OPERATING DATA REPORT DOCKET NO. 50-245 DATE 8/12/86 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 X4400 OPERATING STATUS
~ 1.
Unit Name: Millstone Notes
- April report revised to 2.
Reporting Period: April (revised) show daylight savings time.
3.
Licensed Thermal Power (MWt): 2011 4.
Nameplate Rating (Gross MWe): 662 5.
Design Electrical Rating (Net MWe): 660 6.
Maximum Dependable Capacity (Gross MWo): 684 7.
Maximum Dependable Capacity (Net NWe): 654 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period
- 719
- 2879
- 135167 12.
Number Of Hours Reactor Was Critical ^719
^2844.3
^103923.1 13.
Reactor Reserve Shutdown Hours 0
0 2834.5 14.
Hours Generator On-Line
^719
-- ^2837.7
- 101026.9 15.
Unit Reserve Shutdown Hours 0
0 93.7
- 16. Gross Thermal Energy Generated (MWH) 1423115 5636653 186260851
- 17. Gross Elec. Energy Generated (MWH) 487300 1932500 62633796 18.
Net Electrical Energy Generated (MWH) 466371 1849019 59738791 19.
Unit Service Factor 100 98.6 74.7 20.
Unit Availability Factor 100 98.6 74.8 21.
Unit Capacity Factor (Using MDC Net)
- 99.2 98.2 67.6 22.
Unit Capacity Factor (Using DER Net)
- 98.3 97.3 67.0 23.
Unit Forced Outage Rate 0
1.4 12.1 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION 8610100327 860812 PDR ADOCK 0500 5