Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235Z329 + (ML20235Z329)
- ML20235Z331 + (ML20235Z331)
- 05000483/LER-1987-027, :on 870916,essential Svc Water (ESW) Train a Valve Not Tested Per Tech Spec Allowable Extension Date. Caused by Programmatic Deficiency.Design Change Developed to Correct Clogging of ESW Supply Lines + (ML20235Z333)
- ML20235Z335 + (ML20235Z335)
- ML20235Z336 + (ML20235Z336)
- ML20235Z341 + (ML20235Z341)
- ML20235Z343 + (ML20235Z343)
- ML20235Z345 + (ML20235Z345)
- ML20235Z346 + (ML20235Z346)
- ML20235Z348 + (ML20235Z348)
- ML20235Z350 + (ML20235Z350)
- ML20235Z351 + (ML20235Z351)
- ML20235Z353 + (ML20235Z353)
- ML20235Z354 + (ML20235Z354)
- ML20235Z355 + (ML20235Z355)
- ML20235Z358 + (ML20235Z358)
- NLS8700519, Comments on Anl 851003-04 Plant Visit Summary Re Control Room Ventilation Sys.Change to Updated SAR Will Be Processed to More Accurately Describe Fact That Damper AD 1021-02 Will Remain Open & Butterfly Valve Will Close + (ML20235Z359)
- ML20235Z362 + (ML20235Z362)
- ML20235Z363 + (ML20235Z363)
- ML20235Z364 + (ML20235Z364)
- ML20235Z366 + (ML20235Z366)
- ML20235Z369 + (ML20235Z369)
- 05000424/LER-1987-056, :on 870916,cumulative Dose Calculations Program for Gaseous Effluent Releases to Atmosphere for Radioiodines Did Not Include I-133.Caused by Software Package Failure to Include I-133.Package Corrected + (ML20235Z370)
- ML20235Z372 + (ML20235Z372)
- 05000265/LER-1988-029, :on 881214,determined That Calibr of Level Indicator Not Completed & on 890105,determined That Source Range Monitor Indicators Did Not Have Surveillance Procedures.Caused by Inadequate Procedures + (ML20235Z373)
- ML20235Z375 + (ML20235Z375)
- ML20235Z376 + (ML20235Z376)
- ML20235Z377 + (ML20235Z377)
- ML20235Z378 + (ML20235Z378)
- ML20235Z386 + (ML20235Z386)
- ML20235Z387 + (ML20235Z387)
- ML20235Z389 + (ML20235Z389)
- ML20235Z390 + (ML20235Z390)
- ML20235Z393 + (ML20235Z393)
- ST-HL-AE-2951, Notifies of Intention Not to Install All High Density Spent Fuels Racks in Spent Fuel Pools at Present Time.Sketch Showing Rack Installation Plan in Spent Fuel Pool Attached + (ML20235Z397)
- ML20235Z402 + (ML20235Z402)
- ML20235Z407 + (ML20235Z407)
- ML20235Z408 + (ML20235Z408)
- ML20235Z409 + (ML20235Z409)
- PNO-I-87-095, on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans + (ML20235Z411)
- ML20235Z414 + (ML20235Z414)
- ML20235Z416 + (ML20235Z416)
- ML20235Z421 + (ML20235Z421)
- ML20235Z422 + (ML20235Z422)
- ML20235Z423 + (ML20235Z423)
- ML20235Z426 + (ML20235Z426)
- ML20235Z428 + (ML20235Z428)
- NRC-87-0203, Forwards Revised Attachment 1 to Relief Request PR-10-R2 Re Alternative Vibration Acceptance Criteria for HPCI Pump Until Replacement of Booster Pump Impeller Scheduled for First Refueling Outage + (ML20235Z433)
- ML20235Z435 + (ML20235Z435)
- ML20235Z436 + (ML20235Z436)
- ML20235Z437 + (ML20235Z437)