Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 + (ML20210G362)
- ML20210G365 + (ML20210G365)
- ML20210G366 + (ML20210G366)
- ML20210G367 + (ML20210G367)
- ML20210G370 + (ML20210G370)
- U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS + (ML20210G371)
- ML20210G375 + (ML20210G375)
- ML20210G383 + (ML20210G383)
- ML20210G385 + (ML20210G385)
- ML20210G386 + (ML20210G386)
- 05000313/LER-1986-008-01, :on 861231,reactor Tripped on High RCS Pressure from 25% Power.Caused by Reduction of Feedwater During Troubleshooting of Integrated Control Sys.Module in RCS Average Temp Correction Circuitry Replaced + (ML20210G392)
- ML20210G393 + (ML20210G393)
- ML20210G395 + (ML20210G395)
- ML20210G398 + (ML20210G398)
- ML20210G402 + (ML20210G402)
- NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 + (ML20210G408)
- ML20210G413 + (ML20210G413)
- ML20210G415 + (ML20210G415)
- 05000317/LER-1999-003, :on 990701,recognized That Unapproved Methodology Was Used to Allow CREVS to Remain Operable in accept-as-is Condition.Regulatory Notification Required in 10CFR50.72(b)(1)(ii)(A) Performed.With + (ML20210G419)
- ML20210G423 + (ML20210G423)
- ML20210G424 + (ML20210G424)
- ML20210G425 + (ML20210G425)
- ML20210G427 + (ML20210G427)
- ML20210G430 + (ML20210G430)
- ML20210G431 + (ML20210G431)
- ML20210G435 + (ML20210G435)
- ML20210G438 + (ML20210G438)
- ML20210G439 + (ML20210G439)
- ML20210G445 + (ML20210G445)
- ML20210G448 + (ML20210G448)
- ML20210G451 + (ML20210G451)
- U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 + (ML20210G452)
- ML20210G456 + (ML20210G456)
- ML20210G462 + (ML20210G462)
- ML20210G463 + (ML20210G463)
- ML20210G465 + (ML20210G465)
- ML20210G467 + (ML20210G467)
- ML20210G472 + (ML20210G472)
- 05000482/LER-1986-009, :on 860224,control Room Ventilation Isolation Signal Initiated Due to Loss of Sample Flow in Intake Radiation Monitors GK-RE-04 & GK-RE-05.Cause Unknown. Evaluation Continuing.Monitors Returned to Svc + (ML20210G477)
- ML20210G480 + (ML20210G480)
- ML20210G481 + (ML20210G481)
- IR 05000244/1987003 + (ML20210G482)
- TXX-4733, Interim Significant Deficiency Rept CP-86-10 Re Electrical Penetration Assemblies Not Provided in Accordance W/Design Requirements.Initially Reported on 860214.Issue Under Evaluation.Next Rept Anticipated by 860424 + (ML20210G485)
- IR 05000382/1986024 + (ML20210G486)
- ML20210G487 + (ML20210G487)
- 05000352/LER-1986-014, :on 860227,reactor Encl Isolation Occurred W/ Actuation of Recirculation Sys & Standby Gas Treatment Sys. Caused by Break in Equipment Access Airlock.Sys Reset & HVAC Returned to Normal + (ML20210G488)
- ML20210G490 + (ML20210G490)
- ML20210G494 + (ML20210G494)
- IR 05000288/1999001 + (ML20210G495)
- ML20210G501 + (ML20210G501)
- ML20210G503 + (ML20210G503)