Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20237A470 + (ML20237A470)
- 05000369/LER-1987-026-02, :on 871105,control Area Ventilation & Chilled Water Sys Train a Declared Inoperable.Caused by Degradation of Control Room Door Seals & Mgt Deficiency.Seals Repaired & Preventive Maint Program to Be Established + (ML20237A471)
- IR 05000267/1987031 + (ML20237A472)
- ML20237A475 + (ML20237A475)
- ML20237A476 + (ML20237A476)
- ML20237A478 + (ML20237A478)
- TXX-7077, Interim Deficiency Rept CP-87-64 Re Potentially Reportable Item Involving Pressure Relieving Capacity of Tornado Venting Devices on Units 1 & 2.Initially Reported on 870824. Analysis Continuing.Next Rept Will Be Submitted by 880202 + (ML20237A479)
- ML20237A480 + (ML20237A480)
- IR 05000482/1987030 + (ML20237A481)
- ML20237A485 + (ML20237A485)
- ML20237A487 + (ML20237A487)
- IR 05000395/1987033 + (ML20237A488)
- ML20237A489 + (ML20237A489)
- ML20237A490 + (ML20237A490)
- IR 05000413/1987030 + (ML20237A491)
- ML20237A492 + (ML20237A492)
- ML20237A493 + (ML20237A493)
- ML20237A495 + (ML20237A495)
- 05000370/LER-1987-019-03, :on 871105,main Turbine & Reactor Tripped Due to lo-lo Level in Steam Generator 2B.Caused by Personnel Error.Safety Review Performed of Ns HX Cleaning Process.W/ + (ML20237A497)
- ML20237A499 + (ML20237A499)
- ML20237A502 + (ML20237A502)
- TXX-7076, Interim Deficiency Rept CP-87-102 Re Potential Conflict Between Cable Tray Installations & Design Requirements for Cable Tray Separations.Initially Reported on 870722. Evaluation Continuing.Next Rept Will Be Submitted by 880309 + (ML20237A503)
- ML20237A504 + (ML20237A504)
- ML20237A508 + (ML20237A508)
- ML20237A510 + (ML20237A510)
- ML20237A511 + (ML20237A511)
- ML20237A516 + (ML20237A516)
- ML20237A517 + (ML20237A517)
- TXX-7072, Interim Deficiency Rept CP-86-08 Re Installation of Super Hilti Kwik Bolts.Initially Reported on 870205.Evaluation Continuing.Next Rept Will Be Submitted by 880224 + (ML20237A519)
- NRC-87-0228, Monthly Operating Rept for Nov 1987 + (ML20237A520)
- IR 07100012/2011015 + (ML20237A521)
- BSEP-98-0143, Forwards Addl Info Re Actual Safety Factors Associated W/Cooldown Event,Per Discussions W/Nrc Re Reactor Pressure Vessel Fracture Toughness Evaluation.W/Evaluation + (ML20237A522)
- ML20237A523 + (ML20237A523)
- ML20237A524 + (ML20237A524)
- BSEP-98-0108, Withdraws Two ISI Relief Requests, & 0703,re temporary,non-Code Repair of SW Piping for Bsep,Unit 1. Repairs Were Completed During Refueling Outage 11.W/copy of Form NIS-2A, Repair/Replacement Certification Record + (ML20237A526)
- IR 05000353/1987014 + (ML20237A527)
- ML20237A529 + (ML20237A529)
- 05000267/LER-1987-027, :on 871111,reactor Scram Logic Actuated W/ Reactor Shutdown & All Control Rods Fully Inserted in Core. Caused by Electrical Noise Induced Into Wide Range Channels IV & V.Review Identified No Cause of Noise + (ML20237A530)
- 05000267/LER-1987-026, :on 871111,loss of Instrument Bus 2 Resulted in Scram Actuations.Caused by Low Trip Setting on Backup Power Supply Breaker.Transformer in Battery Charger 1B Replaced & Overcurrent Trip Setting Raised + (ML20237A532)
- ML20237A533 + (ML20237A533)
- ML20237A535 + (ML20237A535)
- JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant + (ML20237A537)
- ML20237A541 + (ML20237A541)
- IA-87-784, Final Response to FOIA Request for Documents.No Agency Records Subj to Request Located + (ML20237A542)
- ML20237A542 + (ML20237A542)
- TXX-7056, Final Deficiency Rept CP-87-73 Re Unsound Concrete Mortar at Const Joints.Initially Reported on 870824.Nonconformance Repts C-86-200154 & C-85-101580 Dispositioned to Replace Grout & Rework Affected Areas at Listed Locations + (ML20237A543)
- TXX-7079, Interim Deficiency Rept CP-87-103 Re Cracked Cast Bronze Sector Gears Used in Limitorque HBC-3 Valve Drives.Initially Reported on 870911.Evaluation Continuing.Next Rept Will Be Submitted by 880216 + (ML20237A544)
- BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station + (ML20237A545)
- ML20237A546 + (ML20237A546)
- ML20237A547 + (ML20237A547)
- RBG-27107, Forwards Affidavit & Corrections to Identifying Changes in Initial Update of FSAR + (ML20237A548)