ML20212K994
| ML20212K994 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/31/1986 |
| From: | Couture R, George Thomas PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| SBN-1228, NUDOCS 8701290274 | |
| Download: ML20212K994 (6) | |
Text
- _ _ - - _ - _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _
.s f.
Li-OPERATING DATA REPORT I-DOCKET NO.
50-443 DATE 11/03/86 COMPLETED BY R. Couture TELEPHONE (603) 474-9521
( Ext. 4077]~
OPERATING STATUS 1.
Unit Name:
Seabrook Station Unit 1 2.
Reporting Period October 17th to 31st, 1986 3.
Licensed Thermal Power (MWt):
3411 4.
Nameplate Rating (Gross MWe):
1197 5.
Design Electrical Rating (Net MWe):
1148
'6.
Maximum Dependable Capacity (Gross MWe):
1197 (Initial design value) 7.
Maximum Dependable Capacity (Net MWe):
1148 (Initial design value) 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Not Applicable 9.
Power Level To Which Restricted, If Any (Net MWe):
Zero power
- 10. Reasons For Restrictions, If Any:
License issued on 10/17/86 is a zero power license which allows fuel loading and performance of non-nuclear testing.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 361.0 361.0 361.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
'14. Hours' Generator On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Cross Thermal Energy Generated (MWH) 0 0
0
- 17. Gross Elec. Energy Generated (MWH) 0
. 0 0
- 18. Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit' Service Factor 0.0 0.0 0.0
- 20. Unit Availability Factor 0.0 0.0 0.0
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0
- 23. Unit-Forced Outage Rate 0.0 0.0 0.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Not Scheduled
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup: Not Applicable
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 1987 Not Applicable INITIAL ELECTRICITY 1987 Not Applicable COMMERCIAL OPERATION 1987 Not Applicable
+
B701290274 Ehb1031 PDR ADOCK 05000443 p
PDR I il
c AVERACE DAILY UNIT POWER LEVEL i
DOCKET NO.
50-443 UNIT Seabrook 1 j
DATE 11/03/86 1
COMPLETED BY R. Couture TELEPHONE (603) 474-9521
)
(Ext. 4077)
MONTH OCTOBER, 1986 i
.l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t)
(MWe-Ne t) l l
1 0
17 0
j 2
0 18 0
3 0
19 0
4 0
20 0
i i
5 0
21 0
6 0
22 0
7 0
23 0
I 8
0 24 0
1-9 0
25 0
10 0
26 0
{
11 0
27 0
i 12 0
28 0
13 0
29 0
i 14 0
30 0
j 15 0
31 0
16 0
INSTRUCTIONS i
On this format, list the average daily unit power level in MWe-Net for each day l
in the reporting month.
Compute to the nearest whole megawatt.
i
l j
DOCKET NO.
50-443 UNIT SHUTDOWNS A*.D POWER REDUCTIONS UNIT NAME Seabrook 1 DATE 11/03/86 COMPLETED BT R. Couture REPORT ENTH OCTOBER, 1986 TELEPHONE (603) 474-9521 i
( E xt. 4077) l Duration Reason 2 Method of Licensee cause & Corrective No. Date Type (Hours)
Shutting Event Action to J
Down Reactor 3 Report #
Prevent Recurrence NO ENTRIES FOR THIS ENTH 1
2 3
F: Fored Reason:
Method:
S:
Sche &nled A-Equipment Failure (Explain) -
I-Manual 1
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued from E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain)
(Duration = 0)
H-Other (Explain) 9-Other (Explain)
O S
m-
,y e
v.
~.. _,,
Docket No.
50--443 Data 11/03/86 Unit Name Se< brook 1 Completed By R. Couture Te lephone (603) 474-9521
( Ext. 4077)
CORRECTIVE MAINTENANCE StDDRRY FOR SAFETY RELATED EQUIPMENT Page 1 of 1 REPORT MONTH OCTOBER 17th to 31st, 1986 DATE SYSTEM COMPONENT MAINTENANCE ACTION 10/22/86 Radiation Monitoring RM-6535-A Replaced +24 volt DC regulator.
10/24/86 Containment Building CBS-V-14 Repaired damaged valve seat.
Spray Containment Recirculation Sump Isolation 10/24/86 Rod Control and B Reactor Cleaned limit switch contacts which automati-Position Trip Breaker cally charge the breaker closing springs.
10/28/86 Diesel Generator DG-1A Replaced leaking fuel injector on cylinder System number 5.
10/28/S6 Diesel Generator DG-1B Replaced fuel injector and injector pump drive System assembly on cylinder number 4.
10/28/86 Service Water SW-V-18 Rebuilt valve actuator.
B DG Jacket i
Water Cooler Outlet Valve
'e s
Dockst No.
50-443 Data:
11/03/86 Completed By:
R. Couture Telephone:
(603) 474-9521
( E xt. 4077)
REFUELING INFORMATION REQUEST i
- 1. Name of facility:
Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Not Scheduled
- 3. Scheduled date for restart following refueling: Not Scheduled
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
j Unknown at this time.
1 J
- 5. Scheduled date(s) for submitting licensing action and supporting information:
Not Applicable
- 6. Important licensing considerations associated with refueling, e.g.,
new or dif ferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None 4
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
e f
(a) In Core 193 (b) 0 8.-The present licensed spent fuel pool storage capscity and the size of c
any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
i l
Present itcensed capacity:
1236 l'
No increase in storage capacity requested or planned.
l-
- 9. The projected date of the last refueling that can be discharged to i
the spent fuel pool assuming the present licensed capacity:
)
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core of fload capability.
i The current licensed capacity is adequate until at least the year 2007.
i 5
l l
4
f..
George S. Thomas vice preeksent Nuclear Prodochoa PubEC Service of New Hampshire November 10, 1986 SBN-1228 T.F. B.7.1.2 United States Nucle.ir Regulatory Commission Washington, D.C.
211555 Attention: Director, Office of Resource Management
Reference:
(a) Facility Operating License No. NPF-56, Docket No. 50-443 Subj ect: Monthly Operating Report
Dear Sir:
In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 86-10 covering the operation and shutdown experience relating to Seabrook Station Unit 1.
Very truly yours, eor S. Thomas Enclosure cc: Regional Administrator U. S. Nuclear Regulatory Commission - Region I 631 Park Avenue King of Prussia, PA 19406 f*Ms\\
P.O. Box 300 Seabrook, NH O3874. Telephone (603) 474-9521
--