Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-2195, Forwards Annotated Pages to Plant Fhar Documenting & Justifying App R Section III.G.2.a Deviation for Separation of Fire Areas 2 & 17.Deviation Will Be Incorporated in Future Amend to Fhar + (ML20214P496)
- ML20214P501 + (ML20214P501)
- ML20214P502 + (ML20214P502)
- ML20214P503 + (ML20214P503)
- ML20214P504 + (ML20214P504)
- ST-HL-AE-2196, Forwards Revised FSAR Section 3.6.1.1(9), Design Bases..., Allowing for Use of Analytical Methods to Evaluate Capability of Impacted Piping to Withstand Whip Impact W/O Rupture + (ML20214P505)
- TXX-5034, Forwards S&W, Comanche Peak Project Procedures (Cppp), Including Project Memo,Except CPPP-7 Which Was Transmitted on 860728 + (ML20214P506)
- ML20214P507 + (ML20214P507)
- ML20214P508 + (ML20214P508)
- ML20214P510 + (ML20214P510)
- ML20214P512 + (ML20214P512)
- ML20214P514 + (ML20214P514)
- PNO-I-86-075, on 860916,operators Removed Unit 1 from Svc to Repair Steam Leak on High Pressure Turbine Steam Return Line.Leak Caused by Steam Erosion on Section of 20-inch Pipe.Affected Section of Pipe Replaced + (ML20214P515)
- ML20214P516 + (ML20214P516)
- 05000327/LER-1986-050, :on 861030,possible Violation of Surveillance Requirements Discovered.Caused by Error in Surveillance Instruction SI-156.Instruction Will Be Revised to Show Correct Position of Root Valves + (ML20214P517)
- ML20214P519 + (ML20214P519)
- ML20214P520 + (ML20214P520)
- ML20214P521 + (ML20214P521)
- ML20214P523 + (ML20214P523)
- ML20214P524 + (ML20214P524)
- ST-HL-AE-2205, Forwards Revised FSAR Table 11.2-3, Equipment Principal Design Parameters Which Incorporates Change to Capacity of Waste Monitor Tank Pumps 1D,1E & 1F Due to Startup Field Testing + (ML20214P526)
- ML20214P527 + (ML20214P527)
- ML20214P529 + (ML20214P529)
- ML20214P530 + (ML20214P530)
- ML20214P532 + (ML20214P532)
- ML20214P533 + (ML20214P533)
- ML20214P534 + (ML20214P534)
- ML20214P537 + (ML20214P537)
- ML20214P538 + (ML20214P538)
- ML20214P539 + (ML20214P539)
- ML20214P540 + (ML20214P540)
- ML20214P541 + (ML20214P541)
- PNO-II-86-061, on 860827,turbine & Reactor Manually Tripped Due to High Bearing Vibration on Main Turbine.Caused by Damage to Some Turbine Blades on Last Stage of Low Pressure Turbine.Corrective Action Being Evaluated + (ML20214P542)
- ML20214P543 + (ML20214P543)
- ML20214P544 + (ML20214P544)
- ML20214P545 + (ML20214P545)
- PNO-II-86-089, on 861121 & 22,plant Taken Out of Svc to Replace Letdown Sys Trains.On 861121,cooler a Determined to Be Leaking When Radiation Monitor Alarmed When Preparing for Startup.On 861122,RCS Leak Rate Exceeded Tech Spec Limits + (ML20214P546)
- ML20214P548 + (ML20214P548)
- ML20214P549 + (ML20214P549)
- ML20214P551 + (ML20214P551)
- ML20214P556 + (ML20214P556)
- ST-HL-AE-2201, Second Interim Deficiency Rept Re Failure of Reactor Vessel Temporary Full Flow Filters.Initially Reported on 870406. Detailed Insp of Reactor Coolant & Interfacing Sys for Failed Screen Matl in Progress.Next Rept Provided by 870612 + (ML20214P557)
- 05000296/LER-1986-011-03, :on 861023,plant Electrician Discovered LPCI Motor Generator (MG) 3DA Uncoupled.Caused by Inadequate Procedural Detail & Acceptance Criteria in Plant Maint Instructions.Lpci MG Set Recoupled + (ML20214P559)
- ML20214P560 + (ML20214P560)
- ML20214P562 + (ML20214P562)
- ML20214P564 + (ML20214P564)
- ML20214P567 + (ML20214P567)
- ML20214P568 + (ML20214P568)
- ML20214P569 + (ML20214P569)
- ML20214P571 + (ML20214P571)
- RBG-24817, Special Rept:On 861017,valid Failure Occurred on Div II Diesel Generator While Performing Surveillance Testing. Caused by Water in Governor Cooler Return Line.Governor Drained,Flushed & Refilled + (ML20214P572)