Revised Monthly Operating Rept for June 1986.Rept Revised to Correct Daylight Savings Time Hours from Apr Rept
ML20215C563
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/30/1986
From: Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20215C328 List:
References
NUDOCS 8610100343
Download: ML20215C563 (1)


Text

~n 4..'

-OPERATING DATA REPORT-i DOCKET NO. 50-245

-l DATE 8/12/86_

COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791' Ext. 4400 i

LOPERATING-STATUS 1.

_ Unit Name: Millstone 1 Note's

  • Revised June to' correct.

t L 2.~

Reporting Period: June (revised) daylight savings time hours from l 3.~

~ Licensed Thermal Power:(MWt): 2011 April report.

-. 4.

Nameplate Rating (Gross MWe)i T62 5.

- Design Electrical Rating (Net IEeT: -660 6.

Maximum Dependable Capacity (Gross MWiT: 684 7.

Maximum Dependable. Cap'acity (Net-MWe):'654-8.

If. Changes Occur-in' Capacity Ratingsa(Items Number.3 Through 7)'

Since Last Report,'Give~ Reasons:

N/A 9.

Power Level.To Which Restricted, If Any (Net MWe): N/A.

10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative

.11.

Hours In Reporting Period 720 4343

'136631-

'12.

_ Number. Of Hours Reactor Was Critical 720 4159.4 105238.2

13. -Reactor Reserve Shutdown Hours 0

148.9 2983.4 14.= -' Hours Generator On-Line 720 4119 102307.2 15.

Unit Reserve Shutdown Hours 0

183.7 277.4 16.-

Gross Thermal Energy Generated (MWH) 1419403 8159176 188773374 17.

Gross Elec. Energy Generated (MWH) _

481700 2789600 63490896 18.

Net Electrical Energy Generated (MWH) 458740 2667560 60557332-

' 19.

Unit Service Factor-100 94.8 74.9 20.

Unit Availability Factor 100 99.0 75.1 21.

Unit Capacity Factor (Using MDC Net) 97.4 93.9 67.8

22.. Unit Capacity Factor (Using DER Net) 96.5 93.0 67.2 23.

Unit Forced Outage Rate 0

0.9 12.0

-24.

Shutdowns Scheduled Over Next_6 Months.(Type, Date, and Duration of Each):

N/A

-25..If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL ~ CRITICALITY INITIAL ELECTRICITY N/A COMERCIAL OPERATION 8610100343 860812 ADOCK0500g5 PDR R