o y--

NOTICE OF VIOLATION-1

' Northern States' Power Company Docket No. 50-282 Docket No.-50-306 As a ~ result of the inspection conducted on February 15 through April 18, 1987, and in accordance with the " General Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the following violation was identified:

Technical Specification 3.6, Containment System, A.1.' states,

" Containment system integrity as defined in Specification TS.1 shall not be violated except when one of the following conditions exist:

(a) the reactor is in the cold shutdown condition with the reactor vessel head installed, (b) the reactor is_in the refueling shutdown condition.with the vessel head removed, or (c) the fuel inside containment has not been used for power operation."

-.In addition,~ Technical Specification 1.0, C. states, in part, " Containment system integrity exists when the containment vessel, shield building, and

~ Auxiliary Building Special Ventilation Zone (ABSVZ) are closed and the following conditions are satisfied..

7.

At least one door in each shield building airlock is closed."

Contrary to the above, on March 3, 1987, both Unit I shield building maintenance airlock doors were found to be open with the reactor coolant temperature greater than 200 degrees F and none of the conditions of T.S. 3.6 above satisfied.

This is a Severity Level IV violation (Supplement 1).

-Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement (1) corrective action or explanation _ in reply, including)for-each violation:taken and the results achieve further violations; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

if 30 4 ')

//

/

Dated' W.4G.' GuldeW6nd, Chief 9 f

ProjectVBranch2 i

NES$N038886 PDR

+

-