ML20245L738

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Inservice Insp 10-Yr Plan for Second Insp Interval at Unit 1 & First Interval at Unit 2. Plan Also Included Piping Weld Summaries That Tabulate Number of Welds & Exams,By Item Number & Sys to Facilitate Review
ML20245L738
Person / Time
Site: Beaver Valley
Issue date: 08/11/1989
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245L742 List:
References
NUDOCS 8908220280
Download: ML20245L738 (2)


Text

..

g

.ii/01 ja

' f-j ;

8* aver Valley Power Stanon

.0 Shengport, PA 15077@04 v@S.En?ma,o,,

i ma sosas August 11, 1989 U.:S. Nuclear Regulatory Commission Attn:

Document Control Desk

. Washington,'DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2. Docket No. 50"412, License No.-NPF-73 ISI Ten'. Year Plan; Revision-1

' Gentlemen:

Attached is the Beaver Valley Power Station Inservice Inspection

' Program Ten Year Plan, Revision 1.for; Unit No.-1, Second Inspection interval Unit No. 2,.First Inspection interval

.Each Ten Year' Plan contains a program description, examination schedules,.and relief requests.

Also included are piping weld

. summaries that tabulate the number of welds and examinations, by item number' a'nd'-system to facilitate review.- A synopsis sheet detailing

'the. scope'of: Revision 1 changes has been enclosed for each Plan.

Please note that the Unit No. 2 Ten Year Plan contains two blank

-pages' in place of Westinghouse Electric Corporation proprietary

. drawings.

These.two drawings will be transmitted to the NRC under a separate cover letter.

If you 'have any questions, ple.ase contact me or members of ny staff.

Sincerely, M%

J.

D.

Sieber

'Vice President Nuclear Group g

'ft Attachment 8908220280 890811 PDR ADOCK 05000334 Q.

PDC

j

+

fQj.

g'_.

B Ov0r Volley Powar Station, Unit Nos. 1&2 D6cket No. 50-334, License No. DPR-66 Docket No. 50-412, License.No. NPF-73 Page 2 cc:

Mr. J.

Beall, Sr. Resident Inspector Mr. W. T.

Russell, NRC Region I Administrator Mr.

P. Tam, Sr. Project Manager Mr. R. Saunders, Director, Saf. Eval. & Cont. (VEPCO) (w/o att)

.______..__-___-.m.

_ _ - _ - _. _______