Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000410/1986033 + (ML20212J202)
- ML20212J205 + (ML20212J205)
- ML20212J206 + (ML20212J206)
- ML20212J207 + (ML20212J207)
- 05000440/LER-1986-033, :on 860711,while Filling Reactor Vessel Ref Leg,Hpcs Diesel Generator Autostarted on Reactor Vessel Water Level Low Signal.Caused by Instruction Deficiency. Instruction Revised to Change Value Above Trip Setpoint + (ML20212J208)
- ML20212J209 + (ML20212J209)
- ML20212J210 + (ML20212J210)
- ML20212J216 + (ML20212J216)
- ML20212J217 + (ML20212J217)
- ML20212J218 + (ML20212J218)
- ML20212J219 + (ML20212J219)
- IR 05000213/1987003 + (ML20212J221)
- ML20212J222 + (ML20212J222)
- ML20212J223 + (ML20212J223)
- 05000440/LER-1986-034, :on 860711,RHR Sys a Outboard Containment Isolation Valves Isolated Automatically.Caused by Deenergization of Nuclear Steam Supply Shutoff Sys & Personnel Error.Personnel Counseled on Precaution Measures + (ML20212J225)
- A06230, Responds to NRC 861124 Request for Addl Info Re Util Response to Generic Ltr 83-28,Item 2.1.2 Concerning Documentation of Method for Assuring That Facility Receives Specified Maint & Technical Info from GE + (ML20212J226)
- ML20212J227 + (ML20212J227)
- 05000219/LER-1987-005, :on 870116,high Flux Reactor Scram Occurred Due to Increased Recirculation Flow.Caused by Starting of Pump W/Discharge Valve Partially Open.Second Scram Occurred Due to Calibr Error.Valves Readjusted + (ML20212J228)
- ML20212J229 + (ML20212J229)
- IR 05000354/1986058 + (ML20212J230)
- 05000327/LER-1987-007, :on 870130,discovered That Procedures Failed to Include Response Time Testing of Small Portion of Several Radiation Monitor Channels.Caused by Procedural Deficiency. Procedures Revised + (ML20212J231)
- ML20212J232 + (ML20212J232)
- 05000352/LER-1986-036, :on 860708,hourly Firewatch for Five Fire Barriers Not Performed within 1 H Time Interval Required by Tech Spec 3.7.7.Caused by Lack of Communication W/Security Force Personnel.Security Procedures Revised + (ML20212J233)
- ML20212J234 + (ML20212J234)
- ST-HL-AE-1720, Forwards Proposed Responses to Assist NRC in Responding to Doi & Jf Doherty Comments on Des,Per Np Kadambi Request.Most Doi Comments Addressed in CP Review + (ML20212J237)
- ML20212J238 + (ML20212J238)
- ML20212J239 + (ML20212J239)
- ML20212J242 + (ML20212J242)
- ML20212J244 + (ML20212J244)
- ML20212J245 + (ML20212J245)
- SNRC-1319, Authorizes JW Devlin to Submit Fingerprints to NRC & to Receive Results Under Criminal History Program,Per NRC 870128 Request.Af Downs or J Little Designated as Alternates + (ML20212J246)
- ML20212J247 + (ML20212J247)
- ML20212J249 + (ML20212J249)
- ML20212J250 + (ML20212J250)
- HL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons + (ML20212J251)
- ML20212J252 + (ML20212J252)
- ML20212J255 + (ML20212J255)
- IR 05000397/1986038 + (ML20212J257)
- IR 05000293/1987008 + (ML20212J259)
- ML20212J260 + (ML20212J260)
- L-99-099, Requests Partial Withdrawal of LAR 120,which Requested Review of USQ Due to Increased Calculated Doses for Locked Rotor Event & Use of Unapproved Methodology for Evaluating Small Break LOCA Doses Involving W Natl Safety Advisory Ltr + (ML20212J262)
- ML20212J263 + (ML20212J263)
- ML20212J264 + (ML20212J264)
- ML20212J265 + (ML20212J265)
- ML20212J267 + (ML20212J267)
- ML20212J268 + (ML20212J268)
- ML20212J269 + (ML20212J269)
- ML20212J272 + (ML20212J272)
- ML20212J274 + (ML20212J274)
- ML20212J278 + (ML20212J278)
- ML20212J279 + (ML20212J279)