Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214S555 + (ML20214S555)
- ML20214S558 + (ML20214S558)
- ML20214S559 + (ML20214S559)
- ML20214S562 + (ML20214S562)
- ML20214S563 + (ML20214S563)
- ML20214S570 + (ML20214S570)
- ML20214S572 + (ML20214S572)
- ML20214S576 + (ML20214S576)
- ML20214S577 + (ML20214S577)
- 05000424/LER-1987-019, :on 870429,Train a Toxic Gas Monitor Actuated Resulting in Control Room Isolation.Cause for Actuation Indeterminate.Chlorine Gas Removed from Site.Toxic Gas Monitors Restored to Operation + (ML20214S580)
- ST-HL-AE-2234, Forwards Implementation Ltr Rept Re Preoperational Testing of Reactor Vessel Water Level Sys,Per NRC & Item II.F.2 of NUREG-0737.Preoperational Testing of Sys Complete & Test Results Available Onsite for NRC Review + (ML20214S582)
- W3P87-1069, Responds to Violations Noted in Insp Rept 50-382/87-07. Corrective Actions:Procedures ME-3-220 & MM-12-001 Will Be Revised to Delete Unnecessary Requirements + (ML20214S584)
- ML20214S586 + (ML20214S586)
- ML20214S595 + (ML20214S595)
- ML20214S602 + (ML20214S602)
- 3F0687-02, Requests Delay Until 870710 to Respond to Generic Ltr 87-06 Due to NRC Clarification of Definition of Pressure Isolation Valves + (ML20214S606)
- ML20214S610 + (ML20214S610)
- ML20214S612 + (ML20214S612)
- IR 05000412/1987044 + (ML20214S613)
- ML20214S614 + (ML20214S614)
- ML20214S618 + (ML20214S618)
- ML20214S621 + (ML20214S621)
- ML20214S626 + (ML20214S626)
- ML20214S628 + (ML20214S628)
- ML20214S631 + (ML20214S631)
- 05000382/LER-1987-012, On 870413,reactor Trip Occurred Due to Control Element Assembly Calculator (Ceac) 2 Mistakenly Removed for Test W/Ceac 1 Out of Svc.Caused by Inadequate Procedures. Procedures Reviewed & Revised + (ML20214S632)
- ML20214S633 + (ML20214S633)
- ML20214S634 + (ML20214S634)
- B12542, Proposed Tech Specs,Incorporating long-term Acceptance Criteria for Steam Generator Tubes W/Defects in Rolled Region + (ML20214S638)
- ML20214S642 + (ML20214S642)
- ML20214S645 + (ML20214S645)
- ML20214S647 + (ML20214S647)
- 05000219/LER-1987-023, :on 870430,while Performing Surveillance Testing of Reactor Protection Motor Generator Sets,Partial Primary Containment Isolation Occurred.Caused by Procedural Inadequacy.Procedures Reviewed & Revised + (ML20214S650)
- ML20214S652 + (ML20214S652)
- ML20214S655 + (ML20214S655)
- ML20214S662 + (ML20214S662)
- ST-HL-AE-2220, Provides Addl Info Re 870515 Request for Schedular Exemption for 10CFR50,Appendix A,Gdc 57 to Obtain Authorization to Defer Completion of Mods to Component Cooling Water Sys Return Lines Until First Scheduled Refueling Outage + (ML20214S665)
- IR 05000382/1987009 + (ML20214S667)
- ML20214S672 + (ML20214S672)
- ML20214S673 + (ML20214S673)
- ML20214S676 + (ML20214S676)
- ML20214S681 + (ML20214S681)
- ML20214S685 + (ML20214S685)
- A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 + (ML20214S687)
- 05000374/LER-1987-011-05, :on 870430,RHR Pump Min Flow Bypass Differential Pressure Switch Found Out of Tolerance Due to Setpoint Drift.Flow Switch Replaced.Old Switch Forwarded to Mfg for Disassembly & Insp + (ML20214S689)
- ML20214S693 + (ML20214S693)
- ML20214S695 + (ML20214S695)
- ST-HL-AE-2208, Forwards Revised FSAR Tables 11.5-1, Process & Effluent Radiation Sys & 12.3.4-2, Bldg Ventilation Monitors. Revs Reflect Miscellaneous Setpoint Changes & Revised Gross Failed Fuel Monitor Range + (ML20214S696)
- ML20214S698 + (ML20214S698)
- 05000483/LER-1987-008, :on 870504,util Maint Electricians Blocked Open Fire Door W/O Establishing Continuous Fire Watch.Caused by Lack of Understanding of Tech Spec Requirements.Util Maint Personnel Counseled + (ML20214S699)
- IR 05000259/1987017 + (ML20214S700)