ML20210G481

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/86-43 & 50-457/86-38 on 860811-0912.No Violations Noted
ML20210G481
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/22/1986
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20210G484 List:
References
NUDOCS 8609250410
Download: ML20210G481 (2)


See also: IR 05000456/1986043

Text

_

. .-

SEP 2 21986

Docket No. 50-456

Docket No. 50-457

Comonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine. safety inspection conducted by Mr. A. Dunlop, Jr.,

of this office, and Messrs. B. Gunther and B. Shier, of Brookhaven National

Laboratory, on August 11 through September 12, 1986, of activities at the

Braidwood Station, Units 1 and 2,_ authorized by NRC Construction Permits No.

CPPR-132 and No. CPPR-133 and to the discussion of our findings with

Mr. P. L. Barnes at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

= examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this-

inspection.

In accordance with 10 CFR 2.790 of the_ Comission's regulations,- a copy of

this letter a'nd the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by Mark A. Ring for:

Charles W. Hehl, Chief

Operations Branch

Enclosure: Inspection Report

.

No.50-456/86043(DRS);

No. 50-457/86038(DRS)

.

See Attached D_i_stribution

RIII

RIllh RIII RIII

l

'

n

Dunlop

ad Ring

w

Gardner

p%Hehl

09/17/86

8609250410 860722 \(

PDR ADOCK 05000456

G ~PDR

. - - - - _ _ _

-

.

-

. . .

Commonwealth Edison Company 2

SEP 2 21986

Distribution

cc w/ enclosure:

. D. L. Farrar,- Director.

of Nuclear Licensing

M. Wallace,-Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS).

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector,-RIII Byron

Phyllis Dunton,_ Attorney

General's Office Environmental

Control Division

' D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division-

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Ca11ihan, ASLB

The Honorable Richard F. Cole, ASLB

i

s

1

!

j

-