- _ - _ -

r . .

Alab;m2 Power Company

. ' 600 North 18th Street Post Office Box 2641

, Birmingham, Alabama 352914400 Telephone 2052501837 W. G. Hairston,Ill Senior Vice President Nuclear Operations Alabama Power the southem electrc system 10CFR50.55a(g)

February 8, 1989  !

I Docket No. 50-364 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Vashington, D. C. 20555 Gentlemen:

Joseph H. Farley Nuclear Plant - Unit 2 i Request for Relief From Certain Requirements l of 10CFR50.55a(g)

By letter dated August 31, 1988, the NRC approved updating the Inservice l Inspection (ISI) Program for Joseph H. Farley Nuclear Plant, Unit 2 to the J 1983 Edition through the Summer 1983 Addenda of the ASME Code,Section XI.

This letter also stated that these later Code requirements were to be implemented during the Unit 2 sixth refueling outage scheduled for March j 1989. The updated ISI Program was submitted to the NRC by letter dated l December 15, 1988.

As a part of the review process for granting specific relief requests, the l

NRC verbally requested a list of the ISI reliefs which vill be required for

! the Unit 2 sixth refueling outage. A list of these requests is included in l the attachment. If there are any questions, please advise.

I Respectfully submitted, f

yjA./L.'t- f V. G. 51airston, III l

VGH/DEH/ CDP-cht:8.37 ,

1 l Attachment l

cc: Mr. H. L. Ernst Mr. E. A. Reeves Ogry Mr. G. F. Maxwell Il 0$$N$y8ggQ l PDC

['y,

, ]

8

.% i

  • ., , ATTACHMENT 1'

E Relief Requests Required for the Unit 2 Sixth Refueling Outage '

k.* .  ;

L Relief Request No Examination Area RR-l' Material requirements for calibration blocks used

'for ultrasonic examination of. heavy vall vessels.

RR-2' Di nensional requiremen"ts for calibration blocks used for ultrasonic examination of the reactor vessel.

RR-4 ' Ultrasonic examination of piping systems and thin vall vessels.

RR-5 Dimensional differences between the' calibration

. blocks used for examination of piping systems and thin vall vessels and the components to be examined.

RR-6 Material' requirements for calibration blocks used for ultrasonic examination of piping systems and thin vall vessels.

RR-7 Dimensional requirements for calibration notches placed on calibration blocks used for ultrasonic examination of piping systems and thin vall vessels.

RR-9 Volumetric examination of nozzle-to-vessel velds in the pressurizer.

RR-10 Volumetric examination of nozzle-to-safe end welds in steam generators.

RR-11 Volumetric examination of nozzle inner radius section for steam generators.

RR-12 Delete VT-4 visual examination method and redefine VT-3 visual examination requirements in accordance with paragraph IVA-2213 of ASME Section XI, 1986 Edition.

RR-16 Visual examination of the internal pressure boundary surfaces of Class 1 valves.

RR-17 Reference system for all velds and areas subject to  !

volumetric and surface examination, i RR-18 Volumetric examination of pressure retaining velds in the regenerative heat exchanger.

l 1

r ,

_Y J1 . -< 1 ATTACHMENT

1. .

h' l

Relief Requests Requiredffor the Unit 2 Sixth Refueling Outage c

RR-24 Hydrostatic testing of the relief-line discharge '

headers lto the pressurizer relief tank-(line No.

HCB-62).-

RR-28 Volumetric examination of the nozzle inside radius -

section of the steam outlet nozzle on steam generators.

RR-29 Hydrostatic testing of boron injection-recirculation discharge piping.(line No. CCB-62).

RR-31 Visual (VT-2) examination for leakage of Class 3 service' vater pumps.

RR-32 Visual (VT-2) examination for leakage in encased piping in spent fuel pool cooling system.

RR-33, Hydrostatic testing of' portions of Class 3 piping and components which operate continuously during all modes of plant operation.

l RR-35 Hydrostatic testing of Class 3 buried piping in the  !

service water' system. 1 RR-37 Visual (VT-2) examination of condenser coils (tubes) in Class 3 coolers.

RR-38 Hydrostatic testing of Class 3 portions of  :

auxiliary steam piping.

RR-39 Hydrostatic testing of Class 3 auxiliary feedvater pump minimum flow piping.

RR-41 Break away drag test for hydraulic snubbers.

RR-42 Additional sample testing requirements for snubbers.

RR-44 Operational monitoring of the Class 3 spent fuel pool cooling heat exchangers.