Forwards Discharge Self Monitoring Rept for Feb 1989. High Coliform Value Recorded on 890201 Caused by Chlorine Sys Unavailability,On 890203,caused by Improper Chlorine Flow Setting & on 890209,high Total Erroneous
ML20244C031
Person / Time
Site: Rancho Seco
Issue date: 03/21/1989
From: Keuter D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20244C033 List:
References
AGM-NPP-89-119, NUDOCS 8904200004
Download: ML20244C031 (2)


Text

, _ . - - - - .

j. o ;; -

h , g ' * *

  • ~

> ,,+. .. .

l  ;' d )SMUD SACRAMENTO MUNICIPAL UTILITY DISTR!CT O 6201 S Street, P.o. Box 15830. Sacramento CA 95852-1830,(916) 452-3211 l AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA AGM/NPP 89-119 d N

M e:

?G

- v March 21, 1989 (D 4 U. S. Nuclear Regulatory Commission Attn: J. B. Martin, Regional Administrator Region V 1450 Maria Lane, Suite 210 Halnut Creek, CA 94596 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Dear Mr. Martin:

As a condition of the approval of Amendment No. 45 to Facility Operating License No. DPR-54, the District agreed to provide the NRC with a copy of any changes to the NPDES discharge permit.and any permit violations.

Attached is a copy of the Discharger Self Monitoring Report for the month of February 1989. The report makes note of water quality violations.

1. The high total coliform value recorded on February 1 was caused by chlorine system unavailability. The high total coliform. recorded on February 3 resulted from an improper chlorine flow setting which was made when the chlorine system was returned to service on February 2.

The high total coliform value on February 9 is believed to be erroneous since the coliform results the day before and the day after were satisfactory and all three samples had a chlorine residual of 0.6 ppm.

2. The high BOD results encountered during the month of February are attributed to the unusually cold weather during the month. Dewante and Stowell Consulting Engineers concur with site personnel that high BOD results can occur during cold weather.

nas R

I

, RANCHO SECO NUCLEAR GENERATING STATloN O 1444o Twin Cities Road, Herald, CA 95638 9799;(209) 333 2935

g :,,, . ,y ' : *  ? '

33- c ~

h ; r.j , ~ [ [Mr. Martin AGM/NPP 89-119 Members of:your staff with questions requiring additional information or clarification may contact Mr. George Campbell at (209) 333-2935,

. extension;.4147._-

Sincerely,

$(w

. $ Dan R.:Keuter Assistant-General Manager--

- Nuclear. Plant Manager

.' Attachment