ML20245L816
| ML20245L816 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/18/1989 |
| From: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TXX-89587, NUDOCS 8908220321 | |
| Download: ML20245L816 (4) | |
Text
_. _
m m.
3 6-l
,(.1. :
+
~..
y M
'EE Log'.# TXX-89587 L
J File # 10110
'O C-914.2
'Ref. # 10CFR50.34(b).
August 18, 1989
. Wlaient J.Cahal.Jr.
Executive Vsce President
- U' S. Nuclear Regulatory Commission
. Attn: Document Control Desk Washington' D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 3.-
. INITIAL STARTUP. TEST PROCEDURES Gentlemen:
- Attached is a' list of Initial Startup (ISU) test procedures which are
-available for NRC examination. Thirty-five of the forty ISU test procedures lhave been approved-by-the Station Operation Review Committee (50RC)'with the remaining five'in' draft form. TV Electric expects to have the approved copies of.the remaining draft procedures available for NRC' review within:'
approximately-the'next two weeks.
This notice-.is to fulfill the requirement in the CPSES'FSAR (Section 14.2.11) that the ISU_ test procedures will be available for examination by the NRC.
regional personnel, approximately 60 days prior to scheduled fue1 ~ 1oading date.
'If you have any questions, please contact Mr. Jerry Martin at (817) 897-0208
.or Mr. Steve Ellis at (817) 897-8422.
Sincerely, 42-William J.
ahill, Jr.
-RSB/vid Attachment 9
c - Mr'. R. D. Martin, Region IV Resident Inspectors, CPSES (3)
- Mr. J. H. Wilson, OSP-NRC 0
hOh gue2ggggagggp
)
A j[
400 North Olive Street LB 81 Dallas, Texas 75201 a,
1_____o____._.________
s Attachment to TXX-89587 August 18, 1989 Page 1 of-3 ISU PROCEDURE INDEX Procedure Nom Procedure Title.
ISU-001A INITIAL FUEL LOAD SEQUENCE ISU-003A CORE LOADING INSTRUMENTATION AND NEUTRON i
SOURCE CHECKS ISU-006A RCS AND SECONDARY COOLANT CHEMISTRY ISU-007A (DRAFT)
ISU DAS INSTALLATION AND VERIFICATION ISU-010A POST CORE LOAD PRECRITICAL TEST SEQUENCE ISU-015A REACTOR TRIP SYSTEM TESTS ISU-016A INCORE MOVABLE DETECTOR SYSTEM ALIGNMENT ISU-019A (DRAFT)
PROCESS COMPUTER SOFTWARE VERIFICATION ISU-020A STARTUP ADJUSTMENTS OF REACTOR CONTROL SYSTEMS ISU-021A PRESSURIZER SPRAY AND HEATER CAPABILITY ISU-022A (DRAFT)
REACTOR COOLANT SYSTEM SYSTEM LEAKAGE RATE TEST ISU-023A REACTOR COOLANT FLOW MEASUREMENT ISU-024A REACTOR COOLANT SYSTEM FLOW COASTDOWN TEST ISU-026A COLD CONTROL R0D DRIVE OPERABILITY TEST ISU-027A h0T CONTROL R0D DRIVE OPERABILITY TEST ISU-101A INITIAL CRITICALITY AND LOW POWER TEST SEQUENCE ISU-202A CALIBRATION OF FEEDWATER AND STEAM FLOW INSTRUMENTATION AT POWER ISU-203A AUTOMATIC REACTOR CONTROL SYSTEM TEST
~
2 ~;; ' ^
i.
,r:
Attachment to.TXX-89587 August.18, 1989
- Page 2 of 3.
ISU PROCEDURE INDEX Procedure No, Procedure Title ISU-204A OPERATIONAL ALIGNMENT OF NUCLEAR INSTRUMENTATION ISU-205A DYNAMIC AUTOMATIC STEAM DUMP CONTROL ISU-207A STEAM GENERATOR LEVEL CONTROL TEST ISU-208A RADIATION SURVEY TESTS ISU-210A PROCESS AND' EFFLUENT RADIATION MONITORING PERFORMANCE TEST ISU-211A LOOSE PARTS MONITORING BASELINE DATA ISU-212A (DRAFT)
PIPING VIBRATION MONITORING ISU-220A TURBINE GENERATOR INITIAL SYNCHRONIZATION AND OVERSPEED TEST ISU-222A TURBINE GENERATOR TRIP WITH COINCIDENT LOSS OF 0FFSITE POWER l-ISU-223A REMOTE SHUTDOWN CAPABILITY TEST ISU'224A THERMAL POWER MEASUREMENT AND STATEPOINT DATA COLLECTION ISU-226A OPERATIONAL ALIGNMENT OF PROCESS TEMPERATURE AND N16 INSTRUMENTATION ISU-231A DESIGN LOAD SWING TESTS ISU 238A MAIN FEEDWATER SYSTEM TEST ISU-240A 50% REACTOR POWER TEST SEQUENCE i
_r.,,..-..-.
~~
Q-
.. e,.
,+
Attachment to TXX-89587
- . August 18, 1989 Page 3.of'3 ISU PROCEDURE INDEX Procedure No.
Procedure TNie ISU-260A 75% REACTOR PCWER TEST SEQUENCE ISU-263A
.LARGE LOAD REDUCTION TESTS ISU-280A 100% REACTOR POWER TEST SEQUENCE ISU-281A NSSS ACCEPTANCE TEST-ISU-282A CONTAINMENT AND PENETRATION ROOM TEMPERATURE SURVEY ISU-284A DYNAMIC RESPONSE T0-FULL LOAD REJECTION AND TURBINE TRIP ISU-308A (DRAFT)
THERMAL EXPANSION. POWER ASCENSION PHASE i
t 1
,, _ _ _ _, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _