Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217E209 + (ML20217E209)
- ML20217E210 + (ML20217E210)
- ML20217E211 + (ML20217E211)
- ML20217E214 + (ML20217E214)
- ML20217E218 + (ML20217E218)
- 05000266/LER-1997-043-01, Forwards LER 97-043-01,re Discovery That TS Surveillance of Reactor Trip Sys Interlocks Were Not Adequate. Supplemental Info Is Provided at End of Rept.Previous Commitments Made within Rept Also Encl + (ML20217E221)
- ML20217E222 + (ML20217E222)
- ML20217E223 + (ML20217E223)
- ML20217E226 + (ML20217E226)
- ML20217E232 + (ML20217E232)
- ML20217E236 + (ML20217E236)
- ML20217E239 + (ML20217E239)
- ML20217E241 + (ML20217E241)
- PNO-IV-99-043, on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects Observed + (ML20217E242)
- ML20217E246 + (ML20217E246)
- ML20217E248 + (ML20217E248)
- ML20217E252 + (ML20217E252)
- PNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph + (ML20217E253)
- ML20217E255 + (ML20217E255)
- ML20217E257 + (ML20217E257)
- ML20217E258 + (ML20217E258)
- ML20217E260 + (ML20217E260)
- ML20217E261 + (ML20217E261)
- ML20217E262 + (ML20217E262)
- ML20217E264 + (ML20217E264)
- ML20217E268 + (ML20217E268)
- ML20217E269 + (ML20217E269)
- ML20217E272 + (ML20217E272)
- ML20217E273 + (ML20217E273)
- ML20217E274 + (ML20217E274)
- 3F0398-18, Responds to NRC Re Violations Noted in Insp Rept 50-302/97-12.Corrective Actions:Review of EOPs Was Conducted to Identify Actions to Be Performed by Support Organizations + (ML20217E276)
- ML20217E279 + (ML20217E279)
- 05000293/LER-1998-003, :on 980220,discovered That RBCCW & Tbccw Heat Exchanger Supports Outside Design Basis Seismic Requirements.Caused by Calculation Error.Reviewed Similar Calculations & Counseled Individuals Associated W/Errors + (ML20217E283)
- IA-99-280, Final Response to FOIA Request for Documents.Records Subj to Request Encl & Identified in App C + (ML20217E284)
- ML20217E284 + (ML20217E284)
- ML20217E285 + (ML20217E285)
- NG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With + (ML20217E290)
- ML20217E292 + (ML20217E292)
- ML20217E293 + (ML20217E293)
- 05000454/LER-1998-004-01, :on 980228,determined That Plugged Drain in Reactor Incore Instrumentation Seal Table Room Had Not Been Properly Evaluated.Caused by Inadequate Written & Oral Communications.Temporary Alteration Installed + (ML20217E294)
- ML20217E296 + (ML20217E296)
- ML20217E299 + (ML20217E299)
- ML20217E300 + (ML20217E300)
- ML20217E302 + (ML20217E302)
- ML20217E303 + (ML20217E303)
- ML20217E304 + (ML20217E304)
- ML20217E305 + (ML20217E305)
- ML20217E306 + (ML20217E306)
- JAFP-98-0137, Provides Rev to 980225 Response to NRC Re NOV from Insp Rept 50-333/97-08 on 971027-1221.Corrective Actions:Performed Root Cause Evaluation + (ML20217E309)
- ML20217E312 + (ML20217E312)
- ML20217E313 + (ML20217E313)