Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217F826 + (ML20217F826)
- ML20217F827 + (ML20217F827)
- ML20217F828 + (ML20217F828)
- ML20217F829 + (ML20217F829)
- ML20217F830 + (ML20217F830)
- ML20217F831 + (ML20217F831)
- 05000255/LER-1998-005, :on 980217,actuation of Containment Isolation Occurred.Caused by Inadvertent Containment High Radiation Signal.Plant Status Evaluated & Equipment Lineups Restored + (ML20217F832)
- ML20217F835 + (ML20217F835)
- ML20217F836 + (ML20217F836)
- ML20217F837 + (ML20217F837)
- ML20217F838 + (ML20217F838)
- 05000373/LER-1997-032, :on 970904,failure to Comply W/Ts Action Statement Was Determined.Caused by non-conservative Maintenance Planning.Dg 1A Control Room Frequency Meter Was Replaced + (ML20217F839)
- PLA-4645, Confirms That Payment of Civil Penalty in Amount of $210,000 Has Been Made by Electronic Transfer + (ML20217F840)
- ML20217F843 + (ML20217F843)
- IR 05000346/1999010 + (ML20217F845)
- ML20217F846 + (ML20217F846)
- ML20217F847 + (ML20217F847)
- NRC-98-0049, Submits Total Amount of Property Damage & Decontamination Coverage in Effect for Fermi 2,as Detailed Under Reporting Requirements of 10CFR50.54(w) + (ML20217F848)
- ML20217F849 + (ML20217F849)
- ML20217F850 + (ML20217F850)
- ML20217F851 + (ML20217F851)
- ML20217F852 + (ML20217F852)
- ML20217F854 + (ML20217F854)
- ML20217F855 + (ML20217F855)
- ML20217F857 + (ML20217F857)
- ML20217F860 + (ML20217F860)
- LIC-98-0039, Forwards Response to GL 97-06, Degradation of Steam Generator Internals + (ML20217F861)
- ML20217F862 + (ML20217F862)
- ML20217F865 + (ML20217F865)
- ML20217F867 + (ML20217F867)
- ML20217F869 + (ML20217F869)
- ML20217F870 + (ML20217F870)
- ML20217F872 + (ML20217F872)
- IA-97-148, First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Being Made Available in PDR + (ML20217F873)
- ML20217F873 + (ML20217F873)
- ML20217F877 + (ML20217F877)
- B16674, Informs That Encl Rev 23 to Mnps Emergency Plan Was Implemented in Aug 1997.Complete Summary of Plan Changes Contained in Attachment 1.Commitment Made by Util,Listed + (ML20217F878)
- ML20217F879 + (ML20217F879)
- ML20217F880 + (ML20217F880)
- ML20217F883 + (ML20217F883)
- ML20217F884 + (ML20217F884)
- ML20217F885 + (ML20217F885)
- ML20217F887 + (ML20217F887)
- ML20217F888 + (ML20217F888)
- ML20217F890 + (ML20217F890)
- ML20217F891 + (ML20217F891)
- U-602984, Forwards 98-014-00,re Design Fatigue Analysis for Feedwater Piping Does Not Match Fatigue Analysis Feedwater Nozzles Resulting in Condition.Encl Rept Contains Listed Commitments + (ML20217F893)
- ML20217F894 + (ML20217F894)
- ML20217F896 + (ML20217F896)
- BSEP-98-0062, Suppl to Application for Amend to DPR-71,revising Safety Limit Min Critical Power Ratio Ref in TS 2.1.2 from 1.10 to 1.09 for Two Recirculation Loop Operation & to 1.10 for Single Recirculation Loop Operation for Fuel Cycle 12 + (ML20217F900)
- LIC-98-0061, Forwards Response to Violations Noted in Insp Rept 50-285/98-02 on 980209-13.Corrective Actions:Documentation Relative to Qualification of Lead Auditor Completed & Audits Reviewed for Adequacy W/No Discrepancies + (ML20217F902)