Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206P662 + (ML20206P662)
- ML20206P664 + (ML20206P664)
- 05000395/LER-1999-005, :on 990412,ESF Components Were Potentially Outside Design Basis of Plant.Caused by Submergence Qualification Issues for Certain ESF Components.All Affected Components Were Verified + (ML20206P665)
- 05000286/LER-1986-007-01, :on 860527,during Surveillance Testing W/ Reactor in Hot Shutdown,Inadvertent Safety Injection Actuation Occurred.Caused by Technicians Activating High Steam Flow Portion of Safety Injection Logic + (ML20206P667)
- ML20206P670 + (ML20206P670)
- IR 05000309/1986011 + (ML20206P672)
- ML20206P675 + (ML20206P675)
- 05000425/LER-1998-010, :on 981209,reactor Overpower Event Following Instrument Calibration Was Noted.Caused by Cognitive Personnel Error.Technician & Assistant Team Leader Involved Have Been Counseled on Procedure Compliance.With + (ML20206P677)
- 05000395/LER-1986-009, :on 860531,reactor Tripped During Testing of power-range Neutron Detector Channels.Caused by Technician Incorrectly Making Adjustments to Second Channel.Personnel Counseled + (ML20206P678)
- ML20206P679 + (ML20206P679)
- ML20206P680 + (ML20206P680)
- ML20206P681 + (ML20206P681)
- ML20206P682 + (ML20206P682)
- HL-5725, Informs That SNC Intends to Examine Approx Dozen Weld Overlays During Unit 1 Spring 1999 Outage That to Date Have Not Been Examined Three Times Since Weld Overlay Was Supplied + (ML20206P683)
- ML20206P685 + (ML20206P685)
- ML20206P686 + (ML20206P686)
- 05000317/LER-1998-009, :on 980408,required Hourly Fire Watch Missed, When Contractor Maint Worker Failed to Perform Fire Watch Patrol.Caused by Personnel Error.Plant Mgt Reiterated Expectation to Contractor Personnel.With + (ML20206P687)
- ML20206P689 + (ML20206P689)
- 05000251/LER-1986-013-01, :on 860722 & 24,while Performing Maint on Safeguard Relays,Phase a Containment Isolation Actuated. Caused by Inadvertent Relay Actuation.Actuation Signal Reset & Valves Reopened + (ML20206P690)
- HL-5712, Forwards Ehnp Intake Structure License Rept, to Provide Example of Technical Content & Level of Detail Planned for Application for License Renewal,For NRC Review + (ML20206P691)
- ML20206P692 + (ML20206P692)
- 05000295/LER-1985-019, :on 850607,during Investigation of Noise Problem,Fuses Pulled & Replaced Causing Reactor Trip & Unexpected Closure of Msiv.Caused by Personnel Error. Summator 1PM505B Replaced + (ML20206P693)
- 05000255/LER-1986-023, :on 860724,design Problem Discovered Re Actuating Mechanism for Equalizing Valves on Containment Bldg Escape Airlock.Caused by Error in Actuating Cams Design.Cams Modified + (ML20206P694)
- ML20206P697 + (ML20206P697)
- ML20206P698 + (ML20206P698)
- ML20206P699 + (ML20206P699)
- ML20206P701 + (ML20206P701)
- ML20206P702 + (ML20206P702)
- ML20206P703 + (ML20206P703)
- ML20206P704 + (ML20206P704)
- 05000219/LER-1998-016, :on 981028,single DG Start,Occurred.Caused by Loss of One Source of Offsite Power.Generator Relay Surveillance Revised to Eliminate Possibility of Inadvertent Procedural Breaker Trips.With + (ML20206P707)
- ML20206P708 + (ML20206P708)
- 05000482/LER-1999-004, :on 990412,personnel Discovered That Direct Flow Path Had Been Created Between Containment Bldg Atmosphere & Auxiliary Bldg During Fuel Movement.Caused by Series of Personnel Errors.Operations Mgt Assigned + (ML20206P709)
- 3F0199-02, Submits Change in Analysis of Record for SBLOCA & 10CFR50.46 Notification.Attachment to Ltr Includes Description of How Limitations & Conditions Outlined in RELAP5 SER Are Addressed + (ML20206P710)
- PNO-III-87-054, on 870409,unit Manually Shut Down & Scrammed Following Vacuum Problem in Main Condenser & Increasing Temp in Hotwell.Caused by Partially Dislodged Ceiling Embedment Plate Supporting Portion of Lpci.Plate Repaired + (ML20206P712)
- ML20206P713 + (ML20206P713)
- ML20206P714 + (ML20206P714)
- ML20206P715 + (ML20206P715)
- ML20206P716 + (ML20206P716)
- ML20206P717 + (ML20206P717)
- ML20206P720 + (ML20206P720)
- ML20206P721 + (ML20206P721)
- NG-99-0678, Application for Amend to License DPR-49,revising SLMCPR to Support Operation with GE-12 Fuel with 10x10 Pin Array + (ML20206P723)
- PNO-III-87-055, on 870410-11,licensee Identified Several Steam Leaks in Main Steam Line & HPCI & RCIC Sys Declared Inoperable.Caused by Cracked Welds & Blown Fuse, Respectively.Reactor Shut Down for Steam Line Repairs + (ML20206P725)
- ML20206P726 + (ML20206P726)
- 05000382/LER-1998-021, :on 981210,boron Concentration Below TS Limit in SIT 2B,occurred.Caused by Lack of Complete Understanding of Cumulative Effects of Sys Design.B Concentration in SIT 2B Was Returned to within TS Required Concentrations + (ML20206P727)
- ML20206P728 + (ML20206P728)
- ML20206P729 + (ML20206P729)
- ML20206P732 + (ML20206P732)
- ML20206P733 + (ML20206P733)
- ML20206P734 + (ML20206P734)