Text
.
.
.
.
,
c.
Jr. Reply Refer To:
JIE - 8 W
Docket:
50-285/89-24
Omaha Public Power District
,
ATTN:
Kenneth J. Morris, Division Manager
'
Nuclear Dperations
1623 Harney Street
,
Omah?, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Mr. Nemen M. Terc of this office
i
during the perioc May 8-12, 1989, of activities authorized by NRC Operating
License DPR-40 for Fort Calhoun Station and to the discussion of our findings
,
'
with Mr. G. R. Peterson and other members of your staff at the conclusion of
the inspection.
Areas examined during the inspection included a review of the operational
status of the emergency preparedness program. Within this area, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspector. The
inspection findings are documented in the enclosed inspection report.
Within the scope of this inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
)
James L. Milhoan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-285/89-24
(cc's on next page)
/
RIV:SEPS
C:SEPS
C:RPB
D:DRSS
D:b sP '
- NTerc
- JEveret'
- BMurray
- BBeach
JMipoan
g/,/89
/ /89
/ /E -
/ /89
/ /89
Previously concurred.
p
60
0
.:r
! l
PCc.
~'
- - - - _ _ _JfS_6
-
- _ - .
.
i
.
.
.
.
.
.-
Omaha Public Power District
-2-
i
i
!
"
cc w/ enclosures:
Fort Calhoun Station
ATTN:
W. G. Gates, Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf,-Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
I
Program Manager
,
FEMA Region 7
911 Walnut Street, Room 200
64106
Director
Nebraska Civil Defense Agency
1300 Military Road
Lincoln, Nebraska 68508
Nebraska Radiation Control Program Director
bec to DMB (IE35) - NMSB
bec distrib. by RIV:
- R.D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/B)
- MIS System
- RIV File
"DRP
- RSTS Operator
- Project Engineer (DRP/B)
Lisa Shea, RM/ALF
"DRS
- P. Milano, NRR Project Manager (MS:
13-D-18)
- RRI
- Charles Hackney, RSLO
- w/766
_ ___ ________________ - ___________
_-