Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN068701, Forwards Original Certificate of Insurance from ANI (Policy 5178,TA5217,X8786 & XTA5168) as Evidence of Primary Property Damage Insurance Coverage for Policy Yr 870401-880401 + (ML20215C532)
- ML20215C533 + (ML20215C533)
- ML20215C535 + (ML20215C535)
- TXX-5051, Interim Deficiency Rept CP-86-58 Re Drilling/Cutting of Reinforcing Steel in Fuel Handling Bldg.Unauthorized Cutting,Possibly Extending to Third Layer,Noted.Evaluation Continuing.Next Rept Anticipated by 861101 + (ML20215C538)
- ML20215C540 + (ML20215C540)
- ML20215C543 + (ML20215C543)
- ML20215C544 + (ML20215C544)
- ML20215C545 + (ML20215C545)
- ML20215C547 + (ML20215C547)
- ML20215C550 + (ML20215C550)
- ML20215C551 + (ML20215C551)
- ML20215C554 + (ML20215C554)
- ML20215C555 + (ML20215C555)
- TXX-6002, Final Deficiency Rept CP-86-15 Re Diesel Generator Controls. Initially Reported on 860314.Controls Reviewed by Tdi Under Owners Group Design Review & Quality Revalidation Program. Condition Not Reportable Per 10CFR50.55(e) + (ML20215C556)
- ML20215C557 + (ML20215C557)
- ML20215C558 + (ML20215C558)
- ML20215C563 + (ML20215C563)
- 05000341/LER-1987-017, :on 870513,south Reactor Feed Pump Turbine (Srfpt) Tripped Due to Apparent Srfpt High Pressure Casing Drain Valve Being Closed During Startup.Caused by Inadequate Procedure.Procedure Revised + (ML20215C565)
- ML20215C566 + (ML20215C566)
- ML20215C569 + (ML20215C569)
- PLA-2701, Monthly Operating Rept for Jul 1986 + (ML20215C571)
- ML20215C573 + (ML20215C573)
- ML20215C576 + (ML20215C576)
- ML20215C577 + (ML20215C577)
- ML20215C579 + (ML20215C579)
- ML20215C582 + (ML20215C582)
- ML20215C583 + (ML20215C583)
- ML20215C584 + (ML20215C584)
- ML20215C586 + (ML20215C586)
- ML20215C588 + (ML20215C588)
- TXX-6146, Interim Deficiency Rept CP-86-53 Re Seismic Design of Conduit.Initially Reported on 861021.Testing Program Schedule Delayed.Next Rept Expected by 870220 + (ML20215C589)
- ML20215C590 + (ML20215C590)
- IR 05000250/1986037 + (ML20215C591)
- ML20215C592 + (ML20215C592)
- PNO-III-86-143, on 861209,plant Shut Down Due to Discovery That 200 AMP Electrical Splices Supplied by GE May Not Meet Environ Qualification Requirements.Special Region III Insp Will Review Splice Problem & Licensee Corrective Action + (ML20215C593)
- ML20215C596 + (ML20215C596)
- ML20215C597 + (ML20215C597)
- ML20215C601 + (ML20215C601)
- ML20215C605 + (ML20215C605)
- ML20215C606 + (ML20215C606)
- ML20215C607 + (ML20215C607)
- ML20215C608 + (ML20215C608)
- ML20215C611 + (ML20215C611)
- ML20215C612 + (ML20215C612)
- ML20215C613 + (ML20215C613)
- ML20215C614 + (ML20215C614)
- ML20215C615 + (ML20215C615)
- ML20215C616 + (ML20215C616)
- ML20215C620 + (ML20215C620)
- ML20215C621 + (ML20215C621)
- ML20215C623 + (ML20215C623)