ML20215L439

From kanterella
Jump to navigation Jump to search
Closes Allegation RI-85-A-0012 Re Milestone Schedules Causing Poor Work Procedures & QC Omissions.Allegations of Unauthorized Changes to Engineering Spec & Improper Torquing of Switchgear Fasteners Unsubstantiated
ML20215L439
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/11/1985
From: Linville J
NRC
To: Shropshire A
NRC
Shared Package
ML20215L413 List:
References
FOIA-86-685 NUDOCS 8610290036
Download: ML20215L439 (1)


Text

i JUL 111985 MEMORANDUM FOR:

A. Shropshire, Compliance and Investigations Coordinator FROM:

J. Linville, Chief, RPS 2C, DRP

SUBJECT:

CLOSE0VT OF ALLEGATION RI-85-A-0012 - MILESTONE SCHEDULES CAUSING P0OR WORK PRACTICES AND QC OMISSIONS l

This memo closes allegation RI-85-A-0012. The technical allegations of unauthorized changes to an engineering specification and improper torquing of switchgear fasteners were unsubstantiated as documented in attached inspec-tion report 50-410/85-13 and the licensee response to our request that the matter be investigated. The inspection report was forwarded to the alleger by the attached letter. Other pertinent documents in the file are also attached.

C es C. L nv111e, C actor Projects Section 2C cc:

,v R. Gram S. Collins l

A/6 8610290036 861022 PDR K86-5