VALLECITOS BOILING WATER REACTOR l

(DEACTIVATED) l

\\

ANNUAL REPORT NO. 24 LICENSE DPR-1 DOCKET 50-18 NUCLEAR OPERATIONS e GENERAL ELECTRIC COMPANY VALLECITOS NUCLEAR CENTER, PLEASANTON, CALIFORNIA 94566 1

u r = m m 1.

/

R PDC

l l

VALLECITOS BOILING WATER REACTOR (DEACTIVATED)

ANNUAL REPORT NO. 24 i

The status of the Vallecitos Boiling Water Reactor (VBWR) during the calendar year of 1988 is described in this twenty-fourth report of the deactivated facility in conformance with License DPR-1, Docket 50-18, Amendment 19, Paragraph 5.d.2.

h I.

SUMMARY

The facility remained essentially in a static condition as described in Annual Report No. 23.

Entry into the containment building was made for routine radiation surveys and for a check of general conditions throughout the building to verify the unchanged condition of the facility.

The reactor vessel water level was monitored and remained essentially constant.

II.

STATUS OF THE FACILITY A.

Containment Buildinn No changes were made during the report period.

B.

General Systems No changes were mado during the report period.

III.

PERIODIC INSPECTIONS The annual air samples and radiation and contamination surveys of the containment building are given in Table 1 of this report.

The levels shown are representative and are not necessarily maximums.

IV.

RADIATION AND CONTAMINATION

~

Radiation and contamination surveys of the facility indicate the levels in all cases were well below the limits for any safety concern.

1

4 f

VBWR Annual Report No. 24

.i V.

ORGANIZATION There were no changes in organization.

l VI.

CONCLUSION The' deactivated Vallecitos Boiling Water Reactor continues to be maintained in a safe condition, commensurate with its shut down status.

The methods of inspection and control of safety-related items ensure maximum protection for the public and the General Electric Company.

GENERAL ELECTRIC COMPANY Irradiati n rocessing a/

By

/ W. Titus, Manager Reactor Operations & Support Services 2

VBWR. Annual Report No. 24 4:

TABLE 1.

RADIATION AND CONTAMINATION REPORT l

Contamination Levels Radiation Surface Smears Airborne l

Levels Beta-Gamma **

Beta-Gamma (mR/h Gamma)

(com/ft2 x los)

(nCi/cc x 10-10)

' Reactor Enclosure 12/87 10/88 12/82 10/88 12/87 10/88 Main Floor 1.

General

<1

<1 0.5 0.8 0.086*

0.012 2.

Top of Spent Fuel Pit Cover

<1

<1 0.3 0.6 0.029*

0.036 Reactor Basement 1.

Upper Level, Field 10 10 2.

West Ladder, Bottom 20 5

10.0 2.0 3.

East Ladder, Bottom 5

5 5.0 4.0 0.210*

0.10 4.

Between Recirculation Pumps 20 15 (2 ft. off deck)

Enclosure Stack - Outside Surface

<1

<1 Main Valve Pit Lines and Valves

<1

<1 N/A indicates readings not taken or not analyzed.

  • 24-hour decay.
    • For conversion to dpm, assume an instrument efficiency of 20%.

HQIE: Radiation levels, surface smears, and air samples may vary from survey to survey as they are taken in general areas rather than at specific locations.

3

p;r-(

1 3

GE Nuclear Energy :

V 1

General Electn: Cornpany

_f i.

Vallectus Nuclear Cenrer l

l PO Box 460 Vallectros Road Pleasanton, CA 94566 March.6, 1989 U..S.

Nuclear Regulatory Commission Washington, D.C.-

20555 Attention: -Document' Control Desk

Reference:

- License DPR-1,. Docket 50 '

Gentlemen:

- Enclosed. are, three signed copies of Annual Report, No.: 2'4 for-the Vallecitos.-Boiling. Water Reactor'(deactivated).

. Sincerely, l

[

G. E.

Cunn ngham Senior Licensing Engineer (415) 862-4330

/ca-Enclosures o \\