASUREMENT AND STATEPOINT DATA COLLECTION ISU-226A OPERATIONAL ALIGNMENT OF PROCESS TEMPERATURE AND N16 INSTRUMENTATION ISU-231A DESIGN LOAD SWING TESTS ISU 238A MAIN FEEDWATER SYSTEM TEST ISU-240A 50% REACTOR POWER TEST SEQUENCE i

,- __- _r.,,..-..-. . _ , - _ . . , _ - _ . - - . . . _ - - - , _ . -

~~

Q- . . e,. ,+

Attachment to TXX-89587

. August 18, 1989 Page 3.of'3 ISU PROCEDURE INDEX Procedure No. Procedure TNie ISU-260A 75% REACTOR PCWER TEST SEQUENCE ISU-263A .LARGE LOAD REDUCTION TESTS ISU-280A 100% REACTOR POWER TEST SEQUENCE ISU-281A NSSS ACCEPTANCE TEST-ISU-282A CONTAINMENT AND PENETRATION ROOM TEMPERATURE SURVEY ISU-284A DYNAMIC RESPONSE T0-FULL LOAD REJECTION AND TURBINE TRIP ISU-308A (DRAFT) THERMAL EXPANSION. POWER ASCENSION PHASE i

t 1

- _ _ _ _ - - - - - - - - _ _ - - - . _ . - - - _ _ _ _ . - _ - _ _ . _ . . - _ . - . _ _ _ _ _ . - . _ _ - . _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , , _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _