Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E902 + (ML20212E902)
- ML20212E903 + (ML20212E903)
- ML20212E904 + (ML20212E904)
- ML20212E905 + (ML20212E905)
- 05000317/LER-1987-004, :on 870302,unit Manually Tripped Due to High Pressurizer Pressure from Turbine Runback.Caused by Improper Procedural Guidance to Reducing Main Generator Hydrogen Pressure.Procedures Revised + (ML20212E907)
- ML20212E909 + (ML20212E909)
- ML20212E910 + (ML20212E910)
- U-600831, Advises of Completion of Deferred Testing for Initial Criticality & Heatup Project Milestones.Test Results Reviews Complete & Satisfactory + (ML20212E911)
- ML20212E912 + (ML20212E912)
- 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER + (ML20212E914)
- HL-5505, Submits 30-day Response to GL 97-04 Re Issues Which May Have Generic Implications to ECCS & Chrs.Info Requested Will Be Provided by 980105 + (ML20212E915)
- ML20212E919 + (ML20212E919)
- 05000281/LER-1986-009-03, :on 860709,reactor Trip Breaker Opened Following Spurious RCS Low Flow Signal.Caused by Personnel Error During Replacement of Failed Reactor Protection Sys Train B Relay.Individual Counseled + (ML20212E921)
- 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments + (ML20212E922)
- PNO-III-86-149, on 861217,seal on motor-driven Feedwater Pump Failed While Pump Was Being Started,Causing Leak of About 200 Gallons Per Minute.Water Was Drained to Radwaste Water Treatment Sys + (ML20212E923)
- ML20212E924 + (ML20212E924)
- 05000361/LER-1999-005-01, :on 990831,loss of Physical Separation in Control Room,Occurred.Caused by Personnel Error.Creacus Train a Was Returned to Standby on 990831 + (ML20212E929)
- PNO-IV-86-013, on 860415,Colorado Dept of Health,Radiation Control Div Notified Region Iv,State & Governmental Affairs Staff,That Troxler Moisture & Density Gauge Containing 9mCi of Cs-137 & 44mCi of AM-241 Was Stolen from Truck on 860414 + (ML20212E932)
- U-600849, Provides Rept on Completion of IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Imppropoer Switch Settings, Per Bulletin Item F. Correct Switch Settings Determined & Adjusted + (ML20212E935)
- 05000354/LER-1997-025, :on 971004,engineering Personnel Confirmed That Potential Unmonitored Release Path Existed Since Plant Startup.Caused by Human Error in Original Design & in Subsequent Design Reviews.Design Change Will Be Implemented + (ML20212E936)
- 05000354/LER-1999-008-01, :on 990817,CR Was Notified That Control Equipment Mezzanine (CEM) Floor Drain Discovered in Open Position.Caused by Failure to Include CEM Floor Drain Valve in Tagging Control Sys.Valve Was Closed.With + (ML20212E937)
- ML20212E939 + (ML20212E939)
- ML20212E944 + (ML20212E944)
- ML20212E945 + (ML20212E945)
- 05000499/LER-1999-005-01, :on 990824,ESFA Following Loss of Power to Standby Transformer 2 Was Noted.Internal Fault Caused C Phase Arrester Failure.Replaced All Surge Arresters for Standby Transformer 2 + (ML20212E950)
- ML20212E951 + (ML20212E951)
- ML20212E952 + (ML20212E952)
- L-96-034, TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns + (ML20212E953)
- ML20212E954 + (ML20212E954)
- BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval + (ML20212E959)
- ML20212E960 + (ML20212E960)
- ML20212E961 + (ML20212E961)
- ML20212E963 + (ML20212E963)
- PNO-V-86-020, on 850418,Unit 2 Reactor Was Brought to Criticality Following Dilution of Rcs.Estimated Critical B Was 1015 Ppm W/Group 5 Control Rod Bank 75 Inches Withdrawn. Resident Inspector Witness Approach to Initial Criticality + (ML20212E964)
- ML20212E966 + (ML20212E966)
- ML20212E967 + (ML20212E967)
- PNO-V-86-047, on 860722,licensee Declared Unusual Event Due to Both Trains of Decay Heat Sys Being Declared Inoperable. RCS Temp Was Approx 84 F W/Atmospheric Pressure + (ML20212E968)
- ML20212E969 + (ML20212E969)
- ML20212E970 + (ML20212E970)
- TXX-9720, Forwards Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval + (ML20212E971)
- ML20212E972 + (ML20212E972)
- IR 05000382/1986027 + (ML20212E973)
- ML20212E975 + (ML20212E975)
- ML20212E976 + (ML20212E976)
- ML20212E979 + (ML20212E979)
- ML20212E980 + (ML20212E980)
- ML20212E981 + (ML20212E981)
- ML20212E982 + (ML20212E982)
- IR 05000382/1986025 + (ML20212E983)
- ML20212E985 + (ML20212E985)
- ML20212E987 + (ML20212E987)