Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20244B871 + (ML20244B871)
- ML20244B874 + (ML20244B874)
- 05000461/LER-1989-015, :on 890311,surveillance Review Group Noted That Section 8.4 Not Been Performed within Max Time Interval Permitted by Tech Spec 4.0.2.Caused by Personnel Error. Individual Counseled on Failure to Use Ref + (ML20244B875)
- ML20244B876 + (ML20244B876)
- ML20244B877 + (ML20244B877)
- ML20244B879 + (ML20244B879)
- ML20244B881 + (ML20244B881)
- ML20244B882 + (ML20244B882)
- ML20244B883 + (ML20244B883)
- ML20244B885 + (ML20244B885)
- IA-86-718, Advises That Team Insp Will Be Conducted During Wk of 820412.Region Will Pursue Circumstances Surrounding Statements in Indicating Facility Met Requirements of App R + (ML20244B886)
- ML20244B886 + (ML20244B886)
- ML20244B887 + (ML20244B887)
- ML20244B890 + (ML20244B890)
- ML20244B891 + (ML20244B891)
- ML20244B893 + (ML20244B893)
- ML20244B894 + (ML20244B894)
- AECM-89-0108, Forwards Rev 8 to GGNS-TOP-1A, Operational QA Manual, Per 10CFR50.54(a)(3),for Evaluation.Program Described in Rept Will Be Implemented Upon NRC Approval or 60 Days After Date of Submittal + (ML20244B897)
- ML20244B898 + (ML20244B898)
- ML20244B901 + (ML20244B901)
- ML20244B902 + (ML20244B902)
- IR 05000445/1988059 + (ML20244B903)
- ML20244B904 + (ML20244B904)
- ML20244B906 + (ML20244B906)
- ML20244B909 + (ML20244B909)
- ML20244B910 + (ML20244B910)
- PNO-V-89-033B, on 890608,licensee Continuing Cooldown of Plant.Ceo Nuclear,J Firlit,Announced Resignation.Work Force Reductions Initiated Which Will Initially Involve Approx 420 Nonessential Contractor Clerical & Crafts Personnel + (ML20244B912)
- ML20244B913 + (ML20244B913)
- ML20244B914 + (ML20244B914)
- ML20244B915 + (ML20244B915)
- ML20244B917 + (ML20244B917)
- ML20244B918 + (ML20244B918)
- ML20244B921 + (ML20244B921)
- ML20244B922 + (ML20244B922)
- ML20244B924 + (ML20244B924)
- IR 05000445/1989015 + (ML20244B925)
- ML20244B926 + (ML20244B926)
- ML20244B927 + (ML20244B927)
- ML20244B928 + (ML20244B928)
- B13264, Forwards Revised Preliminary Analysis Summary Re Pressurizer Surge Line Thermal Stratification,Per NRC Bulletin 88-011. NDE Insp History Demonstrates Present Day Integrity of Westinghouse PWR Pressurizer Surge Lines + (ML20244B930)
- ML20244B933 + (ML20244B933)
- ML20244B937 + (ML20244B937)
- 05000336/LER-1989-006, :on 890510,operator Attention Drawn to Trouble Rept Associated W/Valve 1-EB-91.Also on 890516,determined That Unit Operated Outside Tech Specs 3.6.3.1 Requirements. Caused by Personnel Error.Operators Instructed + (ML20244B939)
- ML20244B940 + (ML20244B940)
- ML20244B941 + (ML20244B941)
- ML20244B942 + (ML20244B942)
- ML20244B943 + (ML20244B943)
- ML20244B947 + (ML20244B947)
- ML20244B948 + (ML20244B948)
- ML20244B950 + (ML20244B950)
- ML20244B952 + (ML20244B952)