Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20244C024 + (ML20244C024)
- ML20244C025 + (ML20244C025)
- ML20244C027 + (ML20244C027)
- ML20244C031 + (ML20244C031)
- IR 05000266/1989017 + (ML20244C032)
- PNO-III-89-025, on 890411,main Turbine Tripped by Licensee. Reactor Shut Down for Repairs on Already Malfunctioning Main Turbine Governor Valve.Unit Expected to Return to Svc on 890416.State of Il to Be Notified + (ML20244C034)
- ML20244C036 + (ML20244C036)
- ML20244C037 + (ML20244C037)
- 05000325/LER-1989-007, :on 890314,unplanned Auto Start of Standby Gas Treatment Sys Trains Occurred.Caused by Control Operator Mental Error.Operator Counseled on Importance of Identifying Components Prior to Performing Evolutions + (ML20244C039)
- ML20244C041 + (ML20244C041)
- ML20244C042 + (ML20244C042)
- ML20244C043 + (ML20244C043)
- ML20244C046 + (ML20244C046)
- ML20244C047 + (ML20244C047)
- ML20244C049 + (ML20244C049)
- NRC-89-0059, Responds to NRC Re Violations Noted in Insp Rept 50-341/89-02.Direction Given to Maint & Mod Supervisors to Ensure Parts Returned to Warehouse or Stored in Controlled Areas Per Procedures + (ML20244C052)
- ML20244C053 + (ML20244C053)
- ML20244C055 + (ML20244C055)
- PNO-I-89-027, on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched + (ML20244C056)
- ML20244C057 + (ML20244C057)
- ML20244C059 + (ML20244C059)
- ML20244C061 + (ML20244C061)
- 05000293/LER-1989-015, :on 890503,high Reactor Vessel Water Level Occurred That Resulted in Automatic Turbine Trip,Generator Trip & Reactor Scram.Caused by Inadequate Troubleshooting Procedure.Feedwater Sys Components Recalibr + (ML20244C062)
- IR 05000324/1989008 + (ML20244C064)
- ML20244C066 + (ML20244C066)
- ML20244C067 + (ML20244C067)
- ML20244C068 + (ML20244C068)
- ML20244C069 + (ML20244C069)
- ML20244C072 + (ML20244C072)
- PNO-IV-89-027, on 890413,stop Work Order Issued to Two Contractors During Refueling Outage Due to Instances Where Contractors Failed to Adequately Implement Licensee Clearance Program.Work to Resume Under New Work Rules + (ML20244C074)
- ML20244C075 + (ML20244C075)
- ML20244C076 + (ML20244C076)
- ML20244C077 + (ML20244C077)
- PNO-V-89-033A, on 890607,util Shut Down Plant & Entered Hot Shutdown Due to Voter Defeat of Measure K.Util Continuing to Implement Contingency Plan to Remove Plant from Svc. Reductions in Site Work Force Under Consideration + (ML20244C079)
- ML20244C080 + (ML20244C080)
- ML20244C082 + (ML20244C082)
- ML20244C083 + (ML20244C083)
- ML20244C085 + (ML20244C085)
- ML20244C087 + (ML20244C087)
- ML20244C088 + (ML20244C088)
- ML20244C089 + (ML20244C089)
- ML20244C090 + (ML20244C090)
- ML20244C091 + (ML20244C091)
- IA-87-356, Notification of Location Change for 830218 Meeting W/Util in Bethesda,Md to Discuss Clarification of Sys,Components & Structures + (ML20244C092)
- ML20244C092 + (ML20244C092)
- ML20244C093 + (ML20244C093)
- ML20244C094 + (ML20244C094)
- ML20244C095 + (ML20244C095)
- PNO-V-89-033, on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented + (ML20244C096)
- ML20244C097 + (ML20244C097)
- ML20244C100 + (ML20244C100)