Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215L436 + (ML20215L436)
- ML20215L437 + (ML20215L437)
- IA-86-685, Closes Allegation RI-85-A-0012 Re Milestone Schedules Causing Poor Work Procedures & QC Omissions.Allegations of Unauthorized Changes to Engineering Spec & Improper Torquing of Switchgear Fasteners Unsubstantiated + (ML20215L439)
- ML20215L439 + (ML20215L439)
- ML20215L440 + (ML20215L440)
- TXX-6387, Suppls Response to Violations Noted in Insp Repts 50-445/86-06 & 50-446/86-04.Corrective Actions:Rev 7 to B&R Const Installation Procedure EEI-7, Cable Pulling, Revised to Incorporate Requirements of DCA + (ML20215L441)
- ML20215L443 + (ML20215L443)
- IR 05000213/1987014 + (ML20215L444)
- ML20215L445 + (ML20215L445)
- ML20215L446 + (ML20215L446)
- ML20215L448 + (ML20215L448)
- ML20215L449 + (ML20215L449)
- ML20215L453 + (ML20215L453)
- ML20215L455 + (ML20215L455)
- ML20215L456 + (ML20215L456)
- TXX-6441, Notification of 870519 Meeting in Glen Rose,Tx W/Cygna,S&W, Impell Corp & Ebasco Svcs,Inc in Glen Rose,Tx to Discuss Electrical & Mechanical Issues,Instrumentation & Control Issues & Civil/Structural Issues + (ML20215L457)
- ML20215L459 + (ML20215L459)
- 05000387/LER-1986-033, :on 860925,door Latch Stuck Due to Being Dirty. Door Latch Removed,Cleaned & Reinstalled.Limiting Condition for Operation Statement 3.0.3 Cleared When Door Returned to Svc + (ML20215L460)
- ML20215L461 + (ML20215L461)
- ML20215L462 + (ML20215L462)
- ML20215L464 + (ML20215L464)
- ML20215L465 + (ML20215L465)
- IR 05000282/1987003 + (ML20215L467)
- 3F1086-20, Responds to 861009 Request for Addl Info Re Tech Spec Change Request Increasing High Pressure Reactor Trip Setpoint. Higher Setpoint Combined W/Increased Anticipatory Reactor Trips Will Not Increase Challenges to Safety Valves + (ML20215L468)
- ML20215L470 + (ML20215L470)
- ML20215L471 + (ML20215L471)
- ML20215L472 + (ML20215L472)
- ML20215L473 + (ML20215L473)
- W3P86-3379, Forwards Response to Request for Addl Info Re Tech Spec Change Requests to Implement Bypass for nonsafety-related High Speed Generator Level Trip & to Support Cycle 2 Operation + (ML20215L476)
- ML20215L477 + (ML20215L477)
- IR 05000369/1987004 + (ML20215L479)
- ML20215L480 + (ML20215L480)
- ML20215L481 + (ML20215L481)
- ML20215L482 + (ML20215L482)
- ML20215L487 + (ML20215L487)
- 3F0587-02, Submits Addl Info Re NUREG-0737,Item II.E.1.1, Emergency Feedwater Sys Review, Per NRC 870331-0402 Meeting Request + (ML20215L488)
- ML20215L491 + (ML20215L491)
- ML20215L492 + (ML20215L492)
- ML20215L494 + (ML20215L494)
- ML20215L497 + (ML20215L497)
- ML20215L498 + (ML20215L498)
- 05000155/LER-1987-006-01, :on 861104,EEQ Insp Rept Identified Unresolved Item Re Qualification of Rubber Insulated Cables.Caused by Inadequate File Documentation Showing Cable Similarity. Outage Initiated 870331 + (ML20215L499)
- ML20215L504 + (ML20215L504)
- ML20215L505 + (ML20215L505)
- ML20215L506 + (ML20215L506)
- ML20215L507 + (ML20215L507)
- AECM-87-0109, Forwards Revised Response to Request 9 Re Proposed ATWS Design.Sodium Pentaborate Concentration Clarified in Revised Response to Be Weight Percent & Min Flow Rate Test Pressure Changed to 1,300 Psig Due to Calculations Being Finalized + (ML20215L508)
- ML20215L509 + (ML20215L509)
- ML20215L510 + (ML20215L510)
- BECO-87-090, Part 21 & Deficiency Rept Re Loose &/Or Missing Bolts in Hydraulic Control Unit (HCU) Support Frames of CRD Sys. Initially Reported on 870529.HCU Will Be Restored to Original Design & Bolts Inspected + (ML20215L514)
- PNO-V-87-034, on 870502,w/plant in Cold Shutdown for 16 Months,Licensee Began Planned 7-day Dual Train Decay Heat Sys Outage.Steam Generators Operable & Available for Dhr. Resident Inspectors Monitoring Outage + (ML20215L515)