- ML20214T906 + (ML20214T906)
- IR 05000461/1986071 + (ML20214T909)
- 05000285/LER-1987-018, :on 870504,design Deficiencies of Valve Operator Sys for HCV-385 & HCV-386 Identified.Mod Completed & Valves Retested + (ML20214T911)
- ML20214T912 + (ML20214T912)
- ML20214T914 + (ML20214T914)
- ML20214T919 + (ML20214T919)
- ML20214T920 + (ML20214T920)
- ML20214T921 + (ML20214T921)
- 0CAN098605, Responds to Violations Noted in Insp Repts 50-313/86-21 & 50-368/86-22.Corrective Actions:Policy Document,Detailing Implementation of 10CFR50.59 Review Process W/Supporting Training Program,Developed + (ML20214T924)
- 05000278/LER-1986-022-02, :on 861030,manual Scram Occurred After Resin Injection.Caused by Resin Left in Demineralizer Outlet Plenum or Piping After Recent Filter Element Replacement. Maint Work Instructions Revised + (ML20214T926)
- ML20214T927 + (ML20214T927)
- AECM-86-0376, Final Deficiency & Part 21 Rept 4 Re Low Flow Condition Through Standby Svc Water (SSW) Pump A.Initially Reported on 820415.Procedures to Ensure That Min Pump Flow Provided When SSW Sys Automatically Started,Issued + (ML20214T931)
- IR 05000315/1986040 + (ML20214T933)
- ML20214T935 + (ML20214T935)
- IR 05000354/1987013 + (ML20214T937)
- ML20214T938 + (ML20214T938)
- B12353, Forwards Rev 3 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790) + (ML20214T940)
- AECM-86-0362, Forwards Rept of 10CFR50.59 Safety Evaluations,Jan-June 1986,Grand Gulf Nuclear Station, Discussing Changes,Tests & Experiments + (ML20214T942)
- ML20214T943 + (ML20214T943)
- ML20214T946 + (ML20214T946)
- ML20214T947 + (ML20214T947)
- ML20214T948 + (ML20214T948)
- ML20214T949 + (ML20214T949)
- ML20214T950 + (ML20214T950)
- ML20214T951 + (ML20214T951)
- ML20214T954 + (ML20214T954)
- TXX-6495, Interim Deficiency Rept CP-87-09 Re Terminal Studs in PK-2 Test Blocks.Initially Reported on 870507.Susceptibility to Stress Corrosion Due to Mfg Failure to Follow Required Mfg Processes.Next Rept Will Be Submitted by 870807 + (ML20214T958)
- ML20214T961 + (ML20214T961)
- ML20214T963 + (ML20214T963)
- ML20214T965 + (ML20214T965)
- ML20214T966 + (ML20214T966)
- ML20214T971 + (ML20214T971)
- ML20214T972 + (ML20214T972)
- ML20214T974 + (ML20214T974)
- ML20214T976 + (ML20214T976)
- ML20214T977 + (ML20214T977)
- ML20214T978 + (ML20214T978)
- ML20214T981 + (ML20214T981)
- 05000255/LER-1986-033, :on 860825,discovered That LPSI Pump P-67B Flow Did Not Meet FSAR Specs.Caused by Impeller Installed in Pump in 1983.Impeller Replaced.Performance Tests Indicate That Pump Now Satisfies FSAR Specs + (ML20214T983)
- ML20214T986 + (ML20214T986)
- IR 05000263/1986009 + (ML20214T987)
- ML20214T989 + (ML20214T989)
- ML20214T991 + (ML20214T991)
- ML20214T994 + (ML20214T994)
- ML20214T995 + (ML20214T995)
- ML20214T998 + (ML20214T998)
- IR 05000456/1986025 + (ML20214T999)
- BSEP-86-1657, Responds to Violations Noted in Insp Repts 50-324/86-25 & 50-325/86-24.Corrective Actions:Auxiliary Operator Involved Counseled to Ensure Understanding of Mandatory Procedure Compliance & Operating Procedure 39 Revised + (ML20214U000)
- ML20214U001 + (ML20214U001)
- ML20214U002 + (ML20214U002)
- ML20214U004 + (ML20214U004)