ML20215L472
Text
_.
CD&L Carolina Power & Light Company SERIAL: NLS-86-366 05 S3 S l
Director of Nuclear Reactor Regulation Attention:
Mr. Dan Muller BWR Project Directorate #2 Division of BWR Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 IN-SERVICE TESTING PROGRAM
Dear Sir:
In accordance with the provisions set forth in 10 CFR 50.55a(g), Carolina Power & Light Company (CP&L) hereby submits the Interval 2 In-Service Testing Program (IST) for pumps and valves for the Brunswick Steam Electric Plant (BSEP), Unit Nos. I and 2 (see Attachments 1 and 2). The program conforms to the ASME Boiler and Pressure Vessel Code,Section XI,1980 Edition through the winter 1981 Addenda. The updated IST Program is applicable for the 120-month interval which began, for both units, on July 10, 1986.
In accordance with 10 CFR 50.55a, Paragraph g 5 (iv), exceptions from the ASME Boiler and Pressure Vessel Code requirements applicable to the first interval which CP&L found to be impractical and which have not yet been identified to the NRC are provided in.
Should you have any questions concerning this submittal, please contact Mr. Stephen D.
Floyd at (919) 836-6901.
Yoursgery tru A. B. Cutter - Vice sident Nuclear Engineering & Licensing ABC/ BAT /kts (5003 BAT) h0 Attachments cc:
Mr. W. H. Ruland (NRC-BNP)(Attachments 1 & 3)
Dr. J. Nelson Grace (NRC-RII)(Attachments 1 & 3)
Lt Mr. E. Sylvester (NRC)(2 Copies W/All Attachments)
,Y O
8610290058 861023
@ cA.o 9
PDR ADOCK 05000324 G
}W 411 Fayetteville Street e P O Box 1551
- Raleig N C 27602 m,_
m
ATTACHMENT 1 TO SERIAL NLS-86-366 BRUNSWICK UNIT NOS. 1 AND 2 INTERVAL 2 IST PROGRAM l
l t
l I
l l
l l
e (1152NEL)
/