Monthly Operating Rept for June 1986.Related Correspondence
ML20212L033
Person / Time
Site: Limerick Constellation icon.png
Issue date: 06/30/1986
From: Alden W, Logue R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CON-#386-043, CON-#386-43 OL, NUDOCS 8608250171
Download: ML20212L033 (6)


Text

~

kt &$ Cowesp&CC

  • v 90-352 OL-

_m f

OPERATING DATA REPORT I

DOCKET HD. 50 - 352 DATE JULY 15, 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION HUCLEAR GENERATION DIVISIGH TELEPHONE (2151 841 5022 OPERATING STATUS

1. UNIT HAMEt LINERICK UNIT-1 l H0TESI UNIT 1 EXPERIEHCED ONE l

l

2. REPORTING PERIODI JUNEe 1986 i

SCHEDULED OUTAGE FOR l l

3. LICENSED THERNAL POWER (HWT)I 3293 l

SURVEILLANCE TEST'.HG. l t

i

4. HAMEPLATE RATING (6ROSS MWEls 1138 l

l l

l

5. DESIGN ELECTRICAL RATING (HET NWEll 1055 l

l l

1

6. NAXIMUM DEPENDABLE CAPACITY (GROSS NWEll 1092 l

l I

1

7. HAXIMUM DEPEH0ABLE CAPACITY (HET MWEll 1055 l

l l

t

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS HUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSt l
9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (HET tedElf I

l

10. REASONS FOR RESTRICTIONS, IF ANYI i

l t

THIS NONTH YR-TO-DATE

-CUMULATIVE

11. HOURS IN REPORTING PERIOD 720 3.599 3.599

.12. HUMBER OF HOURS REACTOR WAS CRITICAL 341.0 2,498.7 2:498.7

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS CEHERATOR ON-LINE 278.1 2.430.3 2.430.3
15. UNIT RESERVE SHUTDOWH HOURS 0.0 0.0 0.0
16. GROSS THERNAL EHERGY GENERATED (ISM) 899.578 7.959.068 7 959.068
17. GROSS ELECTRICAL ENERGY GENERATED (HWH) 283.670 2.631,400 2.631.400 l

l l

18. HET ELECTRICAL ENERGY GENERATED (HWH) 266.229 2.523:090 2.523.090
19. LNIT SERVICE FACTOR 38.6 67.5 67.5 8608250171 860630 PDR ADOCK 00000352 t

l R

PDR

4 I

20. UNIT, AVAILABILITY FACTOR 38.6 67.5 67.5
21. UNIT CAPACITY FACTOR (USING MDC HET) 35.0 66.5 66.5
22. UNIT CAPACITY FACTOR (U5ING DER HET) 35.0 66.5 66.5
23. UNIT FORCED OUTAGE RATE 0.0 1.1 1.1 j
24. SHUTDONHS SCHEDULED DVER HEXT 6 MONTHS (TTPE, DATE AND DURATIDH OF EACHis t,

?

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIOHit FORECAST ACHIEVED f

IHITIAL CRITICALITY I2/19/84 12/22/84 7

INITIAL ELECTRICITY MID APRIL 85 4/13/85 l

IST QTR 86 2/01/86 Cott1ERCIAL OPERATIDH

'4 4

1 6

t i

I c

i i

c l

m.

._ m _

m__--..

i

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET HD. 50 - 352 s

UNIT LIMERICK UNIT 1 DATE JULY 15. 1986 COMPANY PHILADELPHIA ELECTRIC COMPANY

...............__.J........

W.M. ALDEN ENGINEER-IN-CHARGE LICENSING SECTION HUCLEAR GENERATION DIVISIDH p

r TELEPHONE (215) 641-5022 n

NONTH JUf4E 1986 t

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWE-HET)

(MWE-HET) i i

1 0

17 0

lj i

2 0

18 0

i 3

0 19 180 0

0 20 820 5

0 21 1037 I

6 4

0 22 1023 i

f.

7 O

23 1031 l

e

[

0 24 1039 8

9

]

O 25 1045 j

{

l 10 0

26 1044 l

r 11 0

27 1034 12 0

28 1029 13 0

29 1031 14 0

30 1041 15 0

12 0

t l

UNIT SHUTDoms AM) POWER REDUCTIONS DOCKET NO. 50 352 UNIT HAME LINERICK UNIT 1 i:

DATE JULY 15, 1986 REPORT HONTH JUNE 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L

W.M.ALDEH ENGINEER.IN-CHARGE e

LICENSING SECTION l

HUCLEAR GENERATIDH DIVISION TELEPHONE (215) 841-5022 I

l I

l l HETH00 0F l LICENSEE ISYSTEHlCOMP0HENTl CAUSE AND CORRECTIVE l

ITYPElDURATIONlREASONISHUTTING DOWHI EVENT l CODE I CODE l ACTIDH TO

.1 DATE l (1)l (HOURS)I (E) l REACTOR (3) l REPORT 8 I (4) l (5) l PREVENT RECURRENCE I

I I

I I

I I

I I

) l 660601 1 3 1 441.9 i B l 1

i H/A I ZZ l ZZZZZZ l REQUIRED SURVEILLANCE TEST OUTAGE.

I i

1 ----- 1 I

I I

I I

I I

I 441.9 I I

I I

i 1

.L I

l 11)

(2)

(3)

(4)

- FORCED REASON METHOD EXHIBIT S. INSTRUCTIDHS

- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - NAHUAL FOR PREPARATION OF DATA B

MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C. REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER) h D - REGULATORY RESTRICTIDH 4 - OTHER (EXPLAIH)

FILE (HUREG-0161)

E. OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5) 6 - OPERATIONAL ERROR (EXPLAIH)

{

H. OTHER(EXPLAINI EXHIBIT I - SAME SOURCC I:

i i

t t

t I,

l 4

i

+

w

p r

Docket No. 50-352 p

Attachment to Monthly Operating Report for June, 1986 r

I i

Limerick Generating Station Unit 1 June 1 through June 30, 1986 r

1.

Narrative Summary of Operating Experiences The unit begin the month shutdown for a scheduled i

surveillance and maintenance outage.

The outage -work is centered on Local Leak Rate Testing,

-Diesel-Generator Modifications & Testing, Main Steam Relief Valve change outs, snubber testing, and modifications to the Standby Gas' Treatment System.

Major activities completed during June associated with the surveillance testing and maintenance outage consisted of the followings testing on the Standby Gas Treatment System

[

(SBGTS) and the Control Room Emergency Presh Air System (CREFAS), replacement of Safety Relief Valve solenoids, and anubber inspection.

On June 16, the reactor mode switch was placed in Startup and HPCI and RCIC low pressure operability tests were performed satisfactorily.

Unit criticality was achieved at

[

7:00 PM on June 16 and the generator was synchronized at i

9:55 AM on June 19.

[

On June 21, 100% reactor power was reached and continued 7

for the remainder of the month.

t i

l f

II. -

Challenges to Main Steam Safety Relief Valves L

4 The only MSRV challenge occurred on June 18 when the ADS SRV's (S, H,

M, E,

K) were manually opened in accordance L

with Surveillance Test, ST-6-050-760-1, which was performed

(

satisfactorily.

P I

i

--m

-- - - + - - - - -

.-.,-,,--m e-,

m,

,,--.,,y

-o-.

m-

,y,_-,-- - - -, - -r- - -,

.-.-,w-w m,.

,-m

.----,---_m,---,-

~

t l

cc:

Troy B.

Conner, Jr.,

Esq.

Ann P.

Hodgdon, Esq.

Mr. Frank R.

Romano l

Mr. Robert L.

An thony Ms. Phyllis Zitzer Charles W.

Elliott, Esq.

Barry M.

Hartman, Esq.

Mr. Thomas Gerusky Director, Penna. Emergency Management Agency Angus Love, Esq.

David Wersan, Esq.

Robert J.

Sugarren, Esq.

Kathryn S.

Lewis, Esq.

Spence W.

Perry, Esq.

Jay M. Gutierrez, Esq.

Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing Board Panel Docket & Service Section (3 Copies)

E. M.

Kelly Timothy R.

S.

Campbell i

l i

4 i

l I

l February 4, 1986 i

I i

I l

l l

l h

l.' 4 i

t

._ m

g MRATf.D CORRESPONSENCE J

9 PHILADELPHIA ELECTRIC COMPANY DOCKETED 2301 MARKET STREET USNRC l

P.O. BOX 8699 yl PHILADELPHI A. PA.19101 86 JL 21 20:39

)

(2 51 e41-4000 0FFICD01p& SEFYici,Eil5 JM1986

\\

00CKETitib

-)

D$)N EE No. 50-352 O d

.d{

.'3di Director 1Ei !

Office of Resource Management d.

US Nuclear Regulatory Commission

'8;,

Washington, DC 20555

' )a

SUBJECT:

Limerick Generating Station

.,5'f Monthly Operating Report z] l Gentlemen:

W !

. J:W i

Enclosed is the monthly operhting report for Limerick 2:hl Unit 1 for the month of June 1986, forwarded pursuant to f

Technical Specification 6.9.1.6.

?

j

, f..

}';

Very truly. ou 2.s k

l R. H. Ldguit

-?

Superintendent f

Nuclear Services ij f

7j Attachment I

cc:

Director, Office of Inspection & Enforcement, US9RC (12 copies) 9 Dr. T.

E. Murley, NRC J

E. M. Kelly, Senior Resident Site Inspector i.

Mr. David E. Ney, PA Dept. of Envir. Resources y l Mr.

P. A. Ross, NRC (2 copies)

, [p, INPO Records Center

,h.

See Attached Service List

,7

. x: N

. g.;;-

q,2 7 4

aj 2

d<

a)

I

.t i

4e.4 3

eg a.% g o e. partg y 9 3.g g, _..,

  • p a g -s - g-

,4 9

n ** -

'.a.