Summary of 980730 Telcon W/Doe/Ru Re Briefing on Visit W/ a Trimble,Re Startuo Procedures at Sellafield,Transition issues,980813 Telcon & Integrated SER
ML20237A485
Person / Time
Site: 07003091
Issue date: 08/04/1998
From: Hoadley D
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9808140119
Download: ML20237A485 (3)


Text

. _ _ _ _ _. _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _

1 k

  • r g

lf August 4,1998 MEMORANDUM FOR: File 1

THRU:

Michael Tokar, Section Chief

/m TWRS Section i

Special Projects Branch, FCSS/NMSS I

FROM:

D.A. Hoadley, Licensing Assistant TWRS Section i

Special Projects Branch, FCSS/NMSS

SUBJECT:

MINUTES OF JULY 30,1998 TELECONFERENCES WITH DOE /RU The following members of the TWRS Section, FCSP, were in attendance for the July 30,1998, teleconference with DOE /RU:

Nick Baker Amy Bryce Lydia Chang Gary Comfort Amy Hoadley Steve Koenick Rob Lewis Walt Pasciak Jack Spraul M. Srinivasan Richard Struckmeyer Mike Tokar Robert Pierson i

DOE members and their contractors in attendance were:

Clark Gibbs Rob Barr George Kalman Lewis Miller o

Hriefing nn Visit nf Dr Andy Trimble IIK Nuclear Inst 2112tinndnsnectnrate l

+ Nick Baker gave a brief summary of Dr. Trimble's visit with staff on July 20th at NRC Headquarters hnd the following trip on July 21-22, to the Savannah River Site where they toured the Defense Waste Processing Facility and observed GTS Duratek melter and cleanup operations at the M Tank Farm. On July 23-24, staff also accompanied Dr. Trimble to the l

West Valley Demonstration Project.

l Mr. Baker also provided information on the differences in the " licensing" program of the UK versus NRC's regulations and policies. Some of the differences mentioned were:

UK does not have resident inspectors, but they do have principal inspectors assigned to I ()

specific sites / facilities.

j i

UK's authority goes beyond radiological and assumes jurisdiction over, what in the US, would be considered OSHA territory.

(

, 0)

Y'N 9808140119 900804 7

PDR ADOCK 07003091

b. 8 b } 6 j c

eDn

l

-g Memo to File 2-0 Reart ifn Prneadures at RallnHeld

+ Doe is sending three people in September and may send another three people in March 1999 to watch the start up procedures of BNFL's expanded production line. NRC would like to make the March 1999 trip a combined US interagency trip and send three people also. It was agreed that this was a good idea and details would be worked out at a later time.

o Traneitinn Teen c

+ C. Gibbs stated that he would try to review and approve 10 of the transition issues that NRC has provided input on this week and forward them to NRC for review.

o Ai-st t'4 1002 Talacanfaranc, -- Tnnient um,vina

+ 'Ihis will be a Topical Meeting to discuss process, meeting protocols, preparation for future meetings, future schedules for meetings.

+ Walt Pasciak will coordinate teleconference anangements and advise Headquarters staff regarding the arrangements.

+ There was discussion that NRC, DOE, and BNFL often use the same terminology to mean different things. 'Ihis needs to it resolved in the future at a topical meeting and a listing of definitions may need to be prepared. This will be discussed again in more depth.

o Intearnted Rnfetv Fvninntinn Rennrt

+ George Kalman brought up the sebject again regarding a combined DOE /NRC integrated safety evaluation report. Bob Pierson stated that since we were working under the present MOU, this was not a possibility and that maybe a transitional issue should be prepared addressing this topic.

+ Both George Kalman and Clark Gibbs felt that this was an important issue and that some other option needed to be found m expedite a remlution. George Kalman will be providing some options during the next conference call.

cc: R. Pierson, FCSP E. Ten Eyck, FCSS W. B. Brach, FCSS TWRS Section Staff

Yl e

t Memo to File o Rturt fin Prncedurer nt Re11mfield

+ Doe is sending three people in September and may send another three people in March 1999 to watch the start up procedures of BNFL's expanded production line. NRC would like to make l

the M3rch 1999 trip a combined US interagency trip and send three people also. It was l

agreed that this was a good idea and details would be worked out at a later time.

o Trnncitinn Iccuec

+ C. Gibbs stated that he would try to review and approve 10 of the transition issues that NRC has provided input on this week and funvard them to NRC for review.

o Anonct11 100R Teleennferener.. Tnnics1 Meeting

+ This will be a Topical Meeting to discuss process, meeting protocols, preparation for future meetings, future schedules for meetings.

+ Walt Pasciak will coordinate teleconference arrangements and advise Headquarters staff regarding the arrangements.

+ There was discussion that NRC, DOE, and BNFL often use the same terminology to mean different things. This needs to be resolved in the future at a topical meeting and a listing of definitions may need to be prepared. This will be discussed again in more depth.

O Irtearnted Knfetv Evninntion Rennrt

+ George Kalman brought up the subject again regarding a combined DOE /NRC integrated safety evaluation report. Bob Pierson stated that since we were working under the present MOU, this was not a possibility and that maybe a transitional issue should be prepared addressing this topic.

+ Both George Kalman and Clark Gibbs felt that this was an important issue and that some other option needed to be found to cxpedite a resolution. George Kalman will be providing some options during the next conference call.