Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 + (ML20212E513)
- ML20212E517 + (ML20212E517)
- ML20212E519 + (ML20212E519)
- 05000458/LER-1997-002, :on 970506,through-wall Crack in Weld on RRS Vent Valve Was Noted.Caused by Low Stress,High Cycle Fatigue Induced by Vibration.Valve Replaced Prior to Returning to Power Operations + (ML20212E520)
- ML20212E521 + (ML20212E521)
- ML20212E522 + (ML20212E522)
- ML20212E523 + (ML20212E523)
- ML20212E524 + (ML20212E524)
- ML20212E525 + (ML20212E525)
- 2CAN128604, Responds to NRC Re Concerns W/Lack of Mgt Support for ALARA Program Noted in Insp Rept 50-368/86-17. Corrective Actions:Util Training Notified to Emphasize Addl Training Re ALARA Program & ALARA Goals Discussed + (ML20212E528)
- ML20212E530 + (ML20212E530)
- ML20212E531 + (ML20212E531)
- ML20212E534 + (ML20212E534)
- ML20212E535 + (ML20212E535)
- ML20212E536 + (ML20212E536)
- ML20212E538 + (ML20212E538)
- ML20212E539 + (ML20212E539)
- ML20212E540 + (ML20212E540)
- ML20212E541 + (ML20212E541)
- ML20212E542 + (ML20212E542)
- ML20212E544 + (ML20212E544)
- U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl + (ML20212E547)
- ML20212E548 + (ML20212E548)
- ML20212E550 + (ML20212E550)
- ML20212E551 + (ML20212E551)
- ML20212E552 + (ML20212E552)
- ML20212E553 + (ML20212E553)
- 05000323/LER-1986-002-01, :on 860117,instrument Ac Panel Py 2-1 Inadvertently Transferred to Backup Power.Caused by Unlicensed Operator Error.Operator Counseled & Procedures Revised + (ML20212E554)
- ML20212E556 + (ML20212E556)
- ML20212E557 + (ML20212E557)
- ML20212E558 + (ML20212E558)
- ML20212E559 + (ML20212E559)
- ML20212E560 + (ML20212E560)
- ML20212E561 + (ML20212E561)
- ML20212E563 + (ML20212E563)
- U-602855, Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 971218 + (ML20212E564)
- ML20212E565 + (ML20212E565)
- ML20212E567 + (ML20212E567)
- IR 05000461/1986078 + (ML20212E568)
- ML20212E570 + (ML20212E570)
- ML20212E571 + (ML20212E571)
- ML20212E572 + (ML20212E572)
- ML20212E573 + (ML20212E573)
- IA-86-183, Forwards Commission Statement of Policy on Handling of Late Allegations,For Info & Immediate Implementation.Policy Will Be Incorporated in Future Rev to Manual Chapter 0517, Mgt of Allegations + (ML20212E574)
- ML20212E574 + (ML20212E574)
- ML20212E575 + (ML20212E575)
- ML20212E576 + (ML20212E576)
- ML20212E577 + (ML20212E577)
- ML20212E578 + (ML20212E578)
- ML20212E580 + (ML20212E580)
- ML20212E584 + (ML20212E584)