Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212K982 + (ML20212K982)
- ML20212K983 + (ML20212K983)
- ML20212K984 + (ML20212K984)
- ML20212K985 + (ML20212K985)
- ML20212K986 + (ML20212K986)
- ML20212K989 + (ML20212K989)
- ML20212K990 + (ML20212K990)
- ML20212K991 + (ML20212K991)
- ML20212K994 + (ML20212K994)
- 05000346/LER-1987-001, Errata to LER 87-001-00,correcting Incomplete Sentence on Page 2 + (ML20212K995)
- ML20212K996 + (ML20212K996)
- ML20212K997 + (ML20212K997)
- ML20212K998 + (ML20212K998)
- ML20212K999 + (ML20212K999)
- ML20212L000 + (ML20212L000)
- TXX-4965, Final Deficiency Rept CP-86-30 Re Burnt Wire on Capacitor Bank in Elgar Corp Power Sys Inverter & Burnt Tywraps. Initially Reported on 860418.Burnt Wire Attributed to Bad Crimping.Issue Not Reportable Per 10CFR50.55(e) + (ML20212L001)
- ML20212L004 + (ML20212L004)
- ML20212L005 + (ML20212L005)
- ML20212L006 + (ML20212L006)
- ML20212L009 + (ML20212L009)
- ML20212L010 + (ML20212L010)
- ML20212L011 + (ML20212L011)
- ML20212L012 + (ML20212L012)
- 3F0187-16, Partial Revised Response to Violations Noted in Insp Rept 50-302/86-31.Corrective Actions:Procedures OP-402 & OP-408 Revised to Assure Inclusion of Tech Spec 6.8.1 Requirements. Short Term Instruction Corrected Problem Temporarily + (ML20212L013)
- U-600686, Deficiency Rept 55-86-05 Re Unsealed Gaps in 3-h Rated Fire Wall.Initially Reported on 860717.Investigation Continuing. Addl Fire Watches Established.Final Rept Will Be Submitted in Approx 30 Days + (ML20212L014)
- ML20212L015 + (ML20212L015)
- ML20212L017 + (ML20212L017)
- ML20212L018 + (ML20212L018)
- ML20212L019 + (ML20212L019)
- ST-HL-AE-1946, Forwards Annotated Rev to Response to NRC Question 280.09N Re Fire Protection & Ventilation Sys.Rev Allows Operational Flexibility Regarding Smoke Removal & Use of Stairwells. Change Will Be Incorporated Into FSAR Amend 59 + (ML20212L020)
- PLA-2753, Monthly Operating Repts for Oct 1986 + (ML20212L021)
- TXX-6306, Suppls Response to Violations Noted in Insp Repts 50-445/86-07 & 50-446/86-05.Corrective Actions:Calculations for Verifying Adequacy of Design Info Reperformed & Verified Per Procedure TNE-DC-3 on 860521 + (ML20212L022)
- ML20212L024 + (ML20212L024)
- ML20212L025 + (ML20212L025)
- 05000373/LER-1987-008-01, :on 870203,required Sample of Offgas to Determine Hydrogen Content Taken Late.Caused by Personnel Error.Individual Foreman Counseled & Second Alarm Programmed Into Reminder Clock + (ML20212L026)
- ML20212L027 + (ML20212L027)
- NLS8700065, Annual Operating Rept,1986 + (ML20212L028)
- ML20212L029 + (ML20212L029)
- ML20212L031 + (ML20212L031)
- ML20212L032 + (ML20212L032)
- ML20212L033 + (ML20212L033)
- ML20212L036 + (ML20212L036)
- BSEP-87-0036, Forwards Corrected Results of Sample Submitted on 861215 Reflecting Pico Ci/Liter Instead of Ci,Per Oral Commitment During Insp Repts 50-324/86-27 & 50-325/86-26 Exit Interview + (ML20212L038)
- ML20212L040 + (ML20212L040)
- ML20212L041 + (ML20212L041)
- ML20212L042 + (ML20212L042)
- ML20212L046 + (ML20212L046)
- ML20212L047 + (ML20212L047)
- ML20212L048 + (ML20212L048)
- ML20212L051 + (ML20212L051)
- ML20212L052 + (ML20212L052)